Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
A Gilbert Plastering & Ceramic Tiling
73
photos of recent work
My Profile
My Feedback (145)
My Photos (73)
July 2008
Ceiling Work
Why not leave the hard work to the professionals
January 2009
Tiled kitchen walls. Farm house selection.
Randomly spaced oven glazed tiles. In keeping with the outlook of the house.
BEFORE
September 2009
Tile conservatory floor
View before work commenced
AFTER
September 2009
Tile conservatory floor
A Classic rustic quarry tile simulation
BEFORE
October 2009
Preparing wall for rendering
AFTER
October 2009
Rendering to house
Finished job
BEFORE
December 2009
Outside Step
Preparing layout to build step
AFTER
December 2009
Outside Step
Finished job
BEFORE
October 2009
Preparing wall for rendering
Scratch coat application
AFTER
October 2009
Rendering
Rendered Garden Wall
January 2009
Gleaming glossy white tiles with white bathroom suite
New tiles can give a bathroom that special look
January 2009
Glossy undulating white 10 inch tiles.
A new fresh look to your bathroom
BEFORE
October 2012
Tired bathroom walls
AFTER
October 2012
Finished job
DURING
September 2012
Preparing wall surface
AFTER
September 2012
Tyrolene finish
DURING
April 2012
Rebuilding lintel
DURING
August 2012
New coping stones to garden wall
AFTER
August 2012
Nicely rendered finish
DURING
April 2012
Checkered tiles in kitchen
Getting started
AFTER
April 2012
The checkered look
Finished job
DURING
February 2012
Laying Conservatory Floor
AFTER
March 2012
Finished Floor
BEFORE
April 2012
Prior to wall tiling
AFTER
April 2012
Finished job
BEFORE
September 2011
Remove stone cladding and old rendering. Apply new render.
AFTER
September 2011
Remove stone cladding and old rendering. Apply new render.
September 2011
Quarry Tiles to Step
BEFORE
October 2011
Log store cavity
begin construction within old fireplace
AFTER
October 2011
Log store cavity
Ornate log store finished
DURING
October 2011
Tiling behind cooker
Fire glazed tiles are added to the centre of personalsed cooker hood
AFTER
October 2011
Tiling behind cooker
Finished job
AFTER
October 2011
Job completed.
BEFORE
October 2011
Making preperation to start tiling kitchen walls
DURING
September 2011
Refurbish old bay ceiling
Exposed wood laths
AFTER
September 2011
Bay ceiling
boarded and skimmed. Just like new
September 2011
Quarry Tiles to front porch
Lovely deep terracotta finish to welcome guests at the front door.
DURING
September 2011
Floor tiling to kitchen, utility, hall and WC floor. All connecting.
Tiling started in kitchen
AFTER
September 2011
Tiling floors
Job completed with another satisfied customer
DURING
September 2011
Dry Lining small conservatory
During application of boards to walls
AFTER
September 2011
Dry lining small conservatory
Finished walls. Dry lined and skimmed.
DURING
July 2011
Garage wall rendered.
Just applied thick coat of waterproof render
AFTER
July 2011
Garage wall rendered.
Render rubbed up an smooth ready for painting
DURING
August 2011
Bathroom retiles, door step, livingdining rooms plastered.
The start of tiling bathroom walls
AFTER
August 2011
Bathroom retiles, door step, livingdining rooms plastered.
A grand finish for the customer
February 2009
Tiles to high rise balcony.
Heavy duty non slip tiles to a balcony 10 storeys high. The view was great
March 2009
Tiles to bath panel.
Ply wood bath panel is cut to size and then tiled in keeping with the bathroom walls. Undertaken Locksheath
September 2008
Another satisfied customer
March 2009
Newly tiled kitchen floor
Non slip floor tiles with ivory waterproof flexi grout in kitchen. Undertaken Stubbington
February 2009
Newly painted smooth render.
Always good to see the new render painted. Undertaken in the Portchester area.
June 2008
The perfect arched niche
Add character to your home by constructing an arch niche
April 2009
Classic 4 inch wall tiles to kitchen walls.
Nice effect using alternate spacings with application. Undertaken Stubbington
March 2009
Newly skimmed ceiling
Image of smooth skim to lounge ceiling. Job location Locksheath
BEFORE
July 2009
Floor preperation
Setting out alignments prior to laying tiles is essential
AFTER
July 2009
Floor Tiling in Dining Room
Slate grey tiles laid to screeded floor
BEFORE
July 2009
Skimmed Lounge Diner Walls Ceiling
AFTER
July 2009
Finished plaster painted
A view showing a transformed room after decoration
BEFORE
June 2009
Preperation for tiling kitchen floor
AFTER
June 2009
The finished job
Simulated slate ceramic floor tiles
BEFORE
October 2009
Archway Construction
A decorative archway is constructed freehand without using pre formed material
AFTER
August 2009
Archway Construction
Finished job
April 2009
Complete skim ceilings, walls application of floor tiles
August 2009
Floor Tling
Perfect contrast Black tiles with white grout
August 2009
Floor Tiles
Good contrast on bathroom floor
September 2009
Spanish Archway
Wide archway constructed
BEFORE
September 2009
Bathroom original condition
AFTER
September 2009
Bathroom fully tiled
Complete contrast in the fished job
BEFORE
November 2009
Preparing walls for tiling
AFTER
November 2009
Tiled walls in kitchen
Job completed
August 2009
Skimmed Chimney Brest
December 2009
Kitchen Wall Tiling
Crisp white gloss tiles add a fresh bright look to your kitchen
November 2009
Tiled Kitchen
November 2009
Self Leveler
Latex is laid to smooth out uneven floor
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?