Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
A P Meredith & Son
173
work photos
My Profile
Page
My Customer
Feedback
My Photos
November 2009
Building of fitted wardrobes drawers and tv unit to a flat in Hove
Full redecoration to room and wardrobes,including a papered panel wall,
November 2009
Building of fitted wardrobes drawers and tv unit to a flat in Hove
Full redecoration to room and wardrobes,including a papered panel wall,
November 2009
Building of fitted wardrobes drawers and tv unit to a flat in Hove
Full redecoration to room and wardrobes,including a papered panel wall,
November 2009
Building of fitted wardrobes drawers and tv unit to a flat in Hove
Full redecoration to room and wardrobes,including a papered panel wall,
August 2008
Building of fitted wardrobes, bridging units and bedside cabinets to a flat in Hove
Papered panel walls and full redecoration.
August 2008
Building of fitted wardrobes, bridging units and bedside cabinets to a flat in Hove
Papered panel walls and full redecoration.
August 2011
refurbishment of lounge
full redecoration, building of cupboards, and floating unit to take all tv and hifi appliances, tiling with underfloor heating.
August 2011
refurbishment of lounge
full redecoration, building of cupboards, and floating unit to take all tv and hifi appliances, tiling with underfloor heating.
August 2011
refurbishment of lounge
full redecoration, building of cupboards, and floating unit to take all tv and hifi appliances, tiling with underfloor heating.
August 2011
refurbishment of lounge
full redecoration, building of cupboards, and floating unit to take all tv and hifi appliances, tiling with underfloor heating.
August 2011
refurbishment of lounge
full redecoration, building of cupboards, and floating unit to take all tv and hifi appliances, tiling with underfloor heating.
August 2011
refurbishment of lounge
full redecoration, building of cupboards, and floating unit to take all tv and hifi appliances, tiling with underfloor heating.
AFTER
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
AFTER
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
AFTER
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
AFTER
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
AFTER
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
AFTER
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
DURING
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
DURING
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
DURING
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
BEFORE
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
BEFORE
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
BEFORE
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
BEFORE
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
BEFORE
October 2011
Kitchen refurbishment
full kitchen installation, plastering, redecoration tiling and laying oak floor
BEFORE
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
BEFORE
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
BEFORE
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
BEFORE
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
BEFORE
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
AFTER
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
AFTER
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
AFTER
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
AFTER
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
AFTER
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
AFTER
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
AFTER
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
AFTER
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
AFTER
August 2011
External redecoration.
full redecoration of a building in hove, including carpentry repairs, and rebuilding of front balcony.
September 2011
Kitchen refurbishment
kitchen installation, solid oak floor layed, white granite worktops, and full redecoration.
September 2011
Kitchen refurbishment
kitchen installation, solid oak floor layed, white granite worktops, and full redecoration.
September 2011
Kitchen refurbishment
kitchen installation, solid oak floor layed, white granite worktops, and full redecoration.
August 2011
Kitchen refurbishment
kitchen installation, full redecoration, floor tiling with underfloor heating.
August 2011
Kitchen refurbishment
kitchen installation, full redecoration, floor tiling with underfloor heating.
August 2011
Kitchen refurbishment
kitchen installation, full redecoration, floor tiling with underfloor heating.
August 2011
Kitchen refurbishment
kitchen installation, full redecoration, floor tiling with underfloor heating.
August 2011
Kitchen refurbishment
kitchen installation, full redecoration, floor tiling with underfloor heating.
BEFORE
May 2010
Kitchen complete replacement
Old Kitchen, before complete refurbishment
BEFORE
May 2010
Kitchen complete replacement
Old Kitchen, before complete refurbishment
DURING
May 2010
Kitchen complete replacement
Old Kitchen, before complete refurbishment
DURING
May 2010
Kitchen complete replacement
Old Kitchen, before complete refurbishment
DURING
May 2010
Kitchen complete replacement
Stripped out room
DURING
May 2010
Kitchen complete replacement
DURING
May 2010
Kitchen complete replacement
Stripped out room
DURING
May 2010
Kitchen complete replacement
DURING
May 2010
Kitchen complete replacement
May 2010
Kitchen complete replacement
DURING
May 2010
Kitchen complete replacement
DURING
May 2010
Kitchen complete replacement
DURING
May 2010
Kitchen complete replacement
DURING
May 2010
Kitchen complete replacement
DURING
May 2010
Kitchen complete replacement
DURING
May 2010
Kitchen complete replacement
First units being fitted.
DURING
May 2010
Kitchen complete replacement
DURING
May 2010
Kitchen complete replacement
Preparation before tiling.
DURING
May 2010
Kitchen complete replacement
Floor tiling completed
DURING
May 2010
Kitchen complete replacement
Start of wall tiling
AFTER
May 2010
Kitchen complete replacement
Breakfast bar area.
AFTER
May 2010
Kitchen complete replacement
AFTER
May 2010
Kitchen complete replacement
AFTER
May 2010
Kitchen complete replacement
Finished Article
August 2011
Hall stairs and landing,
full redecoration of centre island including stripping handrails, and waxing.
August 2011
Hall stairs and landing,
full redecoration of centre island including stripping handrails, and waxing.
August 2011
Hall stairs and landing,
full redecoration of centre island including stripping handrails, and waxing.
August 2011
Hall stairs and landing,
full redecoration of centre island including stripping handrails, and waxing.
August 2011
refurbishment of nursery in albourne
full redecoration including papered panel wall all pastel farrow and ball colours
August 2011
refurbishment of nursery in albourne
full redecoration including papered panel wall all pastel farrow and ball colours
August 2011
refurbishment of nursery in albourne
full redecoration including papered panel wall all pastel farrow and ball colours
August 2011
refurbishment of nursery in albourne
full redecoration including papered panel wall all pastel farrow and ball colours
August 2011
refurbishment of nursery in albourne
full redecoration including papered panel wall all pastel farrow and ball colours
August 2011
refurbishment of nursery in albourne
full redecoration including papered panel wall all pastel farrow and ball colours
August 2011
refurbishment of nursery in albourne
full redecoration including papered panel wall all pastel farrow and ball colours
August 2011
refurbishment of nursery in albourne
full redecoration including papered panel wall all pastel farrow and ball colours
August 2011
full refurbishment of bathroom
August 2011
full refurbishment of bathroom
August 2011
full refurbishment of bathroom
August 2011
full refurbishment of bathroom
August 2011
full refurbishment of bathroom
August 2011
redecoration of front elevation to a property in hove
August 2011
redecoration of front elevation to a property in hove
August 2011
re render and decorate property in hove
hack off all defective render, re render the whole property and decorate.
August 2011
re render and decorate property in hove
hack off all defective render, re render the whole property and decorate.
August 2011
re render and decorate property in hove
hack off all defective render, re render the whole property and decorate.
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
hallway refurbishment
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
hallway refurbishment
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
hallway refurbishment
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
hallway refurbishment
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
hallway refurbishment
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
hallway refurbishment
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
full kitchen installation, plastering, redecoration and tiling
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
full kitchen installation, plastering, redecoration and tiling
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
full kitchen installation, plastering, redecoration and tiling
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
full kitchen installation, plastering, redecoration and tiling
May 2011
roof terrace
building of roof terrace and staining
May 2011
roof terrace
building of roof terrace and staining
July 2011
roof terrace
building of roof terrace and staining
May 2011
roof terrace
building of roof terrace and staining
May 2011
roof terrace
building of roof terrace and staining
May 2011
roof terrace
building of roof terrace and staining
October 2010
Kitchen refurbishment
Full kitchen installation, redecoration and tiling
October 2010
Kitchen refurbishment
Full kitchen installation, redecoration and tiling
October 2010
Kitchen refurbishment
Full kitchen installation, redecoration and tiling
October 2010
Kitchen refurbishment
Full kitchen installation, redecoration and tiling
October 2010
Kitchen refurbishment
Full kitchen installation, redecoration and tiling
October 2010
Kitchen refurbishment
Full kitchen installation, redecoration and tiling
October 2010
Kitchen refurbishment
Full kitchen installation, redecoration and tiling
July 2011
Painting and decorating.
full kitchen redecoration and tiling.
July 2011
Painting and decorating.
full kitchen redecoration and tiling.
July 2011
Painting and decorating.
full kitchen redecoration and tiling.
July 2011
Painting and decorating.
full kitchen redecoration and tiling.
July 2011
Painting and decorating.
full kitchen redecoration and tiling.
July 2011
Painting and decorating.
full kitchen redecoration and tiling.
July 2011
Painting and decorating.
full kitchen redecoration and tiling.
July 2011
Painting and decorating.
full kitchen redecoration and tiling.
August 2011
painting and decorating
full kitchen redecoration and tiling.
July 2011
Painting and decorating.
full kitchen redecoration and tiling.
July 2011
Painting and decorating.
full redecoratin and bathroom installation
July 2011
Painting and decorating.
full redecoratin and bathroom installation
July 2011
Painting and decorating.
full redecoration of lounge
July 2011
Painting and decorating.
full redecoration of lounge
July 2011
Painting and decorating.
full redecoration of lounge
July 2011
Painting and decorating.
full redecoration of lounge
July 2011
Painting and decorating.
full redecoration of lounge
July 2011
Painting and decorating.
full redecoration of lounge
July 2011
Painting and decorating.
full redecoration of lounge
DURING
July 2011
Painting and decorating.
DURING
July 2011
Painting and decorating.
full redecoration to exterior of house
DURING
July 2011
Painting and decorating.
full redecoration of hall stairs and landing
BEFORE
May 2009
Full rip out of old bathroom, and refurbish.
BEFORE
May 2009
Full rip out of old bathroom, and refurbish.
BEFORE
May 2009
Full rip out of old bathroom, and refurbish.
BEFORE
May 2009
Full rip out of old bathroom, and refurbish.
DURING
May 2009
Full rip out of old bathroom, and refurbish.
Room stripped out
DURING
May 2009
Full rip out of old bathroom, and refurbish.
first pieces of suite being fitted
AFTER
May 2009
Full rip out of old bathroom, and refurbish.
AFTER
May 2009
Full rip out of old bathroom, and refurbish.
AFTER
May 2009
Full rip out of old bathroom, and refurbish.
AFTER
May 2009
Full rip out of old bathroom, and refurbish.
AFTER
May 2009
Full rip out of old bathroom, and refurbish.
BEFORE
November 2010
Small toilet Refurbishment
AFTER
May 2009
Finished Small Toilet
February 2008
Building of fitted wardrobes to a flat in Worthing
Full refurbishment od bedroom including plastering and putting up a new ceiling.
February 2008
Building of fitted wardrobes to a flat in Worthing
Full refurbishment of bedroom including plastering and putting up a new ceiling.
February 2008
Building of fitted wardrobes to a flat in Worthing
Full refurbishment of bedroom including plastering and putting up a new ceiling.
January 2009
Full refurbishment of hallway in worthing
Hang six new doors, build radiator box, build a concealed shoe cupboard under the stairs, fit coving, fully redecorate
January 2009
Full refurbishment of hallway in worthing
Hang six new doors, build radiator box, build a concealed shoe cupboard under the stairs, fit coving, fully redecorate
January 2009
Full refurbishment of hallway in worthing
Hang six new doors, build radiator box, build a concealed shoe cupboard under the stairs, fit coving, fully redecorate
January 2009
Full refurbishment of hallway in worthing
Hang six new doors, build radiator box, build a concealed shoe cupboard under the stairs, fit coving, fully redecorate
July 2010
Building a wooden deck and pergola
Built all timberwork and stained to create the dark finish
July 2010
Building a wooden deck and pergola
Built all timberwork and stained to create the dark finish
July 2010
Building a wooden deck and pergola
Built all timberwork and stained to create the dark finish
July 2010
Building a wooden deck and pergola
Built all timberwork and stained to create the dark finish
July 2010
Building a wooden deck and pergola
Built all timberwork and stained to create the dark finish
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
Installation of new bathroom suite, wall tiling, and redecoration.
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
Installation of new bathroom suite, wall tiling, and redecoration.
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
Decoration of bedroom 3
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
Decoration of bedroom 2
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
Decoration of bedroom 2
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
Decoration of bedroom.
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
Decoration of bedroom.
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
Dining room redecoration, including papered panel walls
December 2002
Decoration of 3 bedrooms, bathroom and dining room.
Dining room redecoration, including papered panel walls
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?