Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Affordable Roofs
65
photos of recent work
My Profile
My Feedback (34)
My Photos (65)
DURING
March 2011
reroof
back of bungalow new felt and batten
DURING
March 2011
reroof
new valley on front of bungalow
DURING
March 2011
reroof to bungalow
front of bungalownew felt and batten
AFTER
March 2011
re roof complete
side of bungalow tiled with hips
AFTER
March 2011
re roof complete
back of bungalow tiled
AFTER
March 2011
re roof
new valley tiled in
AFTER
March 2011
re roof complete
bungalow finished scaffold down
AFTER
March 2011
re roof
bungalow finished scaffold down
AFTER
March 2011
re roof completed
bungalow finished scaffold down
DURING
February 2011
re roof
new felt and redland 49 tiles
DURING
February 2011
re roof
redland 49 tile hip preperation
DURING
February 2011
reroof
redland 49 tile in progress
AFTER
December 2011
Flat roof
DURING
February 2011
reroof
redland 49 jobin progress
AFTER
February 2011
completed reroof
redland 49 tile on bungalow with new fascia and guttering
AFTER
February 2011
reroof completion
completed bungalow with redland49 tile, and new fascia and guttering
BEFORE
November 2010
Renew double garage flat roof
large area of flat roof with ridge on the upstands.
BEFORE
November 2010
double garage flat roof
garage roof stripped to wooden decking
BEFORE
November 2010
double garage flat roof
first layer 3H
BEFORE
November 2010
double garage flat roof
2nd layer 3B
AFTER
November 2010
double garage flat roof
finished roof with white limestone chippings.
DURING
March 2011
kitchen extension flat roof
first ventilated layer 3h
AFTER
March 2011
finished flat roof
white lime stone chippings finish
BEFORE
November 2010
Full replacement of garage roof in a block.
this garage roof was decked with strumit board which is no longer made so the decking had to be replaced.
BEFORE
November 2010
Full replacement of garage roof in a block.
to replace the strumitboard with 18mm fire approved decking we had to add additional joists.
BEFORE
November 2010
Full replacement of garage roof in a block.
this is the new 18mm fire approved decking.
BEFORE
November 2010
Full replacement of garage roof in a block.
this is the 3H ventilated felt
BEFORE
November 2010
Full replacement of garage roof in a block.
this is the second layer with extra felt up both sides to seam to the garages either side.
BEFORE
November 2010
Flat roof covering.
original roof with felt that is cracked and causing it to leak
BEFORE
October 2010
Replacement of flat roof.
this is the roof stripped to the wooden decking ready for the new felt to be layed
BEFORE
November 2010
Flat roof covering.
this is the first layer of felt called 3H ventilated
BEFORE
November 2010
Flat roof covering.
this is the 2nd layer of felt called 3B
AFTER
November 2010
Flat roof covering.
this is the completed job with white imestone chippings to finish the roof.
BEFORE
April 2010
Replaced porch flat roof.
green mineral finish flat roof
BEFORE
April 2010
Replaced flat roof.
stripped porch roof
AFTER
April 2010
Replaced flat roof.
finished in green mineral
AFTER
April 2010
Replaced flat roof.
front and side drips
BEFORE
June 2010
Flat roof.
this is second stage removing existing 3 layer felt, this was a very large area.
BEFORE
June 2010
Flat roof.
this was the start of the roof renewel.
BEFORE
June 2010
Flat roof.
this is 3rd stage ventilated layer this is known as 3H and is the first new layer to be put on flat roof.
BEFORE
June 2010
Flat roof.
this is the 2nd layer to be torched on over the 3H and front drips over the top.
AFTER
June 2010
Flat roof.
this is the final layer which has been done with green torch on glass tech all our flat roofs are garunteed for 10 years.
DURING
April 2011
reroof felted and battened
felt and batten on redland 49 gauge
DURING
April 2011
reroof to bungalow
side of r
DURING
April 2011
reroof to bungalow
front of bungalow felt and batten
DURING
April 2011
side of bungalow
tiles set out for hips and ridge
DURING
April 2011
re roof
redland 49 farm house red dry valley system fitted
DURING
April 2011
re roof
roof tiled for hips and ridge
AFTER
April 2011
Strip and retile
front of house
AFTER
April 2011
Strip and retile
side of bungalow tiled with hips new valley and lead flashing round chimney
AFTER
April 2011
Strip and retile
longest side of bungalow
AFTER
April 2011
Strip and retile
back of bungalow tiled
BEFORE
May 2011
flat roof
this flat roof flshing was lifting
BEFORE
May 2011
very high flat roof
lead flashing was lifting in the wind exposing wood underneath.
AFTER
May 2011
very high flat roof
ghanged to green mineral finish with ridges to hold down the lead flasfing
AFTER
May 2011
chimney repair
cement work to chimney
BEFORE
May 2011
clay tile roof
before reroof
BEFORE
May 2011
clay tile roof
old tilesbefore reroof
DURING
May 2011
tiles stripped
feather edge exposed
DURING
May 2011
reroof
tiles and feather edge off.
DURING
May 2011
reroof felted and battened
reroof felt and battened
DURING
May 2011
reroof
tiles layed for hips
AFTER
May 2011
re roof completed
side of house with hips meeting at the top
AFTER
May 2011
re roof completed
front of house with hip divideer
AFTER
May 2011
re roof complete
back of house complete with hips and hip divider
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?