Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
All Trades
127
photos of recent work
My Profile
My Feedback (45)
My Photos (127)
April 2012
Ensuite conversion - work undertaken by All Trades
New room built with stud wall, door frame, UPVC window, drain run
April 2012
New ensuite - work undertaken by All Trades
Bedroom built in cupboard removed, stud wall with doorway, new window, drainage to new inspection chamber, fully tiled
May 2011
Bathroom refurbishment.in Guildford
L shape shower bath - work undertaken by All Trades
March 2012
Drainage - work undertaken by All Trades
4 metre drain run to new inspection chamber
May 2012
Cloak room tiling - work undertaken by All Trades
Coloured glass splashback and porcelain floor with upstands
June 2011
Oak floor laid in hallway in Guildford
Take off skirtings, carpet, lay oak floor, refit skirtings - work undertaken by All Trades
May 2011
Bathroom refurbishment in Guildford - work undertaken by All Trades
Underfloor heating, plastered ceiling, built in units, recessed shower
April 2012
Cloakroom bathroom refurbishment - work undertaken by All Trades
2 rooms knocked into 1, p shape shower bath, fully tiled, plastered ceiling with downlights
March 2012
Windows - work undertaken by All Trades
Replacement of 2 third floor windows
September 2010
Internal doors, upvc porch, cupboard around boiler, relay hip tiles
Renovated porch with UPVC capit board
May 2012
New bathroom designed and fitted old bathroom ripped out.
Fitted units
June 2012
Pipe freezer for changing radiator valves
AFTER
December 2012
Refurbishment of shower cubicle.
DURING
December 2012
Refurbishment of shower cubicle.
DURING
December 2012
Refurbishment of shower cubicle.
DURING
December 2012
Refurbishment of shower cubicle.
BEFORE
December 2012
Refurbishment of shower cubicle.
BEFORE
December 2012
Refurbishment of shower cubicle.
December 2012
Inspection hatches fitted to give access to hidden boiler flues.
December 2012
Inspection hatches fitted to give access to hidden boiler flues.
December 2012
Inspection hatches fitted to give access to hidden boiler flues.
cutting holes
December 2012
Bathroom refurb.
tiled porcelain floor
December 2012
Bathroom refurb.
chrome ladder radiator, humidistat extractor
December 2012
Bathroom refurb.
close coupled toilet, boxed in pipework and void built adjacent to bath
December 2012
Bathroom refurb.
vanity unit and basin, illuminated mirror
December 2012
Bathroom refurb.
rain head, overflow filler, hose and hand set, 3 way valve
December 2012
Bathroom refurb.
walls skimmed, unit fitted, low level boxing
December 2012
Bathroom refurb.
Stud wall and 3 way valve fitted
December 2012
Bathroom refurb.
Artex ceiling before
December 2012
Bathroom refurb.
bidet and radiator removed
December 2012
Bathroom refurb.
Before
November 2012
Seal kitchen floor with resin, lay vinyl, install shower screen, tile bathroom floor having removed
Finished floor
November 2012
Seal kitchen floor with resin, lay vinyl, install shower screen, tile bathroom floor having removed
Close up of membrane
November 2012
Seal kitchen floor with resin, lay vinyl, install shower screen, tile bathroom floor having removed
F76 epoxy 2 part membrane applied
November 2012
Seal kitchen floor with resin, lay vinyl, install shower screen, tile bathroom floor having removed
Damp floor
October 2012
Out side decking.
October 2012
Out side decking.
October 2012
Out side decking.
December 2012
Cut out for two louvers.
both louvres finished
December 2012
Cut out for two louvers.
grill fitted
December 2012
Cut out for two louvers.
Lintel put in, make good brickwork, air con box fitted
December 2012
Cut out for two louvers.
Before
November 2012
Convert bathroom into wetroom.
toilet to new position, low level boxing
November 2012
Convert bathroom into wetroom.
illuminated mirrors
November 2012
Convert bathroom into wetroom.
plaster skim ceiling with downlighters
November 2012
Convert bathroom into wetroom.
new oak vanity units, towel rail to new position
November 2012
Convert bathroom into wetroom.
new walk in shower wet room
November 2012
Convert bathroom into wetroom.
November 2012
Convert bathroom into wetroom.
vanity units and toilet before
November 2012
Convert bathroom into wetroom.
bath before
November 2012
Refit of built in wardrobes.
wardrobe boarded up to become full length in bed 1
November 2012
Refit of built in wardrobes.
fitted shelves and rails
November 2012
Refit of built in wardrobes.
wall removed and full length sliding mirror doors
November 2012
Refit of built in wardrobes.
wardrobe before bedroom 2
November 2012
Refit of built in wardrobes.
wardrobe before
November 2012
Removal of fireplace and artex wall surface. New plasterboard, coving and skirting board fitted. F
New skirtings, coving, electric sockets
November 2012
Removal of fireplace and artex wall surface. New plasterboard, coving and skirting board fitted. F
Floor levelled with deep fill latex
November 2012
Removal of fireplace and artex wall surface. New plasterboard, coving and skirting board fitted. F
fireplace removed, plasterboarded wall, tape and joint
October 2012
Gutted old bathroom and replaced with new. Replaced 2 showers, fridge and oven.
October 2012
Gutted old bathroom and replaced with new. Replaced 2 showers, fridge and oven.
Replacement vinyl, toilet, vanity sink, heated towel rail
October 2012
Gutted old bathroom and replaced with new. Replaced 2 showers, fridge and oven.
Replacement bath, shower valve, cladded panel and boxing
October 2012
Alterations to bathroom to suit disabled user.
Completed wet area walk in shower
October 2012
Alterations to bathroom to suit disabled user.
Raised height toilet, drop down rails, curved shower screen
October 2012
Alterations to bathroom to suit disabled user.
Fold down shower seat, grab rails, new aqualisa shower valve
October 2012
Alterations to bathroom to suit disabled user.
Altro aquarius flooring
October 2012
Alterations to bathroom to suit disabled user.
quadrant shower being removed
October 2012
Alterations to bathroom to suit disabled user.
Leaking shower, rotten studs, mouldy plasterboards
October 2012
Refurbishment of bathroom to provide a wet room area with new tiling, flooring and WC. Hand basin b
October 2012
Refurbishment of bathroom to provide a wet room area with new tiling, flooring and WC. Hand basin b
October 2012
Refurbishment of bathroom to provide a wet room area with new tiling, flooring and WC. Hand basin b
October 2012
Refurbishment of bathroom to provide a wet room area with new tiling, flooring and WC. Hand basin b
October 2012
Refurbishment of bathroom to provide a wet room area with new tiling, flooring and WC. Hand basin b
October 2012
Refitted my second bathroom. Installed new shower and toilet.
October 2012
Refurbishment of bathroom to provide a wet room area with new tiling, flooring and WC. Hand basin b
October 2012
Refitted my second bathroom. Installed new shower and toilet.
October 2012
Refitted my second bathroom. Installed new shower and toilet.
October 2012
Refitted my second bathroom. Installed new shower and toilet.
October 2012
Refitted my second bathroom. Installed new shower and toilet.
AFTER
September 2012
Building and fitting Jack and Jill en suite.
AFTER
September 2012
Building and fitting Jack and Jill en suite.
AFTER
September 2012
Building and fitting Jack and Jill en suite.
AFTER
September 2012
Building and fitting Jack and Jill en suite.
AFTER
September 2012
Building and fitting Jack and Jill en suite.
DURING
September 2012
Building and fitting Jack and Jill en suite.
DURING
September 2012
Building and fitting Jack and Jill en suite.
DURING
September 2012
Building and fitting Jack and Jill en suite.
BEFORE
September 2012
Building and fitting Jack and Jill en suite.
BEFORE
September 2012
Building and fitting Jack and Jill en suite.
AFTER
September 2012
Replacement of back door and frame with UPVC door and frame.
AFTER
September 2012
Replacement of back door and frame with UPVC door and frame.
AFTER
September 2012
Replacement of back door and frame with UPVC door and frame.
BEFORE
September 2012
Replacement of back door and frame with UPVC door and frame.
BEFORE
September 2012
Replacement of back door and frame with UPVC door and frame.
July 2012
Ripped out and replaced entire bathroom including tiles.
July 2012
Ripped out and replaced entire bathroom including tiles.
July 2012
Ripped out and replaced entire bathroom including tiles.
July 2012
Ripped out and replaced entire bathroom including tiles.
July 2012
Repair to concrete between driveway and step into garden.
July 2012
Repair to concrete between driveway and step into garden.
July 2012
Masonry Repairs
First stage of reshaping
July 2012
Masonry Repairs
Sand and cement repair awaiting to be smoothed with toupret
July 2012
Masonry Repairs
Ornate masonry reshaped with toupret
July 2012
Masonry Repairs
Ornate masonry reshaped with toupret
July 2012
Masonry Repairs
Sand and cement repair, awaiting to be smoothed with toupret filler
July 2012
Masonry Repairs
Detailed note repaired and before filling with toupret
June 2012
Full ensuite replacement including spot lights, extractor heated towel rail.
close coupled toilet, new boxing, accessories fitted
June 2012
Full ensuite replacement including spot lights, extractor heated towel rail.
recessed shower valve, 800 quadrant low profile tray and screen
June 2012
Full ensuite replacement including spot lights, extractor heated towel rail.
new towel radiator, tiled floor
June 2012
Full ensuite replacement including spot lights, extractor heated towel rail.
fully tiled room with pencil borders
June 2012
Full ensuite replacement including spot lights, extractor heated towel rail.
fully refurbished shower room
June 2012
Fitting kitchen worktops
June 2012
Tiling
June 2012
Plastering
October 2011
Cloakroom renovation - work undertaken by All Trades
half height tiles, modified vanity unit to hide water softener, moved towel radiator
May 2012
New bathroom designed and fitted old bathroom ripped out.
designer towel rail, blind, glass screen, mid height border
May 2012
New bathroom designed and fitted old bathroom ripped out.
walk in shower, tiled floor
May 2012
New bathroom designed and fitted old bathroom ripped out.
3.0 bar shower panel with body jets
September 2010
Internal doors, upvc porch, cupboard around boiler, relay hip tiles
Build cupboard around boiler
September 2010
Internal doors, upvc porch, cupboard around boiler, relay hip tiles
Hang 7 new internal doors
September 2010
Internal doors, upvc porch, cupboard around boiler, relay hip tiles
Relay and point loose hip tiles
May 2011
Bathroom refurbishment.in Guildford
work undertaken by All Trades
June 2011
Oak floor laid in hallwayin Guildford
Finished floor - work undertaken by All Trades
May 2011
Bathroom refurbishment in Guildford
Built in units - work undertaken by All Trades
AFTER
April 2012
Two replacement third floor windows.in Farnborough
New windows, top floor - work undertaken by All Trades
AFTER
April 2012
Two replacement third floor windows in Farnborough
Finished window - work undertaken by All Trades
April 2012
Two replacement third floor windows in Farnborough
Old window removed, new one prepared to be fitted - work undertaken by All Trades
BEFORE
April 2012
Two replacement third floor windows in Farnborough
Existing windows - work undertaken by All Trades
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?