0845 408 4866
Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Amberley Roofing
45
work photos
My Profile
Page
My Customer
Feedback
My Photos
February 2009
loft conversion in aldwick
we did blockwork and timber work and roof and windows
February 2009
new roof in elmer
strip off existing roof covering and replace
February 2009
lead box gulley replaced with G,R,P
removed old lead and over boarded with plywood
February 2009
G.R.P box gulley more durable and no joins
2 layer gel coat
February 2009
poor state of repair chimney in bognor
recemented and made good charged 75 pounds
February 2009
job completed watertight and structuraly sound
February 2009
reroof and loft conversion in yapton
complete job start to finish
February 2009
March 2009
box gulley in pagam ply linned
G.R.P is a good substitute for lead with no joins or need for expansion
March 2009
fibre glassed box gulley
BEFORE
July 2011
bogner mini tornado 10.30 am
mini twister ripped through koyoto court removing ridges on many houses
AFTER
July 2011
4.00pm after mini tornado
wind dropped and was able to repair roof same day
BEFORE
August 2011
old buildings just befor demolished to make way for new garage build
DURING
August 2011
footing dug and filled with concrete and first coarse of blocks laid
DURING
August 2011
brick work completed
DURING
August 2011
timber joist and steel r.s.j fitted and decked out
DURING
August 2011
roof decked out ready for felt roof
AFTER
August 2011
electric door fitted and garage finished ,ALL WORK WAS CARRIED OUT BY AMBERLEY ROOFING FROM START TO
AFTER
August 2011
garage roof felted
BEFORE
August 2011
lead box gulley laid in one piece and split through expansion
DURING
August 2011
box gulley timber lined prepaired for g.r.p
AFTER
August 2011
g.r.p laid and set
DURING
August 2011
chimney removal
DURING
August 2011
chimney removal
DURING
August 2011
chimney removed to under roofline and installed concrete lintols and new rafters
AFTER
August 2011
retiled and new brickwork completeing parapit wall
BEFORE
August 2011
chimney in need of repointing
AFTER
August 2011
chimney repointed
DURING
August 2011
Repairing balcony and replacing metal railings.
stripped of roof covering and rotten decking and replaced
AFTER
August 2011
Repairing balcony and replacing metal railings.
grp fibreglass roof covering and fabricated metal railings
AFTER
August 2011
Repairing balcony and replacing metal railings.
DURING
August 2011
reroof
AFTER
August 2011
reroof elmer
February 2009
March 2009
new box gulley ply linned
March 2009
redecking garage roof pagham
March 2009
flat dormer roof aldwick
March 2009
finished dormer on loft conversion
March 2009
finished G,R,P box gulley comes in various colours gellcoat
March 2009
conected toilet to drain on loft conversion
March 2009
chimney rerendered
BEFORE
December 2009
Roof tile repair, repointing chimney, replacing ridge tiles
chimney before repointing
AFTER
December 2009
Roof tile repair, repointing chimney, replacing ridge tiles
repointed chimney
March 2009
loft conversion in elmer 2008
BEFORE
March 2010
Re roofed single garage, replacing 3 joists.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?