Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
ARC Brickwork and Building Contractors Limited
167
photos of recent work
My Profile
My Feedback (166)
My Photos (167)
March 2009
nice house
done foundations and brickwork..
July 2007
nice house.
built it and done foundations.
March 2009
patio steps
November 2008
patio,and steps..
March 2009
nice wall..
July 2008
nice wall with herring bone panels..
built it
March 2009
nice wall,with radius,herring bone and stone work.
built it.
December 2010
Kitchen,and diner,extension,tiling,underfloor heating,etc.
December 2010
Kitchen,and diner,extension,tiling,underfloor heating,etc.
December 2010
DOUBLE DOORS INTO STUDY.
December 2010
Kitchen,and diner,extension,tiling,underfloor heating,etc.
December 2010
NICE RAD.
April 2013
ROOF CARPENTRY
April 2013
ROOF CARPENTRY
April 2013
ROOF CARPENTRY
April 2013
Roof carpentry
April 2013
Sky lights
April 2013
New bathroom
April 2013
Floating sink
April 2013
New bathroom
April 2013
New bathroom
April 2013
New wet room
April 2013
Touch sensor mirror
April 2013
Wet shower room
April 2013
Range master
April 2013
Wall nut work top
April 2013
New kitchen
April 2013
New kitchen
April 2013
Bifolds with glass blinds
April 2013
Loft conversion
April 2013
Extension,loft conversion
April 2013
New kitchens
April 2013
Decorative plaster works
April 2013
Decorative plaster works
April 2013
Nice lighting
April 2013
Tanking for wet room
April 2013
New bathroom
April 2013
New bathroom
April 2013
New bathroom
April 2013
New bathroom
April 2013
New bathroom
April 2013
Steel work
April 2013
Steelwork
April 2013
New drainage
April 2013
Drainage
April 2013
New water mains
BEFORE
June 2011
Garage conversion.
BEFORE
June 2011
Garage conversion.
AFTER
June 2011
Garage conversion.
BEFORE
June 2011
Complete patio with drainge round pond and house.
DURING
June 2011
Complete patio with drainge round pond and house.
DURING
June 2011
Complete patio with drainge round pond and house.
AFTER
June 2011
Complete patio with drainge round pond and house.
AFTER
June 2011
Complete patio with drainge round pond and house.
AFTER
June 2011
Complete patio with drainge round pond and house.
BEFORE
June 2011
Kitchin refurb new floors,plaster,electrics,plumbing,carpentry
DURING
June 2011
Kitchin refurb new floors,plaster,electrics,plumbing,carpentry
DURING
June 2011
Kitchin refurb new floors,plaster,electrics,plumbing,carpentry
DURING
June 2011
Kitchin refurb new floors,plaster,electrics,plumbing,carpentry
DURING
June 2011
Kitchin refurb new floors,plaster,electrics,plumbing,carpentry
AFTER
August 2011
New kitchen refurb..
BEFORE
February 2011
Complete kitchin refurb..
AFTER
June 2011
New kitchin.
AFTER
June 2011
New kitchin.
AFTER
June 2011
New kitchin.
December 2010
Kitchen,and diner,extension,tiling,underfloor heating,etc.
December 2010
Kitchen,and diner,extension,tiling,underfloor heating,etc.
September 2010
Kitchen extension, brick work, block work, ground work.
March 2009
tile sills...
March 2009
fair faced blockwork for painting
built it.
March 2009
nice elavation....
March 2009
monster wall..
September 2010
PATHWAY..
AFTER
July 2010
new loo under their stairs and tiling..
moved toilet from hall under stairs
November 2007
chimney with lead dressing
built it.
February 2009
fair faced blockwork.
built it.
AFTER
June 2011
Garage conversion.
March 2009
house i built..in a garden...
October 2009
New kitchen and tiling
March 2009
old bosses house we built.
March 2009
blockwork..
AFTER
June 2011
Garage conversion.
March 2009
extension.......
October 2009
New kitchen and tiling
October 2009
New kitchen and tiling
March 2009
extension.and garage conversion.
March 2009
Pointing brickwork on bungalow, garage and paved garden
March 2009
Pointing brickwork on bungalow, garage and paved garden
April 2009
toothing out,putting back,with coloured mortar
April 2009
toothed out,cleaned,cavity due to damp,replaced with coloured mortar
May 2009
knock through...
May 2009
extension...
May 2009
extension
May 2009
extension
May 2009
extension
May 2009
stack
May 2009
stack...
June 2009
concrete piers..
June 2009
concrete piers for steels
June 2009
steels and concrete piers...
June 2009
steels knock throughs and piers..and parting walls..
April 2006
Brickwork, flats, houses, apartments, stone work more than one job
did flint blockwork and arch and stone..
July 2009
london tabard street
9inch flemish with re,used bricks,and lime mortar
July 2009
london tabard street
July 2009
extension....
July 2009
london..
building it..
July 2009
building wall..
July 2009
cut out ready for repointing.....
July 2009
repointing.
August 2009
garden wall...with stone capping and railings..
August 2009
garden wall cappings and railings..
September 2009
9inch concrete wall..
September 2009
9inch wall
BEFORE
September 2009
extension..
BEFORE
September 2009
extension
September 2009
foundations with reinforcement bars..
AFTER
September 2009
extension...
September 2009
internal blockwork..with vents for boiler cuboard....
September 2009
concrete slab...
September 2009
cavity....
April 2006
Brickwork, flats, houses, apartments, stone work more than one job
flats
April 2006
Brickwork, flats, houses, apartments, stone work more than one job
flats
April 2006
Brickwork, flats, houses, apartments, stone work more than one job
April 2006
Brickwork, flats, houses, apartments, stone work more than one job
April 2006
Brickwork, flats, houses, apartments, stone work more than one job
April 2006
Brickwork, flats, houses, apartments, stone work more than one job
April 2006
Brickwork, flats, houses, apartments, stone work more than one job
October 2009
nice little garden wall
October 2009
9inch garden wall
April 2006
Brickwork, flats, houses, apartments, stone work more than one job
very big slab..
October 2009
repoint london..
lime gritt mortar
October 2009
pointing
lime
October 2009
pointing
lime grit mortar
October 2009
re point...
cut out..
October 2009
building triangle extension
October 2009
triangle extension
October 2009
squint blockwork corner
October 2009
triangle extension with brick squint detail..
October 2009
triangle extension
October 2009
extension
October 2009
extension
October 2009
nice flank....
April 2010
strip foundations for extension
April 2010
foundations..
Dug them.
AFTER
April 2010
extension..
blockwork 4 render..
April 2010
extension..
cavity work.long flank..
BEFORE
April 2010
knocked down chimneys and brest stacks.
BEFORE
April 2010
knocking down stacks.
AFTER
April 2010
made good etc..render to match existing sponge finish..afder removing stacks..
AFTER
July 2010
Extension, drainage, roof, tiling, carpentry etc
extension Garage..With old reclaimed bricks..
July 2010
Extension, drainage, roof, tiling, carpentry etc
July 2010
patio steps..at rear of extension in 2 garden..
June 2010
Extension, drainage, roof, tiling, carpentry etc
July 2010
New tiled floor with black grout...
August 2010
HONEYCOMBE BRICKWORK SOAKAWAY
BEFORE
August 2010
KNOCKING DOWN..
AFTER
August 2010
BRICKWORK AND OVERSITE AND FOUNDATIONS.
August 2010
BRICKWORK GROUND WORK FOR PORCH..
August 2010
VERY DEEP FOUNDATION DUE TO STORM DRAIN INSPECSION CHAMBER.AND WE DUG IT BY HAND.HHHHHHMMMMMMMMMMMM.
2.5 FOUNDATIONS..
August 2010
GETTING BUSY...
BEFORE
August 2010
OVERSITE AND BINDING 4 DPM.
August 2010
CELATEX IN OVERSITE..WITH BOUNDARY..
August 2010
CONCRETING OVERSITE..
AFTER
August 2010
CONCRETE OVERSITE...
September 2010
Kitchen extension, brick work, block work, ground work.
PATIO AND PATHWAY.
September 2010
SCREEDED FLOOR WITH UNDERFLOOR HEATING IN IT.
September 2010
Kitchen extension, brick work, block work, ground work.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?