Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
B Dunkley Carpentry & Building
77
photos of recent work
My Profile
My Feedback (31)
My Photos (77)
AFTER
December 2011
Single storey rear extension
finished extension ready for kitchen decorating
AFTER
June 2011
Loft Conversions
finished dormer roof
AFTER
June 2011
Loft Conversions
new stairwell landing
AFTER
June 2011
Loft Conversions
ensuiteshower
AFTER
December 2011
Extension and refurbishment kitchen, bathroom refit.
finished extention
AFTER
December 2011
Extension and refurbishment kitchen, bathroom refit.
side extension shown from the rear
AFTER
December 2011
Extension and refurbishment kitchen, bathroom refit.
custom built bathroom cabinets
AFTER
December 2011
Extension and refurbishment kitchen, bathroom refit.
finished extention with fitted kitchen
AFTER
December 2011
Extension and refurbishment kitchen, bathroom refit.
finished extention with fitted kitchen
AFTER
February 2011
conservatory.
conservatory and patio
AFTER
February 2011
landscaping, fences, summerhouse, astroturf.
patio, summerhouse, astroturf, fencing
AFTER
August 2009
Rebuild garage barn
double open garage, single enclosed garage, and games room.
DURING
February 2013
Kitchen fitted and building work.
wall knocked down doorway from dining room opened up
DURING
February 2013
Kitchen fitted and building work.
Wall knocked down room stripped out
AFTER
February 2013
Strip out, plaster and fit new kitchen, knock out arches, fit bi folding doors.
fitted kitchenplaster work
AFTER
February 2013
Strip out, plaster and fit new kitchen, knock out arches, fit bi folding doors.
fitted kitchen plaster work
DURING
February 2013
Strip out, plaster and fit new kitchen, knock out arches, fit bi folding doors.
kitchen stripped out
DURING
February 2013
Strip out, plaster and fit new kitchen, knock out arches, fit bi folding doors.
room srtipped out
AFTER
February 2013
Loft conversion.
main bedroom
AFTER
February 2013
Loft conversion.
small bedroom, and landing
AFTER
February 2013
Loft conversion.
landing with cupboard storage
AFTER
February 2013
Loft conversion.
main bedroom
DURING
February 2013
Loft conversion.
timber structure in place
DURING
February 2013
Loft conversion.
Crane lifting in steel work
BEFORE
February 2013
Loft conversion.
Truss roof loft space
AFTER
November 2012
Utility room conversion including new outside wall, double glazed window and door, plastering, boxin
New back door, window, brickwork and cladding
AFTER
November 2012
Utility room conversion including new outside wall, double glazed window and door, plastering, boxin
AFTER
November 2012
Utility room conversion including new outside wall, double glazed window and door, plastering, boxin
finished job
DURING
May 2012
Reroofing and fitting out a large barn
AFTER
July 2012
One storey rear extension to include kitchen diner and playroom.
all finished looking into extension from the old house.
DURING
July 2012
One storey rear extension to include kitchen diner and playroom.
old wall and window removed, ready for plumbing and electrics
DURING
July 2012
One storey rear extension to include kitchen diner and playroom.
roof almost complete
DURING
July 2012
One storey rear extension to include kitchen diner and playroom.
brickwork up to damp
BEFORE
July 2012
One storey rear extension to include kitchen diner and playroom.
conservatory removed, ready to dig footings
AFTER
October 2012
Take down dividing wall between kitchen and dining room, relocate electrics and take out radiator, f
AFTER
October 2012
Take down dividing wall between kitchen and dining room, relocate electrics and take out radiator, f
DURING
May 2012
Reroofing and fitting out a large barn
New gable end above door, tiles 34 finished
AFTER
September 2012
Clean off old painting and under cloak on gable end of roof. Fit new and refit ridge tiles.
strip off old cloaking ang pointing, and fit new
AFTER
February 2011
driveway and front wall with gates.
AFTER
February 2011
fences, astroturf, patio, conservatory
BEFORE
December 2011
Single storey rear extension
footings groundwork
BEFORE
December 2011
Extension and refurbishment kitchen, bathroom refit.
original bathroom
BEFORE
December 2011
Extension and refurbishment kitchen, bathroom refit.
entrance hall cupboard
BEFORE
December 2011
Extension and refurbishment kitchen, bathroom refit.
footings groundwork
July 2009
kitchen
refurb and kitchen fit
November 2011
solid oak floor
DURING
December 2011
Single storey rear extension
trifold oak doors into extension, fully plastered
DURING
December 2011
Single storey rear extension
roof on, doors and windows in.
BEFORE
December 2011
Single storey rear extension
groundwork footings
AFTER
June 2011
Loft Conversions
finished room showing alcove with velux
AFTER
December 2011
Extension and refurbishment kitchen, bathroom refit.
new bathroom
AFTER
February 2011
Bungalow extension and refurbish. Landscaping, driveway and conservatory and kitchen refit
driveway
AFTER
November 2011
Rebuil garage barn
finished job
DURING
February 2011
Bungalow extension and refurbish. Landscaping, driveway and conservatory and kitchen refit
extensionrefurbishment
DURING
July 2009
Rebuild garage barn
new structure ready for cladding, and tiling
DURING
July 2009
Rebuild garage barn
AFTER
June 2011
Loft Conversions
finished loft room showing ensuite walkin wardrobe
DURING
June 2011
Loft Conversions
steel work, floor joists supporting walls
AFTER
February 2011
Bungalow extension and refurbish. Landscaping, driveway and conservatory and kitchen refit
extensionrefurbishment conservatory
AFTER
December 2011
Extension and refurbishment kitchen, bathroom refit.
AFTER
July 2011
New patio, front door, velux window.
new patio
AFTER
July 2011
New patio, front door, velux window.
new patio
AFTER
July 2011
New patio, front door, velux window.
new patio
BEFORE
July 2011
New patio, front door, velux window.
new patio
June 2008
dormer roof conversion
dormer roof conversion
June 2008
dormer roof conversion
dormer roof conversion
October 2008
staircase
staircase fitted to new house
July 2009
kitchen refit
AFTER
March 2011
Maintenance Work re fitted kitchen
kitchen refit
AFTER
March 2011
Maintenance Work re fitted kitchen
kitchen refit
BEFORE
February 2011
Bungalow extension and refurbish. Landscaping, driveway and conservatory and kitchen refit
extensionrefurbishment
DURING
February 2011
Bungalow extension and refurbish. Landscaping, driveway and conservatory and kitchen refit
extension footings
AFTER
March 2011
landscaping
astro turf, patio, summer house, fencing
AFTER
February 2011
Bungalow extension and refurbish. Landscaping, driveway and conservatory and kitchen refit
extension
BEFORE
June 2011
Loft Conversions
before dormer
DURING
July 2009
Rebuil garege barn
stripping roof off
BEFORE
July 2009
Rebuild garage barn
old building before demolition
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?