Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Brooks Plumbing & Home Improvements
189
work photos
My Profile
Page
My Customer
Feedback
My Photos
February 2011
Contemporary en suite
February 2011
Contemporary en suite
February 2011
Contemporary en suite
February 2011
Contemporary en suite
Floor tiles used as skirting board
December 2010
Creating a contemporary en suite
Wall mounted basin unit
December 2010
Creating a contemporary en suite
Window sill matches shower cubicle wall covering
December 2010
Creating a contemporary en suite
Verticle mosaic glass tiles
December 2010
Creating a contemporary en suite
Multi Panel shower walls An alternative to tiles and grout.
September 2011
Refurbishment of main bathroom
Free standing bath with champagne shelf attached
September 2011
Refurbishment of main bathroom
P shaped shower cubicle with mosaic plinth front.
September 2011
Refurbishment of main bathroom
Mosaics for curved wall behind heated towel rail
September 2011
Refurbishment of main bathroom
Natural stone Travetine wash hand basin
April 2012
Bathstore and Bauhaus Bathroom
April 2012
Bathstore and Bauhaus Bathroom
April 2012
Bathstore and Bauhaus Bathroom
April 2012
Bathstore and Bauhaus Bathroom
April 2012
Refurbishment of downstairs clockroom
Creating a traditional cloakroom
April 2012
Refurbishment of downstairs clockroom
April 2012
Refurbishment of downstairs clockroom
Victorian style border tile
April 2012
Refurbishment of downstairs clockroom
Floor tiles, rather than wall tiles, covering WC boxing in
February 2012
Refurbishment of downstairs cloak room
February 2012
Refurbishment of downstairs cloak room
March 2012
Refurb of downstairs cloakroom WC
March 2012
Refurb of downstairs cloakroom WC
BEFORE
December 2011
Refurbishment of en suite shower room
December 2011
Refurbishment of en suite shower room
En suite in 350 year old character cottage with slightly wonkey walls
December 2011
Refurbishment of en suite shower room
Electric shower unit retained
December 2011
Refurbishment of en suite shower room
Bi fold door and 800 mm low profile square shower tray
December 2011
Refurbishment of en suite shower room
January 2012
Replacing bifold and quadrant shower doors in 2 upstairs bathrooms
January 2012
Replacing bifold and quadrant shower doors in 2 upstairs bathrooms
January 2012
Replacing bifold and quadrant shower doors in 2 upstairs bathrooms
January 2012
Refurbishment of en suite shower room.
Black and white marble effect shower wall in shower cubicle An alternative to tiles and grout.
January 2012
Refurbishment of en suite shower room.
Integrated rainwater shower
January 2012
Refurbishment of en suite shower room.
January 2012
Refurbishment of en suite shower room.
December 2011
Refurbish family bathroom White style
December 2011
Refurbish family bathroom White style
Wall hung large wash hand basin
December 2011
Refurbish family bathroom White style
Large format porcelain tiles on the walls, floor and bath side
December 2011
Refurbish family bathroom White style
Large mirrors inlayed into tiles
November 2011
Refurbish bathroom in 2nd floor flat
Electric heated towel rail
November 2011
Refurbish bathroom in 2nd floor flat
Installed new electric shower
November 2011
Refurbish bathroom in 2nd floor flat
Contemporary square basin and vanity unit
November 2011
Refurbish bathroom in 2nd floor flat
Modern tile border supplied by Tops Tiles in Horsham
October 2011
Refurbishment of main bathroom
Large wall hung wash hand basin
October 2011
Refurbishment of main bathroom
Wall hung WC and Gulf stone tiles
October 2011
Refurbishment of main bathroom
Free standing bath
October 2011
Refurbishment of main bathroom
Free standing bath tap Now thats what I call a tap
October 2011
Refurbishment of main bathroom
New shower cubicle
November 2011
Cloakroom tiling, floor and walls, fitment sanitary ware and basin
November 2011
Cloakroom tiling, floor and walls, fitment sanitary ware and basin
Porcelaine floor and wall tiles
November 2011
Cloakroom tiling, floor and walls, fitment sanitary ware and basin
September 2011
Small en suite refurbisment
September 2011
Small en suite refurbisment
Flat white metal contemporary tile trim
September 2011
Small en suite refurbisment
September 2011
Small en suite refurbisment
BEFORE
July 2011
Refurbish of down stairs cloakroom.
July 2011
Refurbish of down stairs cloakroom.
Accesorised by the customer, not me
July 2011
Refurbish of down stairs cloakroom.
Wall hung basin and WC
July 2011
Refurbish of down stairs cloakroom.
12 mm thick semi polished Italian Porcelain tiles Wall and floor
February 2011
Refurbish family bathroom Black and white style
February 2011
Refurbish family bathroom Black and white style
February 2011
Refurbish family bathroom Black and white style
Designer Triton electric shower
February 2011
Refurbish family bathroom Black and white style
April 2011
Refurbishment of downstairs cloakroom.
Cloakroom basin with half pedestal and 6 splash back tiles
April 2011
Refurbishment of downstairs cloakroom.
Back to wall WC with extra wide white cabinet
July 2011
Family bathroom complete refurbish.
Some say the little fella in the corner never bathes
July 2011
Family bathroom complete refurbishment.
Finished bathroom dressed and accessorised (by the customer!).
July 2011
Refurbish shower cubicle in en suite bathroom.
Re tile from white to black marble effect
July 2011
Refurbish shower cubicle in en suite bathroom.
New low profile shower tray fitted on the floor
July 2011
Refurbish shower cubicle in en suite bathroom.
New Aqualisa Aquastream power shower fitted
May 2011
Refurbishment of shower cubicle
New shower and replacement natural stone mosaic tiles
March 2011
Refurbishment of downstairs cloakroom.
March 2011
Refurbishment of downstairs cloakroom.
March 2011
Refurbishment of downstairs cloakroom.
February 2009
Complete refurbishment of bathroom in first floor flat.
BEFORE
May 2011
En suite refurbishment
Remove bath and replace with showering area
AFTER
May 2011
En suite refurbishment
Remove bath and replace with showering area
BEFORE
May 2011
En suite refurbishment
Remove bath and replace with showering area
AFTER
May 2011
En suite refurbishment
DURING
May 2011
En suite refurbishment
Building the stud wall dividing the showering area from the storage area
DURING
May 2011
En suite refurbishment
Tiling awaiting grout
BEFORE
October 2009
Bathroom refurbishment in Worthing
AFTER
October 2009
Bathroom refurbishment in Worthing
April 2011
Refurbishment of bathroom
Over the bath mixer shower
April 2011
Refurbishment of bathroom
Lower than usual by 10 cms bath to help with getting in and out
April 2011
Refurbishment of bathroom
Half tiled bathroom
April 2011
Refurbishment of bathroom
Fitted furniture in gloss white finish
October 2010
Complete new bathroom
3 sectioned bath panel with opening doors for storage
October 2010
Complete new bathroom
October 2010
Complete new bathroom
October 2010
Complete new bathroom
Power shower installation
November 2010
En suite refurbishment
Sealed natural stone window shelf
November 2010
En suite refurbishment
Bi fold shower door installed
November 2010
En suite refurbishment
Floor area tiled and grouted
June 2009
Blue ceramic tiles replaced original border tiling
BEFORE
August 2010
Total refurbishment of ground floor shower room
AFTER
August 2010
Total refurbishment of ground floor shower room
Polished porcelin tiles on wall and floor and a mosic tiled arch way
August 2010
Total refurbishment of ground floor shower room
August 2010
Total refurbishment of ground floor shower room
Mosaic tiled arch way
BEFORE
December 2010
Refurbishment of downstairs family bathroom
DURING
December 2010
Refurbishment of downstairs family bathroom
Corner walls striped back prior to rebuild
AFTER
December 2010
Refurbishment of downstairs family bathroom
December 2010
Refurbishment of downstairs family bathroom
December 2010
Refurbishment of downstairs family bathroom
September 2009
Complete refit of ensuite shower room in Horsham
December 2008
Refurbishment of family bathroom
May 2009
Refit of ensuite bathroom
BEFORE
December 2008
Complete refit of family bathroom.
AFTER
December 2008
Complete refit of family bathroom.
October 2008
Retile of shower room and installing new shower and sink
Showing Travetine natural stone tiles
October 2008
Retile of shower room and installing new shower and sink
Showing Travetine natural stone tiles
May 2009
Finished ensuite
May 2009
Replacement shower cubicle with sliding double doors
May 2009
Family bathroom upgrade in Lower Beeding
May 2009
Family bathroom upgrade in Lower Beeding
June 2009
Shower installation using blue mosaic tiles
BEFORE
April 2009
Remove bath, retile and install shower tray and cubicle.
AFTER
April 2009
Remove bath, retile and install shower tray and cubicle.
October 2008
Tiling of customers kitchen in Emsworth, Hampshire
DURING
May 2009
Repair and painting of sofits,facias and weatherboards and repair of gutters
BEFORE
October 2008
New van before signing
AFTER
October 2008
New van after signing
BEFORE
January 2009
Just before the birth of son Benjamin in Jan 09
AFTER
March 2009
After birth of son Benjamin in Jan 09
May 2009
Installation of shower pump
May 2009
Fitting of shower cubicle screen and door
May 2009
Some complex pipe work to deal with
May 2009
Freshly painted wardrobe doors
January 2009
Prime, undercoat and gloss coat of 4 built in wardrobes, decorating 2 bedrooms
May 2009
Shower removed and replaced with bath and electric shower unit
June 2009
Replacing 3 way mid position valve
May 2009
Shower screen mounted and tiles added above border to create a showering area
BEFORE
June 2009
Re tile shower cubicle, replace electric shower with power shower.
AFTER
June 2009
Re tile shower cubicle, replace electric shower with power shower.
June 2009
Replacing Broken Tiles, ReSealing of Bath and Fitting Wooden Bath Panel.
October 2009
Black floor tiles with grey grout
August 2009
Bathstores My Time close coupled cistern and pan
September 2009
Complete refit of ensuite shower room in Horsham
BEFORE
July 2009
Ensuite referb in Worthing
AFTER
August 2009
Ensuit referb in Worthing
July 2009
Replace shower, wc, wash hand basin and flooring in ensuite bathroom.
July 2009
Replace shower, wc, wash hand basin and flooring in ensuite bathroom.
March 2011
Bathroom refit
Marble border with electric shower
March 2011
Bathroom refit
July 2009
Fit shower pump, 2 new shower valves, bath and shower screen and retile family bathroom
July 2009
Fit shower pump, 2 new shower valves, bath and shower screen and retile family bathroom
July 2009
Fit shower valve and riser in existing bathroom and add shower screen
BEFORE
November 2009
Replace bidet with quadrant shower cubicle in guests bathroom.
AFTER
November 2009
Replace bidet with quadrant shower cubicle in guests bathroom.
BEFORE
July 2009
Refurbishment of downstairs cloakroom
AFTER
July 2009
Refurbishment of downstairs cloakroom
December 2009
Refurbishment of downstairs cloakroom
December 2009
Refurbishment of downstairs cloakroom
BEFORE
November 2009
Add aditional tiling, install shower unit and screen in ensuite bathroom
AFTER
November 2009
Add aditional tiling, install shower unit and screen in ensuite bathroom
November 2009
Add aditional tiling, install shower unit and screen in ensuite bathroom
BEFORE
December 2009
Install replacement bathroom suite in family bathroom
AFTER
December 2009
Install replacement bathroom suite in family bathroom
Bath, WC and basin removed prior to works and then reinstalled
December 2009
Install replacement bathroom suite in family bathroom
Travetene natural stone mosaic border incorporated in large wall tiles
December 2009
Install replacement bathroom suite in family bathroom
Limestone grout used to blend with tile selection
BEFORE
January 2010
Refit of bathroom in first floor flat in Horsham
AFTER
January 2010
Refit of bathroom in first floor flat in Horsham
January 2010
Refit of bathroom in first floor flat in Horsham Basin vanity unit detail
March 2010
Complete refurbishment of ensuite bathroom
March 2010
Complete refurbishment of ensuite bathroom
March 2010
Complete refurbishment of ensuite bathroom
March 2010
Refurbishment of family bathroom
March 2010
Refurbishment of family bathroom
March 2010
Refurbishment of family bathroom
May 2010
Complete bathroom refit
Compact bathroom refit
May 2010
Complete bathroom refit
Integral Aqualisa power shower
May 2010
Complete bathroom refit
DURING
March 2010
Remove radiator and install new radiator on opposite wall.
New radiator in position Work In Progress
DURING
March 2010
Remove radiator and install new radiator on opposite wall.
Radiator in new position
January 2010
Replace existing shower valve
Work In Progress
January 2010
Replace existing shower valve
The finished new shower unit
August 2010
Refurbishment of Family Bathroom
August 2010
Refurbishment of Family Bathroom
August 2010
Refurbishment of Family Bathroom
September 2010
Refurbishment of family and ensuite bathrooms
September 2010
Refurbishment of family and ensuite bathrooms
September 2010
Refurbishment of family and ensuite bathrooms
BEFORE
April 2010
Refurbishment of downstairs family cloakroom
Including sub floor repairs
AFTER
April 2010
Family cloakroom with white polished engineered pocelain tiles
Features Grohe auto sensing basin tap
November 2010
Refurbishment of en suite bathroom.
Champagne bath ware retained
November 2010
Refurbishment of en suite bathroom.
Champagne WC and cistern retained
DURING
November 2010
Refurbishment of en suite bathroom.
Re building shower cubicle walls prior to tiling.
November 2010
Refurbishment of en suite bathroom.
New shower valve and riser rail
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?