Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
C & J Home Improvements
58
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
December 2011
New Kitchen, ceilings, flooring, windows, Granite worktops etc
Old Kitchen
AFTER
December 2011
New Kitchen, ceilings, flooring, windows, Granite worktops etc
Finished item, existing appliance and new Granite worktop
BEFORE
December 2011
New Kitchen, ceilings, flooring, windows, Granite worktops etc
Old kitchen
AFTER
December 2011
New Kitchen, ceilings, flooring, windows, Granite worktops etc
Finished item with Granite worktop and undercounter sink
BEFORE
December 2011
New Kitchen, ceilings, flooring, windows, Granite worktops etc
Old area for fridge freezer
AFTER
December 2011
New Kitchen, ceilings, flooring, windows, Granite worktops etc
New home inc pull out larder, over head cupboard and plenty wine storage
AFTER
August 2011
Bathroom and ensuite fitted and associated building work
New ensuite wet room with under floor heating
AFTER
August 2011
Bathroom and ensuite fitted and associated building work
Shower with drencher head in ensuite wet room
AFTER
August 2011
Bathroom and ensuite fitted and associated building work
Wall hung unit and basin in new ensuite wet room
BEFORE
March 2011
Downstairs cloakroom refurbishment.
Old cloakroom
DURING
March 2011
Downstairs cloakroom refurbishment.
Existing crazy pipework
AFTER
March 2011
Downstairs cloakroom refurbishment.
Finished item
AFTER
February 2012
Bedroom, plastered, decorated and fitted wardrobe built
Inside newly built wardrobe
AFTER
February 2012
Bedroom, plastered, decorated and fitted wardrobe built
Double door wardrobe
AFTER
October 2011
EnSuite refit Toilet, Vanity Unit, Basin, Shower, screen and tray etc
Didnt get a before picture but this is new toilet and towel radiator
AFTER
October 2011
EnSuite refit Toilet, Vanity Unit, Basin, Shower, screen and tray etc
New Vanity Unit, Basin and Towel rail
AFTER
October 2011
EnSuite refit Toilet, Vanity Unit, Basin, Shower, screen and tray etc
New bifold screen, shower and 1000x1000 shower tray inc tiling
BEFORE
September 2011
Bathroom refit
End of 1st day, ready to refit
DURING
September 2011
Bathroom refit
Walls and flooring tiled, vanity units in place
DURING
October 2010
1st Day of kitchen refit
Kitchen refit inc replastering and painting
DURING
October 2010
During refit of kitchen
Kitchen refit inc replastering and painting
AFTER
October 2010
Kitchen installed ready for flooring and 2nd fix electrics
Kitchen refit inc replastering and painting
DURING
May 2009
Removal of old kitchen
AFTER
May 2009
Kitchen flooring in ready for tiling
Plastered, painted, kitchen and flooring fitted
BEFORE
November 2009
Hallway door replacement and decoration
Hallway decoration and 4 doors replaced
AFTER
November 2009
Hallway door replacement and decoration
Hallway door replacement and decoration
DURING
February 2010
Kitchen refit with Porcelain floor tiles
Fitted kitchen with laminate upstand. Porcelain floor tiles
AFTER
February 2010
Kitchen refit with Porcelain floor tiles
Fitted kitchen with laminate upstand. Porcelain floor tiles
AFTER
February 2010
Kitchen re fit and floor tiled.
Fitted kitchen with laminate upstand. Porcelain floor tiles
BEFORE
March 2009
Kitchen Replacement Before
Replaced kitchen, flooring in kitchen and lounge and decorated kitchen area.
AFTER
March 2009
Kitchen Replacement
Kitchen, flooring and tiles completed
BEFORE
September 2009
Remove install door to garage. Entrance door not up and over.
Replaced garage side entrance door
AFTER
September 2009
Remove install door to garage. Entrance door not up and over.
The finished product, replacement door
AFTER
June 2008
Bathroom Refurbishment
3rd Picture
AFTER
June 2008
Bathroom Refurbishment
Total refurbishment including instalment of the bathroom suite, plumbing, tiling and laminate flooring
AFTER
June 2008
Kitchen Refit
Refitted kitchen including plumbing, tiling and flooring
BEFORE
November 2009
External Refurbishment
Replaced soffits, facias and guttering and painted outside of house
AFTER
November 2009
External Refurbishment
Replaced soffits, facias and guttering and painted outside of house
BEFORE
November 2009
External refurbishment
Replaced soffits, facias and guttering and painted outside of house
AFTER
November 2009
External Refurbishment
Replaced soffits, facias and guttering and painted outside of house
BEFORE
November 2009
Painted rendering
Painted rendering following cavity wall insulation work
AFTER
November 2009
Painted rendering
Painted rendering following cavity wall insulation work
AFTER
February 2010
Travertine Floor tiles
Floor tiles laid in bolier room, hallway and downstairs bathroom
AFTER
February 2010
Travertine Floor Tiles
Floor tiles laid in bolier room, hallway and downstairs bathroom
AFTER
February 2010
Travertine Floor Tiles
Floor tiles laid in bolier room, hallway and downstairs bathroom
AFTER
January 2010
Kitchen re fit and under floor heating and tiles.
Finished product including kitchen decoration and tiling
AFTER
January 2010
Kitchen re fit and under floor heating and tiles.
Finished product Travertine Floor Tiles with under floor heating
AFTER
January 2010
Kitchen re fit and under floor heating and tiles.
Finished product including kitchen decoration and tiling
AFTER
January 2010
Kitchen re fit and under floor heating and tiles.
Finished product including kitchen decoration and tiling
AFTER
August 2008
Kitchen Refit
Refitted kitchen including plumbing and tiling
BEFORE
March 2009
Kitchen Replacement During
All the existing plasterboard needed to be replaced and levelled before we could install the units and to ensure a sound surface to tile.
AFTER
March 2009
Kitchen Replacement
Install a larder pull out and Magic corner unit.
BEFORE
February 2010
Laminate flooring with underfloor heating
Removal of old Marley floor tiles prior to fitting insulation boards
AFTER
February 2010
Laminate flooring with underfloor heating
Finished product including hallway and landing decoration
AFTER
February 2010
Kitchen refit with laminate flooring and under floor heating
Finished product including kitchen decoration and tiling
AFTER
February 2010
Kitchen refit with laminate flooring and under floor heating
Finished product including kitchen decoration and tiling
October 2008
Bedroom Makeover
Installed fitted wardrobes including TV installation
October 2008
Bedroom Makeover
Installed fitted wardrobes and laminate flooring
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?