Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Camelot Contracts
15
photos of recent work
My Profile
My Feedback (28)
My Photos (15)
BEFORE
February 2012
Refurbish shower room
DURING
February 2012
Refurbish shower room
DURING
February 2012
Refurbish shower room
Small shelf for shower gel
AFTER
February 2012
Refurbish shower room
Use existing w.c. basin, fit new shower tile walls floor with travertine
BEFORE
February 2012
Replace bathroom suite
DURING
February 2012
Replace bathroom suite
Old suite removed part of the floor up
DURING
February 2012
Replace bathroom suite
The bath, tiles, shower valve towel warmer have been fitted, the w.c. is next
AFTER
February 2012
Replace bathroom suite
The finished room, all we need is a blind.
DURING
February 2012
Refit bathroom.
Bathroom suite removed
DURING
February 2012
Refit bathroom.
New stud wall inbetween the door my hopup
AFTER
February 2012
Refit bathroom.
As previous
AFTER
February 2012
Refit bathroom.
Remove partition wall between the seperated WC bathroom, build stud wall to block off old WC door, fit new bathroom suite, wall floor tiles, lighting and pump for shower
AFTER
November 2011
Supply and Fit new consumer unit and required rcbos
Finished kitchen, sorry about picture quality
AFTER
November 2011
Supply and Fit new consumer unit and required rcbos
New bedroom furniture, fit new wall lights
AFTER
February 2012
Built in wardrobes
Using an alcove in the bedroom the space that used to be the airing cupboard I built this double wardrobe
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?