Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Contrast Construction
32
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
September 2009
Loft Conversion
Premises Before Loft Conversion Various Works
AFTER
September 2009
Loft Conversion
During Works
BEFORE
September 2009
Loft Conversion Various Works
Premises Before Works
September 2009
Loft Conversion
Extend Formation of Gable End
BEFORE
September 2009
New Kitchen Refurbishment
Replaster kitchen complete and instal new kitchen
AFTER
September 2009
New Kitchen Refurbishment
KItchen Units,Oak Worktops,Appliances,Electrics,Replastering,UPVC Windows
AFTER
September 2009
New Kitchen Refurbishment
Installed Kitchen complete with Built In Wine fridge
AFTER
September 2009
New Kitchen Refurbishment
Kitchen Units,Electrics,Plumbing,Plastering,Decoration
BEFORE
July 2008
Side, Rear Upper Lower Extensions Various Works
Premises before Rear Upper Lower Extensions Added
July 2008
Side, Rear Upper Lower Extensions Added
Premises before Rear Upper Lower Extensions Added
October 2007
Side Rear Extension
Extensive Internal Works, Including Retaining Wall
AFTER
July 2008
Side, Rear Upper Lower Extensions Added Various Works
Premises before Rear Upper Lower Extensions Added
AFTER
October 2007
Side Rear Extension
Two Storey Side, Rear extension and Alterations
April 2008
Hardwood Floor Installation
Installation of Random Length Hardwood T G Flooring
June 2010
Removal of chimney breast and structural work
Removal of breast and insertion of steelwork to support
June 2010
Complete removal and refit of bathroom
Formed false wall to coseal toilet cistern and Pipework to sink bath
June 2010
Complete removal and refit of bathroom
Terrazzo Wall Floor Tiles from floor to ceiling
BEFORE
June 2010
Extension built on front of house and internal room renovation.
Extended Front of Premises, Converted Garage to Study and rear of garage to Utility Room and internal Alterations
AFTER
June 2010
Extension built on front of house and internal room renovation.
Extended Front of Premises, Converted Garage to Study and rear of garage to Utility Room and internal Alterations
BEFORE
June 2010
Garage Conversion Internal Works
Extended Front of Premises, Converted Garage to Study and rear of garage to Utility Room and internal Alterations
AFTER
June 2010
Garage Conversion Internal Works
Extended Front of Premises, Converted Garage to Study and rear of garage to Utility Room and internal Alterations
AFTER
June 2010
Garage Conversion Internal Works
Extended Front of Premises, Converted Garage to Study and rear of garage to Utility Room and internal Alterations
May 2010
New Bathroom Refit
Plumbed in Jaccuzzi bath, Concealed taps and toilet cistern, Heated Tiled Floor
AFTER
May 2010
Plastered walls,ceiling and tiled floor and walls and Plumbing
AFTER
March 2010
3 Windows cut out of 2 rooms. Previously built rooms in our roof.
New Windows in Lounge
May 2009
Garage conversion and other minor building work.
Interior to Garage with Side Entrance Door to Garden
AFTER
May 2009
Garage conversion and other minor building work.
New Room Interior with New Doorway from Cupboard in Hall
May 2009
Garage conversion and other minor building work.
Garage Door Removal Window Replacement
BEFORE
February 2009
House extension.
Side Elevation
BEFORE
February 2009
House extension.
Side Elevation Extension Full Depth of House Single Storey
February 2009
House extension.
Stepped Side Lounge Extension Garage Store to Front of Premises
October 2008
Extension Of Existing Loft Conversion and Gf Extension
Extension Of Existing Loft Conversion and Gf Extension
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?