Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
D G Fires & Fireplaces
79
work photos
My Profile
Page
My Customer
Feedback
My Photos
August 2010
Agean limestone surround
Agean lime stone surround with granite hearth,half polish arch cast insert with inset gas fire
BEFORE
December 2009
prep under way for h i w gas fire
AFTER
October 2009
Install two cast iron inserts and wood surround.
new tiled insert with tiled hearth and wood surround
AFTER
March 2009
hole in the wall gas fire
gazco ebox balanced flue HIW gas fire fitted in false chimney breast and plastered by others
AFTER
October 2009
New fireback fitted
remove old fireback and plaster around fire opening and install new 16 fireback and otty hood
AFTER
December 2009
new marble surround
marble fireplace with new gas fire
AFTER
May 2009
new marble surround
carrea marble fire surround with granite hearth cast iron plate and gas fire
AFTER
September 2009
fireplace
Limestone fireplace fitted with electric fire
AFTER
October 2009
fireplace with inset living flame effect gas fire
Tiled insert with granite hearth and wooden mantle complete with gas fire
AFTER
December 2009
Hole in the wall fire fitted into existing fireplace
AFTER
December 2009
Hole in the wall fire fitted into existing fireplace
wall area plastered and the new gas studio 2 gas fire fitted
BEFORE
December 2009
Hole in the wall fire fitted into existing fireplace
Preparation under way to form new opening ready to accept new hole in the wall Gazco 2 studio gas fire
AFTER
June 2011
Supply and install new roof flue, install new fireplace and gas fire.
New 5 inch twin walled gas flue installed complete with lead slate storm collar and cowl
AFTER
June 2011
Supply and install new roof flue, install new fireplace and gas fire.
New limestone fireplace fitted with inset living flame gas fire
AFTER
May 2011
Fireplace removed, walls tidied and replastered
Fireback and back boiler removed, wall area plastered and fire opening rendered,floor area screeded
BEFORE
May 2011
Fireplace removed, walls tidied and replastered
Old fireback and back boiler still in posistion with plaster around missing
AFTER
June 2011
Removal of old gas fire and fireplace and new gas fire fitted into wall.
Plastering all done and new gazco riva 67 installed
DURING
June 2011
Removal of old gas fire and fireplace and new gas fire fitted into wall.
Plastering underway and fire box placed in fire opening
DURING
June 2011
Removal of old gas fire and fireplace and new gas fire fitted into wall.
Alterations to fire opening complete and now ready for plastering
DURING
June 2011
Removal of old gas fire and fireplace and new gas fire fitted into wall.
New concrete lintel being installed
DURING
June 2011
Removal of old gas fire and fireplace and new gas fire fitted into wall.
surround and gas fire removed and alteration to fire opening to begin
DURING
June 2011
woodburning flue installed
Veiw of top of chimney with clamp and plate installed to support the weight of the liner within the chimney
DURING
June 2011
Multi fuel flue liner
View of chimney with chimney pot removed and 6 inch multi fuel liner installed with void around liner filled with leaker insulation
AFTER
August 2011
Installed woodburner
Fireplace removed and refitted with the back panel made suitable for use with woodburner and the hearth depth increased and tiled
AFTER
August 2011
Removal of old fire place and installation of multifuel stove.
Slate hearth supplied and fitted,Chimney relined, and multifuel wood burner installed
DURING
August 2011
Removal of old fire place and installation of multifuel stove.
Preparation for plastering of wall and rendering of fire opening
DURING
August 2011
Removal of old fire place and installation of multifuel stove.
fire opening being cleared of fireback and rubble
DURING
February 2011
fireback
fireback in the process of being installed
AFTER
September 2010
Old fire surround
Customer old fire surround brought back to life with new granite backpanel and hearth and new glass fronted gas fire
AFTER
February 2010
Gazco studio 1 glass fronted with logs
BEFORE
March 2011
Old roof flue before repacement fitted
Tiles have been removed to gain entry into roof space to enable the removal of the old gas flue.
AFTER
March 2011
solid fuel roof flue
roof flue complete and terminating at the correct height and weathered in with a lead slate and storm coller
DURING
February 2011
solid fuel roof flue
old roof flue has been removed and uderway is the installation of a new insulated twin walled solid feul flue
BEFORE
February 2011
Hearth fixed to floor and concrete blocks laid in fire opening to close to correct size to suit cast
AFTER
February 2011
marble fire surround with granite hearth and cast arch insert
AFTER
September 2010
Completed structural work and fitted new fire into lounge
finished with wall switch installed on return of chimney breast and wall area plastered and left ready for decoration.
DURING
September 2010
Completed structural work and fitted new fire into lounge
New lintel installed and bottom of fire opening raised up to correct height to sizes of appliance
BEFORE
September 2010
Completed structural work and fitted new fire into lounge
fireback fitted in fire opening
AFTER
September 2010
Completed structural work and fitted new fire into lounge
Finished and testing fire
DURING
September 2010
Completed structural work and fitted new fire into lounge
opening being prepared ready to install new concrete lintel
AFTER
September 2010
Completed structural work and fitted new fire into lounge
Wall area plastered and new gazco studio 1 glass fronted fire fitted
AFTER
September 2010
Completed structural work and fitted new fire into lounge
wall switch installed for gas fire
DURING
September 2010
Completed structural work and fitted new fire into lounge
Ladder and crawler ladder set up to reline chimney with gas flue
DURING
September 2010
Completed structural work and fitted new fire into lounge
Firebrick removed and lintel exposed
AFTER
April 2009
Remove old stone fireplace and install non fireplace with gas fire.
DURING
July 2010
Install wood burning stove.
ladder set up and roof tiles removed ready for the installation of flue system
DURING
July 2010
Install wood burning stove.
solid fuel flue system installed where chimney had been removed below roof level
AFTER
July 2010
Install wood burning stove.
Hearth and back hearth installed chimney relined and wood burner installed
BEFORE
July 2010
Install wood burning stove.
DURING
February 2011
Gather adaptor install for solid fuel fire onto flexi chimney liner
DURING
February 2011
Gather adaptor being installed to solid fuel liner
AFTER
August 2009
fireplace with HE gas fire
AFTER
October 2010
Installed a wood burning stove and flu
Chimney relined, hearth cemented into posistion and wood burner installed
DURING
October 2010
Installed a wood burning stove and flu
Wall plastered and wood burner stood in opening
DURING
October 2010
Installed a wood burning stove and flu
Opening rendered and wall 1st coat plastered
DURING
October 2010
Installed a wood burning stove and flu
Old fireplace removed and angle beads applied ready for plastering and rendering of fire opening
BEFORE
October 2010
Installed a wood burning stove and flu
Customers fireplace before work started
AFTER
February 2011
Remove tiled fireplace, plaster wall area, install new fireplace and gas fire.
New limestone fireplace complete with gas fire with plastering on each side of wll around fireplace
BEFORE
February 2011
Remove tiled fireplace, plaster wall area, install new fireplace and gas fire.
Customer old fireplace before work started
AFTER
October 2010
Install gas fire and prefabricated flue. Construct new fake chimney breast and fireplace.
plastering done and marble hearth and backpanel installed with gas fire
DURING
October 2010
Install gas fire and prefabricated flue. Construct new fake chimney breast and fireplace.
Plaster boarding finished and angle beads applied to corners.
DURING
October 2010
Install gas fire and prefabricated flue. Construct new fake chimney breast and fireplace.
Fireline plasterboard being fixed to metal stud work ready for plastering
DURING
October 2010
Install gas fire and prefabricated flue. Construct new fake chimney breast and fireplace.
Class 2 collection box and twin walled flue system installed with metal stud frame work to form chimney breast
DURING
October 2010
Install gas fire and prefabricated flue. Construct new fake chimney breast and fireplace.
Start of the job having just run the gas pipe through the loft area from the garage
AFTER
December 2009
Faultless
new limestone fireplace installed to new plastered false chimney breast and powered flue gas fire fitted
AFTER
December 2009
Faultless
Plaster board has been skimmed the day before and now new fireplace starting to be installed
BEFORE
December 2009
Faultless
Plaster board fixed to studwork ready for plastering
BEFORE
December 2009
Faultless
Stud work in position to form false chimney breast to sizes required by customer
BEFORE
December 2009
Faultless
Hole made in internal wall to take gas fire
September 2009
Install Bath Stone Fireplace complete with gas fire
September 2009
Install Bath Stone Fireplace complete with gas fire
AFTER
August 2009
Hole in wall Studio1 glass fronted gas fire
April 2009
Hole in the wall Balanced flue gas fire
AFTER
March 2009
Cobweb trouble gone
As you can now see the cobweb had caused the flue outlet to become blocked there for affecting the performance of the gas fire installed once all cleaned the fire was given the all clear and all flue pipe put back together and sealed and smoke tested
BEFORE
March 2009
Cobweb trouble
flue in loft blocked with cobwebs common finding on precast flue systems
AFTER
April 2009
Installation complete
Limestone fireplace with living flame gas fire
BEFORE
April 2009
Before work started on the new fireplace installation
Brick built fire chamber and gas pipe to right hand side out of floor boards
AFTER
April 2009
Limestone fireplace finished
Installed fire and fireplace
BEFORE
April 2009
Start of limestone fireplace
Limestone hearth with gas pipe moved into fire opening
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?