Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Delwood
39
work photos
My Profile
Page
My Customer
Feedback
My Photos
November 2009
Fitted bathroom, tiling, plumbing etc
Bathroom supplied by Bathstore, Worthing. MyRoom range.
BEFORE
November 2009
Fitted bathroom, tiling, plumbing etc
Bathroom prior to new Bathstore suite installed.
AFTER
November 2009
Fitted bathroom, tiling, plumbing, lighting, etc
Bathrrom supplied by Bathstore, Worthing. MyRoom range.
November 2009
Fitted bathroom, tiling, plumbing etc.
Bathroom and fixtures supplied by Bathstore, Worthing. Floor and wall tiles from Topps Tiles, Shoreham.
March 2010
Complete refurbishment of bathroom and associated building works.
Bathroom and fixtures supplied by Bathstore, Worthing. Tiles from Topps Tiles, Shoreham.
March 2010
Complete refurbishment of bathroom and associated building works
Bathroom and fixtures supplied by Bathstore, Worthing. Tiles from Topps Tiles, Shoreham.
March 2010
Complete refurbishment of bathroom and associated building works
Bathroom and fixtures supplied by Bathstore, Worthing. MyRoom range. Tiles from Topps Tiles, Shoreham.
April 2010
Parque Herringbone flooring laid.
Reclaimed Parque flooring laid, sanded and finished in Liberon clear wax.
October 2009
Kitchen floor tiling and subfloor repairs.
Stepped black and white tiles. Tiles from Topps Tiles, Shoreham.
July 2006
2 bathrooms 1 ensuite floor tiling, doors hung, plumbing, electrics etc..
Bathroom install. Roca products. Tiles from Topps Tiles.
October 2009
100 metres square of shop floor tiling and shop fitting
Shop floor tiling Jagged Edge Hairdressing. Tiles from BQ.
February 2009
Complete new kitchen, tiling, electrics, appliances etc.
New kitchen install. Kitchen and appliances supplied by Howdens, Worthing.
April 2010
Mr Mullers Bathroom install.
Bathroom install with lit glass wall. Bathroom supplied by BQ.
April 2010
Elaborate shed log cabin built and upgraded.
Bespoke modified log cabin built. Upgraded with armoured electrics, flooring, insulation etc etc.
April 2010
Elaborate shed log cabin built.
Internal electrics, wooden flooring, insulation and full decoration.
July 2006
2 bathrooms 1 ensuite floor tiling, doors hung, plumbing, electrics etc..
Bathroom install. Roca products. Tiles from Topps Tiles.
July 2006
Kitchen floor tiling.
Kitchen floor tiles laid. Tiles from Topps Tiles, Shoreham.
April 2010
Full bathroom instillation.
Bathroom install including seperate shower, bath and partition wall. Tiles from Topps Tiles, Shoreham.
April 2010
New bathroom install.
Shower cubicle and basin area.
April 2010
Oak flooring.
Solid wood Oak flooring laid.
April 2010
strip Oak flooring.
Solid wood Oak strip flooring. 3 coat varnish.
April 2010
Decking
Outdoor pretreated decking with balustrades.
November 2006
Complete new bathroom, plastering, brick built larder.
New bathroom install. Spa bath supplied by BQ. Tiles from Topps Tiles, Shoreham.
February 2009
Hallway floor tiling and decoration throughout.
New tiles laid and decoration to walls and ceilings. Custom cut tiles for curved part of hallway.
June 2007
Complete bathroom installation, 2 skylights fitted.
Bathroom supplied by Bathstore, Worthing. Tiles from Topps Tiles, Shoreham.
June 2007
Complete bathroom installation, 2 skylights fitted.
Just about visible at the top is one of the installed, vaulted skylights. Bathroom supplied by Bathstore, Worthing. Tiles from Topps Tiles, Shoreham.
May 2009
Bathroom floor tiling.
New bathroom floor tiles. Tiles supplied by customer.
BEFORE
March 2007
Fully fitted bathroom shower tiling, electrics etc.
Pictured is the WarmUp underfloor heating kit instillation, prior to tiling.
AFTER
August 2006
New door cut in and fitted.
Door cut into cavity wall with concrete lintils, new skirting, architrave etc.
BEFORE
August 2006
Fitting a secondry door into sun lounge.
Door has been cut into existing outside cavity wall. finished in a glass panelled door and matching white architrave.
BEFORE
November 2006
Brick built larder blocked up and door fitted.
New door allowing further acces to rear porch. Before decoration.
March 2007
Fully fitted bathroom / shower room, tiling, electrics etc.
Fitted wet room. Shower unit and wet room drain out of picture to the right of room.
March 2007
Fully fitted bathroom shower tiling, electrics etc.
Bathroom supplied by Grahams, Worthing. Tiles from Topps Tiles, Shoreham.
June 2007
Complete bathroom installation, 2 skylights fitted.
External view of the 2 skylights installed for bathroom.
April 2009
Toilet transformed into wet room shower room with basin.
View from outside of single toilet room / shower etc.
April 2009
Single toilet transformed into shower etc.
Single toilet transformed into wet room / shower room with cloakroom basin.Proof that a tiny single toilet can succesfully house a fully functioning shower and basin also !!
January 2010
Decoration throughout property, floor tiling and floor sanding.
Original sanded floorboards finished in clear wax
April 2010
Facias, gutters etc.
New UPVC facia boards, soffits and guttering throughout entire property. Facia and soffit boards required new timber supports hence scaffolding
October 2008
New staircase fitted, 2 X new wooden garage doors and outside security gate.
Complete new Burbidge staircase balustrades and newel posts.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?