0845 408 4866
Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Dorset Solar Power Limited
41
work photos
My Profile
Page
My Customer
Feedback
My Photos
April 2011
www.dorsetsolarpower.co.uk
the home of solar power on the south coast
November 2009
Andy Thompson
Business Owner
October 2010
Solar Install in Corfe Mullen
fixing the panels to the roof
July 2011
Inverter and Switchgear in garage for solar install in Somerset
July 2011
Shaping roof tiles off the roof to ensure they fit snugly over brackets for solar system
July 2011
Shaping tiles on roof to ensure a flush fit after fitting brackets for solar installation
not all installers do this but it is essential to maintain the integrity of your roof.
August 2011
Fit Solar PV
3kW solar PV install using Sanyo HiT panels on garage roof at Milborne St Andrew, Blandford
August 2011
Fit Solar PV
Generatio meter and AC isolator in garagefor Solar PV install in Milborne St Andrew, Blandford
AFTER
October 2011
16kW installation Barton on Sea
October 2011
Solardek flashing for cable entry
This protects the cable from chaffing while maintaining the intergrity of the roof. Does your installer do this
October 2011
16kW solar PV install Barton on Sea
detail of inverter readout
October 2011
16kW installation Barton on Sea
Inverter and control gear for PV system which will be enclosed in a cupboard later
November 2011
Installation of solar panels
3kW installation in Honiton
DURING
September 2011
Tile has been carefully cut around the bracket and lead inserted underneith
few installers take the time to preserve the roof integrity in this way
AFTER
September 2011
Cables brought through overlap of felt
many installers just push a hole through the felt but going through the overlap preserves the integrity of the roof
AFTER
November 2011
SMA 3000HF inverter in garage
12 Sanyo 250 HiT panels on installation in Honiton Devon
DURING
October 2011
4kW Install in Dorchester
Careful selection of Samsung panels to maximise output
AFTER
January 2012
3.8kW installation in Norfolk
almost flat roof in a conservation area so landscape mounted at low angle to reduce visual impact
DURING
October 2011
Half way through installing rails
brackets can be seen for the bottom 2 rows, rails have been attached on top 2
AFTER
October 2011
Completed 4kW installation
16 Samsung panels on installation in Lydlinch dorset
AFTER
October 2011
Inverter, isolators and meter in garage
4kW installation in Lydlinch Dorset
August 2011
Fit Solar PV
Inverter and control gear in garage loft for Solar PV install in Milborne St Andrew
September 2011
Solar PV install hedge End
control gear, inverter and distribution board in garage for 4kW 2 string solar PV system
September 2011
Solar PV install Winchester
detail of inverter and switch gear in the loft
July 2011
Meter and subboard for solar installation in Wiltshire
AFTER
April 2011
Full rewire of refurbishment property in Lytchett
downlighters on landing
July 2011
Meter and Switchgear on Solar Installation near Bristol
July 2011
Inverter left and switchgear for flat roof based solar system in Dorset
July 2011
Switchgear in garage for Solar install in Waterlooville Hampshire
July 2011
Ground based solar installation in Dorset
July 2011
Twin solar instal on bungalows near Bristol
AFTER
May 2011
Isolators and cabling in Garage for Solar installation
Solar Install near Blandford Forum
September 2010
1.8kW solar instal in Bristol
Fixing thepanels to the roof
October 2010
Solar Install in Corfe Mullen
Detail of inverter and isolator in loft
October 2010
Solar Install in Corfe Mullen
Detail of inverter and isolators in loft
May 2011
lighting cables in section to be boxed in
Just because it doesnt show doesnt mean it shouldnt be tidy
November 2009
Outside electrical work
Outside socket and fused spur to feed outside lighting
October 2010
Solar Install in Corfe Mullen
the completed install, 1.8kW
November 2009
Outside Lighting
Outdoor lights, individually switched from waterproof outdoor switch
AFTER
April 2011
Full rewire of refurbishment property in Lytchett
main Consumer unit, sub board, Data Cabling Unit and mains incomer relocated by DNO
AFTER
April 2011
Full rewire of refurbishment property in Lytchett
Stairwell Lighting
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?