Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
GEM Fencing, Decking & Patios
303
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
May 2012
Replace 10ft gate and posts plus cleft fencing either side of gate
BEFORE
May 2012
Repair Closeboard Fencing and Replace 1 Panel
DURING
May 2012
Repair Closeboard Fencing and Replace 1 Panel
AFTER
May 2012
Repair Closeboard Fencing and Replace 1 Panel
BEFORE
May 2012
Removal of existing fence with a pathway to be made
DURING
May 2012
Removal of existing fence with a pathway to be made
DURING
May 2012
Removal of existing fence with a pathway to be made
AFTER
May 2012
Removal of existing fence with a pathway to be made
BEFORE
April 2012
Replacement of trellis with new Diamond trellis
DURING
April 2012
Replacement of trellis with new Diamond trellis
AFTER
April 2012
Replacement of trellis with new Diamond trellis
BEFORE
April 2012
Replacement of existing 6ft Panels with gravel boards
DURING
April 2012
Replacement of existing 6ft Panels with gravel boards
AFTER
April 2012
Replacement of existing 6ft Panels with gravel boards
BEFORE
April 2012
Take down and assemble new Garden shed
shed to be replaced in bottom corner
DURING
April 2012
Take down and assemble new Garden shed
removal of old one
AFTER
April 2012
Take down and assemble new Garden shed
the new one fuly assembled
BEFORE
April 2012
Replace snapped fence posts and fit new panels in difficulttoaccess site.
DURING
April 2012
Replace snapped fence posts and fit new panels in difficulttoaccess site.
AFTER
April 2012
Replace snapped fence posts and fit new panels in difficulttoaccess site.
old ones to be taken away
BEFORE
April 2012
Replacement of existing 6ft Panel Fencing with new ones
DURING
April 2012
Replacement of existing 6ft Panel Fencing with new ones
during the process
AFTER
April 2012
Replacement of existing 6ft Panel Fencing with new ones
completion
BEFORE
March 2012
Pallisade fencing with bespoke gates
DURING
March 2012
Pallisade fencing with bespoke gates
progress
DURING
March 2012
Pallisade fencing with bespoke gates
AFTER
March 2012
Pallisade fencing with bespoke gates
AFTER
March 2012
Pallisade fencing with bespoke gates
the other bespoke gate at side of house
BEFORE
March 2012
Replacement of panel fencing with closeboard fencing
DURING
March 2012
Replacement of panel fencing with closeboard fencing
AFTER
March 2012
Replacement of panel fencing with closeboard fencing
BEFORE
March 2012
Replacement of old fencing panels
AFTER
March 2012
Replacement of old fencing panels
BEFORE
March 2012
New Panels, Cleft Rails and posts
DURING
March 2012
New Panels, Cleft Rails and posts
AFTER
March 2012
New Panels, Cleft Rails and posts
BEFORE
March 2012
Refix one existing panel, supply new and 2 posts
AFTER
March 2012
Refix one existing panel, supply new and 2 posts
BEFORE
February 2012
New 6ft closeboard fence at side and rear and new gate fitted
rear 6x6 panel side fencedyring removal
BEFORE
February 2012
New 6ft closeboard fence at side and rear and new gate fitted
side fencing that will be replaced with close board fencing
DURING
February 2012
New 6ft closeboard fence at side and rear and new gate fitted
side fencing-old taken down
DURING
February 2012
New 6ft closeboard fence at side and rear and new gate fitted
new closeboard fence at rear in process
AFTER
February 2012
New 6ft closeboard fence at side and rear and new gate fitted
side and rear new fence
AFTER
February 2012
New 6ft closeboard fence at side and rear and new gate fitted
Bespoke gate as requested for customers cat...
BEFORE
February 2012
Replace 2 closeboard panels and 6 cleft rails and 3 morticed posts
DURING
February 2012
Replace 2 closeboard panels and 6 cleft rails and 3 morticed posts
AFTER
February 2012
Replace 2 closeboard panels and 6 cleft rails and 3 morticed posts
AFTER
February 2012
Replace 2 closeboard panels and 6 cleft rails and 3 morticed posts
BEFORE
February 2012
New concrete spur and infill fence panel
AFTER
February 2012
New concrete spur and infill fence panel
BEFORE
January 2012
Repair and Replacement of 6x6 Fencing Panels-storm damage
DURING
January 2012
Repair and Replacement of 6x6 Fencing Panels-storm damage
AFTER
February 2012
Repair and Replacement of 6x6 Fencing Panels-storm damage
AFTER
February 2012
Repair and Replacement of 6x6 Fencing Panels-storm damage
BEFORE
January 2012
Repair storm damaged fence and replace fence post
AFTER
January 2012
Repair storm damaged fence and replace fence post
BEFORE
January 2012
Repair and replace 2 Fencing posts and 11 Panels from storm damage
DURING
January 2012
Repair and replace 2 Fencing posts and 11 Panels from storm damage
AFTER
January 2012
Repair and replace 2 Fencing posts and 11 Panels from storm damage
BEFORE
January 2012
Replace fencing posts and Repair existing panels
DURING
January 2012
Replace fencing posts and Repair existing panels
this what the storms caused recently
AFTER
January 2012
Replace fencing posts and Repair existing panels
BEFORE
December 2011
Storm damage to fence.
AFTER
December 2011
Storm damage to fence.
BEFORE
October 2011
Phase 4: Brickwork and steps area
DURING
November 2011
Phase 4 Brickwork and steps area
the 1st set of steps in progress
AFTER
December 2011
Phase 4 Brickwork and steps area
an example of the brickwork and steps around the patio area
AFTER
November 2011
Phase 4 Brickwork and steps area
Sunken garden area finished
DURING
November 2011
Phase 4 Brickwork and steps area
the 2nd set of steps
BEFORE
October 2011
Phase 3: Rear Garden patio and Pergola
DURING
November 2011
Phase 3: Rear Garden patio and Pergola
starting the pergola build
AFTER
December 2011
Phase 3 Rear Garden patio and Pergola
Patio area finished
AFTER
December 2011
Phase 3 Rear Garden patio and Pergola
Pergola finished
DURING
November 2011
Phase 3 Rear Garden patio and Pergola
the build up and leveling in process
DURING
November 2011
Phase 3 Rear Garden patio and Pergola
in the process
BEFORE
October 2011
Phase 2: Fencing, Gate and shingle area
Before area is gated with shingle
DURING
November 2011
Phase 2 Fencing, Gate and shingle area
The process underway
AFTER
December 2011
Phase 2 Fencing, Gate and shingle area
completion
DURING
November 2011
Phase 2 Fencing, Gate and shingle area
fencing and gate
DURING
November 2011
Phase 2 Fencing, Gate and shingle area
fencing and gate completed
DURING
October 2011
Phase: 1 Front Patio work
during
BEFORE
October 2011
Phase 1: Front Patio work
front patio areabefore
AFTER
November 2011
Phase 1 Front Patio work
DURING
October 2011
Phase: 1 Front Patio work
during the starting process
BEFORE
October 2011
ChainLink Fencing around garden
DURING
October 2011
ChainLink Fencing around garden
AFTER
October 2011
ChainLink Fencing around garden
AFTER
October 2011
Trellis Pergola
AFTER
October 2011
Trellis Pergola
BEFORE
September 2011
New feather edge gate and fence
before i start
DURING
September 2011
New feather edge gate and fence
the start of work
AFTER
September 2011
New feather edge gate and fence
AFTER
September 2011
New feather edge gate and fence
BEFORE
August 2011
Replacement fencing
AFTER
August 2011
Replacement fencing
AFTER
August 2011
Replacement fencing
DURING
August 2011
Palisade Fencing
At start of work
AFTER
August 2011
Palisade Fencing
BEFORE
August 2011
5 Metres Wide Pergola and railway sleepers
DURING
August 2011
5 Metres Wide Pergola and railway sleepers
AFTER
August 2011
5 Metres Wide Pergola and railway sleepers
completed pergola and new railway sleepers
BEFORE
July 2011
Replacement of Decking and Fencing
old decking
AFTER
July 2011
Replacement of Decking and Fencing
BEFORE
July 2011
Replacement of Decking and Fencing
fencing panels needing replacing
AFTER
July 2011
Replacement of Decking and Fencing
new fencing panels
BEFORE
July 2011
Replacement of Decking and Fencing
rotten timber
AFTER
July 2011
Replacement of Decking and Fencing
new decking
DURING
July 2011
Replacement of Decking and Fencing
fencing around a waste area
AFTER
July 2011
Replacement of Decking and Fencing
fencing around waste area
BEFORE
July 2011
Phase 1 Job Decking, Concrete base and Brick work
At start of work
DURING
July 2011
Phase 1 Job Decking, Concrete base and Brick work
DECKING START
AFTER
July 2011
Phase 1 Job Decking, Concrete base and Brick work
COMPLETION
BEFORE
June 2011
New boundary fencing -6FT 6 CLOSE BOARD
clearing the hedge back along boundary
DURING
June 2011
New boundary fencing 6FT 6 CLOSE BOARD
almost done
AFTER
June 2011
New boundary fencing 6FT 6 CLOSE BOARD
completion
BEFORE
May 2011
Raised decking with Glass Balustrade
area prior to commencing work
DURING
June 2011
Raised decking with Glass Balustrade
DURING THE PROCESS
AFTER
June 2011
Raised decking with Glass Balustrade
AFTER
June 2011
Raised decking with Glass Balustrade
STEPS TO THE SIDE OF RAISED DECKING
AFTER
June 2011
Raised decking with Glass Balustrade
CLOSER LOOK AT THE GLASS BALUSTRADE
BEFORE
May 2011
Phase 2 Job Balustrade, Steps and Trellis Work
DURING
April 2011
Phase 2 Job Balustrade, Steps and Trellis Work
preparation for balustrade
DURING
May 2011
Phase 2 Job Balustrade, Steps and Trellis Work
Balustrade around decking area
DURING
May 2011
Phase 2 Job Balustrade, Steps and Trellis Work
One set of steps and trellis in progress
DURING
May 2011
Phase 2 Job Balustrade, Steps and Trellis Work
the other set of steps
DURING
May 2011
Phase 2 Job Balustrade, Steps and Trellis Work
trellis work in progress
AFTER
May 2011
Phase 2 Job Balustrade, Steps and Trellis Work
completion of allside shot
AFTER
May 2011
Phase 2 Job Balustrade, Steps and Trellis Work
completion of allbottom shot
AFTER
May 2011
Phase 2 Job Balustrade, Steps and Trellis Work
completion of allside shot
AFTER
May 2011
Phase 2 Job Balustrade, Steps and Trellis Work
completion view from the top
BEFORE
March 2011
New Patio with Bradstone slabs and edgings with Old Riven Stone circle
DURING
March 2011
New Patio with Bradstone slabs and edgings with Old Riven Stone circle
DURING
April 2011
New Patio with Bradstone slabs and edgings with Old Riven Stone circle
AFTER
April 2011
New Patio with Bradstone slabs and edgings with Old Riven Stone circle
Completed job with two built planters with seating area
DURING
April 2011
New Patio with Bradstone slabs and edgings with Old Riven Stone circle
BEFORE
March 2011
PHASE 1 JOB: 22ft x 22ft Herringbone Decking area
decking will be in the middle area where planks are
DURING
March 2011
PHASE 1 JOB: 22ft x 22ft Herringbone Decking area
AFTER
March 2011
PHASE 1 JOB: 22ft x 22ft Herringbone Decking area
Finished project
AFTER
March 2011
PHASE 1 JOB: 22ft x 22ft Herringbone Decking area
DURING
March 2011
PHASE 1 JOB: 22ft x 22ft Herringbone Decking area
showing the height from the grounddipped area near river
February 2011
Decking built under dense woodlands
decking built throught this archway
BEFORE
February 2011
Decking built under dense woodlands
AFTER
February 2011
Decking built under dense woodlands
DURING
February 2011
Decking built under dense woodlands
BEFORE
February 2011
Decking around swimming pool
Replacing and renewing rotten decking
DURING
February 2011
Decking around swimming pool
AFTER
February 2011
Decking around swimming poolHand made gate
AFTER
February 2011
Decking around swimming pool and handmade gate
Completed project
BEFORE
February 2011
Decking around swimming pool
Replacing and renewing rotten decking
AFTER
February 2011
Decking around swimming pool
Completed project
DURING
February 2011
Decking around swimming pool
Replacing and renewing rotten decking
DURING
February 2011
Decking around swimming pool
Replacing and renewing rotten decking
DURING
January 2009
Brick archway built into hedge
DURING
February 2011
Decking around swimming pool
DURING
April 2010
Decking build with steps up to kitchen doors on 1st floor
decking up with steps started
AFTER
April 2010
Decking build with steps up to kitchen doors on 1st floor
BEFORE
April 2010
Replacement garden fence and gate. And small area of paving for bin store
AFTER
April 2010
Replacement garden fence and gate. And small area of paving for bin store
March 2009
Garden Fence and Decking Work
AFTER
March 2009
Garden Fence and Decking Work
Decking over stream
August 2010
Extention of circular patio
AFTER
August 2010
Extention of circular patio
BEFORE
September 2010
Extention from extention of circular patio
September 2010
Extention from extention of circular patio
May 2010
DECKING AND PATIO WITH PERGOLA
AFTER
July 2010
Decking and patio
AFTER
June 2010
DECKING AND PATIO WITH PERGOLA and new gate
finished job
BEFORE
December 2010
Plaistow Primary School Wall Rebuild
DURING
December 2010
Plaistow Primary School Wall Rebuild
DURING
November 2010
Kitchen Refit into the garage
DURING
November 2010
Kitchen Refit into the garage
AFTER
November 2010
Kitchen Refit into the garage
AFTER
September 2010
Extention from extention of circular patio
AFTER
September 2010
Extention from extention of cirular patio
September 2010
Extention from Extention of circular patio
September 2010
Extention from extention of circular patio
BEFORE
August 2010
Extention of circular patio
August 2010
Extention of circular patio
August 2010
Extention of circular patio
AFTER
August 2010
Extention of circular patio
BEFORE
April 2010
DECKING AND PATIO WITH PERGOLA
AFTER
June 2010
DECKING AND PATIO WITH PERGOLA and new gate
BEFORE
July 2010
Making patio area out of existing slabs.
July 2010
Making patio area out of existing slabs.
July 2010
Making patio area out of existing slabs.
BEFORE
July 2010
Making patio area out of existing slabs.
AFTER
July 2010
Making patio area out of existing slabs.
near completion
BEFORE
June 2010
New Fence and Garden Makeover
BEFORE
June 2010
New Fence and Garden Makeover
AFTER
June 2010
New Fence and Garden Makeover
BEFORE
June 2010
New Fence and Garden Makeover
AFTER
July 2010
New Fence and Garden Makeover
AFTER
July 2010
New Fence and Garden Makeover
AFTER
July 2010
New Fence and Garden Makeover
AFTER
July 2010
New Fence and Garden Makeover
BEFORE
June 2010
Repairs to fence painting property.
AFTER
June 2010
Repairs to fence painting property.
AFTER
January 2009
BRICK ARCHWAY GATE BUILT INTO A 4FT WIDE HEDGE
BEFORE
April 2010
DECKING AND PATIO WITH PERGOLA
AFTER
June 2010
DECKING AND PATIO WITH PERGOLA and new gate
new slab works
AFTER
June 2010
DECKING AND PATIO WITH PERGOLA and new gate
finished repaving work
June 2010
DECKING AND PATIO WITH PERGOLA and new gate
extras for jobgate build
May 2010
DECKING AND PATIO WITH PERGOLA
May 2010
DECKING AND PATIO WITH PERGOLA
May 2010
DECKING AND PATIO WITH PERGOLA
May 2010
DECKING AND PATIO WITH PERGOLA
AFTER
July 2010
Decking and patio
BEFORE
May 2010
Rabbit Hutch build
beginning
AFTER
May 2010
Rabbit Hutch build
AFTER
May 2010
Rabbit Hutch build
BEFORE
April 2010
Decking build with steps up to kitchen doors on 1st floor
before
BEFORE
April 2010
Decking build with steps up to kitchen doors on 1st floor
the beginning
AFTER
April 2010
Decking build with steps up to kitchen doors on 1st floor
April 2010
Decking build with steps up to kitchen doors on 1st floor
view from ground floor
April 2010
Decking build with steps up to kitchen doors on 1st floor
April 2010
Decking build with steps up to kitchen doors on 1st floor
April 2010
Decking build with steps up to kitchen doors on 1st floor
April 2010
Decking build with steps up to kitchen doors on 1st floor
AFTER
April 2010
Decking build with steps up to kitchen doors on 1st floor
BEFORE
April 2010
Replacement Trellis for roses
BEFORE
April 2010
Replacement Trellis for roses
AFTER
April 2010
Replacement Trellis for roses
AFTER
April 2010
Replacement Trellis for roses
BEFORE
March 2010
Chimney Brickwork removal and rebuild
BEFORE
March 2010
Chimney Brickwork removal and rebuild
due to weather over the winter, render has cracked, with frost damage
BEFORE
March 2010
Chimney Brickwork removal and rebuild
March 2010
Chimney Brickwork removal and rebuild
April 2010
Chimney Brickwork removal and rebuild
AFTER
April 2010
Chimney Brickwork removal and rebuild
AFTER
April 2010
Chimney Brickwork removal and rebuild
April 2010
Chimney Brickwork removal and rebuild
near completion
BEFORE
March 2010
Closeboard fencing erect
AFTER
March 2010
Closeboard fencing erect
AFTER
April 2010
Patio for Recycling bin area
completion
AFTER
March 2010
Closeboard fencing erect
when finished
BEFORE
February 2010
Extension Of Greenhouse FootingsPaving
February 2010
Extension Of Greenhouse Footings and Paving
AFTER
February 2010
Extension Of Greenhouse Footings and Paving
BEFORE
April 2006
Patio and Paving Redesign Before and after
AFTER
May 2007
Oak Pergola
July 2004
Raised Decking with steps -safety balistrade Before and after
AFTER
June 2009
Garden Design
Fininshed planters shingled area. ropepole divider
April 2005
Decking around conservatory Before and after
BEFORE
June 2009
Garden Design
DURING
January 2009
BRICK ARCHWAY GATE BUILT INTO 4FT HEDGE
AFTER
April 2003
Decking and Jacuzzi cover and Fencingtopbottom of garden
two seperate jobs
October 2008
Fireplace Rebuild Before and After
August 2005
Two patio jobsone raised Before and After
AFTER
December 2009
Fencing, Patio and Turfing Completed
AFTER
February 2009
Fireplace Rebuild
Marble Surround and Brass finish
AFTER
March 2009
Garden Fence Cleft Rail and Planters, Archway, Palisade Gate
BEFORE
June 2010
New Fence and Garden Makeover
June 2009
Garden DesignPathway
June 2003
FishPond and Bridge Decking and Fencing
Two seperate jobs patio photos also on gallery pics
June 2009
Garden Design
Poles in place for hanging ropes
AFTER
October 2008
FIREPLACE REBUILD AFTER
AFTER
March 2009
Garden Fence Cleft Rail and Planters, Archway, Palisade Gate
BEFORE
December 2009
Fencing, Patio and Turfing
Refenced, built patio design and turfed area
AFTER
December 2009
Fencing, Patio and Turfing
Fencing up
July 2007
Levelling and Recapping 400yr old wall
Before and after
AFTER
June 2009
Patio and Paving Re-design
BEFORE
March 2009
Garden Fence and Decking Work
Before fencing
September 2006
Folley Brickwork custom made Before and After
AFTER
May 2001
3 Rail Cleft Fencing and Gate plus New Patio
AFTER
April 2004
Two circle Patio and Trellis Fence
AFTER
April 2004
Two circle Patio and Trellis Fence
AFTER
May 2007
Oak Pergola
BEFORE
March 2009
Garden Fence and Decking Work
AFTER
March 2009
Garden Fence and Decking Work
AFTER
June 2009
Garden DesignPathway
Golden woodbark pathway
June 2009
Garden Design
Raised sleeper herb beds
June 2009
Garden Design
June 1999
Trellis in front and back garden before and after
March 2009
Garden Fence and Decking Work
June 2009
Garden Design-Pathway
Start of pathway through stones
AFTER
July 2009
Garden Design
Completed Rope Design
AFTER
July 2009
Garden Design
Completed Rope Design
BEFORE
March 2009
Garden Fence and Decking Work
Bridge before decking over it
BEFORE
March 2009
Garden Fence and Decking Work
AFTER
March 2009
Garden Fence Cleft Rail and Planters, Archway, Palisade Gate
March 2009
Garden Fence and Decking Work
AFTER
March 2009
Garden Fence and Decking Work
BEFORE
March 2009
Pathway and Lawn work
BEFORE
March 2009
Pathway and Lawn work
Ready for slate chipping
March 2009
Pathway and Lawn work
Chippping
AFTER
March 2009
Pathway and Lawn work
chipping and returf
BEFORE
April 2007
Oak Pergola
AFTER
June 2006
Retaining Wall and Patio work
May 2005
New Patio
Before and after
June 2007
Garden redesignPatio and Turfing Before and After
April 2002
Garden design Pergola with Decking Before and After
April 2004
Two different Decking jobsBefore and After
May 2007
Garden Design Replaced Brickwork with Pergola
AFTER
August 2003
Curved Trellis Fencing and Pergola
AFTER
June 1999
Garden Designs Decking with steps Pergola
June 2002
Decking throughout garden with new patio Before and after
BEFORE
August 2006
Garden before patio built
AFTER
August 2006
Garden-Patio and Trellis
AFTER
April 2006
Paving and Patio around gardenPink
AFTER
April 2006
Patio and paving redesign
Part way through
August 2008
FIREPLACE REBUILD IN PROCESS
BEFORE
December 2009
Fencing, Patio and Turfing
AFTER
April 2010
Replacement garden fence and gate. And small area of paving for bin store
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?