Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
GLC Plumbing & Heating
30
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
January 2011
Complete gutting and refit of new bathroom suit
Original bathroom
AFTER
January 2011
Completely gutting and refitting of bathroom
New bath,mixer shower and wc in new location
BEFORE
January 2011
Completely gutting and refitting of bathroom
old wc and basin
AFTER
January 2011
Completely gutting and refitting of bathroom
New towel rad and vanity unit
BEFORE
November 2010
bathroom re fit
before works picture with wall
AFTER
December 2010
bahroom re fit
wall removed re tiled and new sanitery ware installed.
BEFORE
February 2011
bayhroom re fit
old bath
AFTER
December 2010
bathroom re fit
new roll top bath and tiling
BEFORE
July 2009
Old shower location
AFTER
July 2009
New Wetroom
Photo shows installation of new wetroom level deck prior to laying of vinyl flooring
AFTER
February 2009
Connect into existing flow and return radiator pipes behind toilet cistern, to supply new radiator
AFTER
October 2009
Only possible location for a basin in this small cloakroom
AFTER
August 2011
completed bathroom
tiled complete with quadrant shower enclosue and wc shown.
AFTER
August 2011
completed refit
shower enclosure with wc and tiled complete
BEFORE
August 2011
Bathroom installation.
AFTER
August 2011
Bathroom installation.
retile and install walk in shower and sanitray ware
BEFORE
September 2011
old iron bath and decor
AFTER
September 2011
Tiled walls and floor with shower enclosure and basin
AFTER
September 2010
towel rad
new chrome towel radiator looks great
AFTER
June 2009
old airing cupboard
install combi boiler and build bathroom shelving
DURING
December 2010
wireless ba th andshower from aqualisa
processors installed in loft
DURING
September 2009
install shower deck
fix supporting joists
AFTER
September 2009
install shower deck
in place prior to tiling
AFTER
October 2009
Install new basin and surface
BEFORE
January 2010
Complete bathroom re fit.
before work
AFTER
January 2010
Complete bathroom re fit.
AFTER
April 2009
Completed bathroom installation
AFTER
April 2009
Completed shower area
AFTER
January 2009
Supply and fit new bath and shower
DURING
October 2009
Kitchen carcass, 1st fix
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?