Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Greenway Construction
26
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
June 2009
Barn before work
AFTER
September 2009
Supply and install glazed oakwell head and lighting to well shaft.
AFTER
September 2009
New ensuite bathroom, oak floor, tiling etc.
AFTER
January 2010
Internal of Barn
Light and spacious barn.
AFTER
January 2010
Internal of barn
structural timbers in barn.
AFTER
October 2009
Exterior of Barn
Barn refurbishment conversion
BEFORE
July 2009
Begining of barn work.
Refurbishment conversion of Barn.
November 2008
Bathroom Refurbishment.
Supply and install new bathroom suite including shower cubical. supply and lay Oak flooring.
October 2008
Lead work to chimney stacks in Richmond upon Thames.
Supply and install new lead flashings to 4 large chimney stacks.
January 2008
Removal of supporting wall to enlarge kitchen. installation of services, floor tiling etc.
Removal of supporting wall and installation of steel beams and columbs. installation of all services for new kitchen. Tile floor with polished slate. reposition of back door. installation of new french doors.
September 2007
Balcony over boiler house entrance. staircase down to boiler house.
excavate to create basement boiler house. construct balcony patio over. supply and install wrought iron ballastrades.
August 2008
Sun Lounge.
Double glazed green oak sun lounge. With pitched roof in salvaged tiles to match existing.
AFTER
June 2009
Supply and install new block aluminium double glazed windows.
Juliet style French doors and wrought iron balcony.
AFTER
September 2006
mullen kitchen broomhill
kitchen works complete in large manor house.
AFTER
April 2006
Enlargementrefurbishment of Kitchen, diningroom and Conservatory.
AFTER
August 2005
Total refurbishment of showroom
show room completed
DURING
August 2005
Total refurbishment of showroom
Removal of old show room and first fix plaster prepare.
AFTER
September 2010
New RSJ in position and clad.
New beam in position and clad in plaster work. painted and stained to resemble oak beam.
DURING
April 2010
Installation of steel beam at Ivy Cottage.
Removal of defective timber beam and post.
AFTER
September 2007
Removal of structural wall and installation of RSJs etc.
DURING
August 2007
Removal of structural wall and installation of RSJs etc.
Removal of walls and first fix services
AFTER
November 2007
Weller Kitchen Refurb. Completed
Final stages of kitchen, family room refurbishment enlargement
BEFORE
October 2007
Weller Kitchen Refurb.
old kitchen stripped out and left hand wall removed to create opening
May 2006
Pitched roof. Supply and install Double glazing to property.
Removal of existing flat roof on 2 storey extension. pitch roof and tile to match existing. Supply and install replacement double glazing to entire property.
May 2006
extension and landscaping in Epsom, Surrey.
Extension to property which included kitchen, utility room, garage and guest bedroom above.
June 2007
L.Mullin Bespoke Kitchen.
Removal of wall between 2 rooms. installation of all new service, tiling etc. for new bespoke kitchen.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?