Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Hambro Roofing Ltd
20
photos of recent work
My Profile
My Feedback (24)
My Photos (20)
AFTER
March 2008
Liquid Plastics, London W12
Overlaid existing EPDM roof with Liquid Plastics roofing system, guaranteed for 12 years.
AFTER
July 2006
Sarnafil single ply membrane, London WC2
Overlaid existing asphalt roof with Sarnafil light grey single ply membrane.
AFTER
June 2008
Sarnafil single ply Wimbledon, London
New works, we cut chase, installed Sarnafil single ply membrane and lead cover flashings to the perimeter.
AFTER
April 2009
Longacre, London WC2 Sarnafil single ply
New work, box gutter required waterproofing. We installed Sarnafil membrane with insulated upstands.
AFTER
April 2008
Axter reinforced bituminous membrane, London NW1
Existing asphalt roof had failed, we stripped up and disposed of asphalt and installed Axters reinforced bituminous membrane complete with insurnace backed guarantee.
AFTER
October 2008
Reinforced felt membrane Hammersmith, London W6
Installed IcoPals reinforced felt membrane.
AFTER
December 2008
Axter tapered insulation and reinforced bituminous membrane, London E1
New work, we supplied and installed Axter vapour barrier, tapered insulation system and reinforced membrane.
AFTER
February 2009
Earls Court London Underground Station, London SW5
We stripped up the existing felt covering and replaced with Axters reinforced membrane.
AFTER
February 2009
Onslow Square, London SW3
Supplied and installed a reinforced felt membrane to part section of the main roof of a block of flats.
AFTER
March 2009
Axter reinforced bituminous membrane, London W12
The existing roof covering had been blown off of the roof. We installed Axters reinforced membrane, lead flashings and lead apron detail to the front and rear elevation.
AFTER
April 2009
Fulham, London SW6
Existing roof required replacing. We installed a reinforced bituminous membrane and applied a sealant to the brickwork of the outside wall.
AFTER
April 2009
Replacement rooflight, London NW6
We took off and disposed of existing light, supplied and installed a new double skinned, manual opening, polycarbonate rooflight.
AFTER
July 2011
High performance felt
The existing roof was stripped up, reboarded, a new opening formed, insulated, felted with 3 layers and installed 3 new skylights.
AFTER
August 2011
Mastic asphalt
We install 120mm insulation and mastic asphalt to 500m2 of this factory spread over multiple roofs.
AFTER
December 2011
Sarnafil single ply with green roof and solar panels
We supplied and installed vapour barrier, insulation and Sarnafil single ply membrane to the main roof, terrace and cornice ready to receive solar panels and a green roof finish.
AFTER
October 2011
Lead roof
The existing mastic asphalt had failed and the client wanted something more durable. We stripped the existing roof and deck, insulated and decked the roof allowing for ventilation and installed a code 5 lead roof complete with new water tank, housing and render to the parapet walls.
DURING
September 2011
Solar PV
The client wanted to have a Solar PV roofing system installed to generate their own electricity, benefit from the Governments Feed In Tariff FIT and at the same time helping the environment by reducing their carbon footprint. We installed a 2.5 Kw system consisting of 10 solar panels.
AFTER
December 2008
Replacement rooflight, London E3
We took off and disposed of existing light, supplied and installed a new double skinned, polycarbonate rooflight.
AFTER
May 2009
Lime Harbour, Isle of Dogs, London E14
Take up hogging ballast, clean prime and install a reinforced felt membrane overlaid the exisitng mastic asphalt roof covering.
AFTER
April 2009
Longacre, London WC2 Sarnafil single ply
Install vapour barrier, tapered insulation and Sarnafil single ply membrane colour used light grey
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?