Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Harrington Internal/External Carpentry
258
photos of recent work
My Profile
My Feedback (162)
My Photos (258)
May 2013
Removed existing failing retaining wall, installed new concrete posts, 12 gravel boards and slotted
April 2013
Supplied and erected featheredged fencing and concrete posts.
April 2013
Supplied and erected featheredged fencing and concrete posts.
October 2008
50 sqm of elevated decking across 2 tiers, with steps down to garden.
October 2012
Fitted new garage door frame and new tongue and groove cladding to gable end of garage, supplied and
October 2012
Fitted new garage door frame and new tongue and groove cladding to gable end of garage, supplied and
February 2009
3ft Closeboard Featheredge fencing with capping and globes
September 2010
Childrens adventure playhouse
Veranda at the front, look out post at the back, easy access ladder, climbing wall,scramble net on far side and camouflage netting at rear.
November 2011
New feather edge fence and purpose built gate
August 2012
Pair of bespoke pressure treated, tongue and groove driveway gates.
April 2012
Oak post rail fencing.
January 2013
Rendered garage wall, fitted new door frame, installed pair of custom made pressure treated tongue a
October 2012
Supplied and erected new featheredge fencing with concrete posts and bespoke side gate to match.
September 2011
Supplied and erected approx 33ft of closeboard fencing with additional trellis, incorporating bespok
April 2013
Supplied and erected featheredged fencing and concrete posts.
April 2013
Supplied and erected featheredged fencing and concrete posts.
October 2012
Fitted new window frame, door frame and bespoke tongue and groove door to outhouse.
October 2012
Fitted new window frame, door frame and bespoke tongue and groove door to outhouse.
March 2012
Made to order, pressure treated, TGV, driveway gates.
March 2012
Made to order, pressure treated, TGV, garage doors.
October 2012
Supplied and fitted bespoke, arch top side gate and frame.
October 2012
Supplied and installed bespoke side gate, frame and additional tongue and groove cladding to match.
October 2012
Supplied and installed bespoke side gate, frame and additional tongue and groove cladding to match.
August 2012
Pair of custom made pressure treated, tongue and groove gates.
September 2012
Supplied and erected approx 43 ft of Featheredge fencing, with mortised concrete posts to side borde
June 2012
Supplied and erected 62 ft of Featheredge fencing and fitted new bespoke Featheredge side gate to
June 2012
Supplied and erected 62 ft of Featheredge fencing and fitted new bespoke Featheredge side gate to
June 2012
Supplied and erected 62 ft of Featheredge fencing and fitted new bespoke Featheredge side gate to
June 2012
Supplied and erected 62 ft of Featheredge fencing and fitted new bespoke Featheredge side gate to
April 2012
Oak post rail fencing
February 2012
Supplied and erected 116 ft of featheredge fencing, incorporating new featheredge side gate to match
February 2012
Supplied and erected 116 ft of featheredge fencing, incorporating new featheredge side gate to match
February 2012
Supplied and erected 116 ft of featheredge fencing, incorporating new featheredge side gate to match
February 2012
Supplied and erected 116 ft of featheredge fencing, incorporating new featheredge side gate to match
November 2011
New feather edge fence and purpose built gate
November 2011
New feather edge fence and purpose built gate
September 2011
Supplied and erected approx 33ft of closeboard fencing with additional trellis, incorporating bespok
September 2011
Supplied and erected approx 33ft of closeboard fencing with additional trellis, incorporating bespok
September 2011
Supplied and erected approx 33ft of closeboard fencing with additional trellis, incorporating bespok
February 2012
Supplied and erected 100 of featheredge fencing, combining bespoke trellis panels and capping detai
February 2012
Supplied and erected 100 of featheredge fencing, combining bespoke trellis panels and capping detai
February 2012
Supplied and erected 100 of featheredge fencing, combining bespoke trellis panels and capping detai
February 2012
Supplied and erected 100 of featheredge fencing, combining bespoke trellis panels and capping detai
December 2011
Replaced approx 70 ft of Featheredge fencing, incorporating new side gate to match fencing
December 2011
Replaced approx 70 ft of Featheredge fencing, incorporating new side gate to match fencing
December 2011
Replaced approx 70 ft of Featheredge fencing, incorporating new side gate to match fencing
December 2011
Replaced approx 70 ft of Featheredge fencing, incorporating new side gate to match fencing
March 2012
Supplied and erected 64ft of featheredge fencing
March 2012
Supplied and erected 64ft of featheredge fencing
March 2012
Supplied and erected 64ft of featheredge fencing
DURING
April 2013
Supply and erect new featheredge fencing.
Featheredge fencing with capping detail
DURING
April 2013
Supply and erect new featheredge fencing.
Featheredge fencing with capping detail
AFTER
April 2013
Supply and erect new featheredge fencing.
Featheredge fencing with capping detail
AFTER
April 2013
Supply and erect new featheredge fencing.
Featheredge fencing with capping detail
March 2012
Supplied and erected 23 ft of featheredge fencing, following the gardens natural change in elevati
April 2012
Supplied and erected 126ft of featheredge fencing in an L shape, finished with capping detail.
April 2012
Supplied and erected 126ft of featheredge fencing in an L shape, finished with capping detail.
April 2012
Supplied and erected 126ft of featheredge fencing in an L shape, finished with capping detail.
April 2012
Supplied and erected 126ft of featheredge fencing in an L shape, finished with capping detail.
September 2012
Supplied new bespoke Featheredge gate, with additional Featheredge fencing to rear garden. Also s
September 2012
Supplied new bespoke Featheredge gate, with additional Featheredge fencing to rear garden. Also s
September 2012
Supplied new bespoke Featheredge gate, with additional Featheredge fencing to rear garden. Also s
September 2012
Supplied new bespoke Featheredge gate, with additional Featheredge fencing to rear garden. Also s
April 2013
Replacement of two fences.
Featheredge fencing with concrete posts
April 2013
Replacement of two fences.
Featheredge fencing with concrete posts
April 2013
Replacement of two fences.
Oak Featheredge fencing
April 2013
Replacement of two fences.
Oak Featheredge fencing
March 2012
Made to order pressure treated, TGV, garage doors.
March 2012
Made to order pressure treated, TGV, garage doors.
May 2009
7 x 7 softwood tongue and groove glazed garage doors
September 2009
Fitted new frame and hung 7ft.x7ft. framed,ledged and braced,tongue and groove garage doors.
February 2010
Fitting of new garage door and frame
February 2010
Fitting of new garage door and frame
June 2011
Constructed a pair of bespoke driveway gates and single side gate to match. Also erected 25 of fea
June 2011
Constructed a pair of bespoke driveway gates and single side gate to match. Also erected 25 of fea
August 2009
Internal view of custom made double driveway gates, adjoining single gate
August 2009
External view of custom made driveway gates and adjoining single gate
August 2009
Internal view of tongue groove single gate, adjoined to tongue groove driveway gates
July 2010
Fitted new timber frame to suit concrete garage frame, fitted pair of tongue and groove timber garag
May 2010
Built and fitted new double driveway gate
May 2010
Built and fitted new double driveway gate
February 2009
Fitted timber battens to existing iron garage gates ready for cladding
February 2009
Garage gates clad in pressure treated softwood tongue and groove boards
December 2010
Supplied and fitted new tongue and groove side gate, with additional tongue and groove fencing to ma
December 2010
Supplied and fitted new tongue and groove side gate, with additional tongue and groove fencing to ma
February 2009
Closeboard featheredge driveway gates made to size
April 2012
Supplied and fitted new Tongue and groove side gate
April 2012
Supplied and fitted new Tongue and groove side gate
June 2011
Constructed a pair of bespoke driveway gates and single side gate to match. Also erected 25 of fea
June 2011
Constructed a pair of bespoke driveway gates and single side gate to match. Also erected 25 of fea
February 2009
Internal view of closeboard featherege gate, made to size
February 2009
External view of driveway gates
February 2009
Internal view of driveway gates
February 2009
Charlton field gate
April 2011
Supplied and erected approx 108 ft of panelled fencing, negotiating a protruding tree halfway along
February 2009
6ft x 6ft standard lap panel fence with 4x4 posts
April 2009
Replaced 80 of panelled fencing 5 high.
February 2009
Landscape view of 6ft Closeboard Featheredge fencing with trellis
February 2009
6ft Closeboard Featheredge fencing with trellis
July 2009
42 Long and 3 high closeboard fence erected on existing brick wall
June 2007
Supply and fit 44 close boardfencing
April 2010
Supplied and erected 42 ft of close board fencing, incorporating gate to match.
June 2009
Supplied and erected 160 of close board fencing.
February 2009
featheredge fencing
January 2010
Supplied and erected 50 of closeboard featheredge fencing, finished with capping and round finia
April 2010
Supplied and erected 37 ft of CloseboardFeatheredge fencing with trellis panels fitted on top.
March 2010
Supplied and erected 150 of closeboardfeatheredge fencing finished with capping and incorporatin
May 2010
Fitted new concertina loft ladder and hatch, and boarded out loft space.
September 2011
Installed 3 section aluminium loft ladder and fitted new loft hatch released by touchcatch mechanis
May 2010
Fitted new concertina loft ladder and hatch, and boarded out loft space.
May 2010
Fitted new concertina loft ladder and hatch, and boarded out loft space.
November 2011
Constructed new fitted cupboard to house existing boiler. Additionally boxed in all exposed pipewor
November 2011
Constructed new fitted cupboard to house existing boiler. Additionally boxed in all exposed pipewor
November 2011
Constructed new fitted cupboard to house existing boiler. Additionally boxed in all exposed pipewor
November 2011
Constructed new fitted cupboard to house existing boiler. Additionally boxed in all exposed pipewor
September 2009
removed old insulation and replaced with 170mm thick rockwool.Boarded central area for storage
February 2009
Constructed false chimney breast, plasterboarded and fitted new skirting
April 2011
Constructed fitted cupboard and open plan bookcase using 18mm M.D.F, ready to decorate.
April 2011
Constructed fitted wardrobe and open plan bookcase using 18mm M.D.F, ready to decorate.
April 2011
Constructed fitted cupboard and open plan bookcase using 18mm M.D.F, ready to decorate.
April 2011
Constructed fitted cupboard and open plan bookcase using 18mm M.D.F, ready to decorate.
May 2010
2 base units and shelving built into the alcoves of my front room.
May 2010
2 base units and shelving built into the alcoves of my front room.
May 2010
2 base units and shelving built into the alcoves of my front room.
May 2010
2 base units and shelving built into the alcoves of my front room.
May 2010
2 base units and shelving built into the alcoves of my front room.
June 2010
Constructed two base units and fitted them into alcoves with scribed end panels and work top. Float
June 2010
Constructed two base units and fitted them into alcoves with scribed end panels and work top. Float
June 2010
Constructed two base units and fitted them into alcoves with scribed end panels and work top. Float
November 2010
Constructed two fitted base units with fitted bookcase shelving above, to clients designs. Fitted s
November 2010
Constructed two fitted base units with fitted bookcase shelving above, to clients designs. Fitted s
November 2010
Constructed two fitted base units with fitted bookcase shelving above, to clients designs. Fitted s
November 2010
Constructed two fitted base units with fitted bookcase shelving above, to clients designs. Fitted s
November 2010
Constructed two fitted base units with fitted bookcase shelving above, to clients designs. Fitted s
December 2012
Fitted wardrobes.
December 2012
Fitted wardrobes
December 2012
Fitted wardrobes.
December 2012
Fitted wardrobes.
December 2012
Fitted wardrobes.
November 2007
fitted sliding wardrobes
February 2009
Replaced sliding wardrobe doors for panelled hinged doors
December 2009
Installed fitted floor to ceiling, 4 door mirrored sliding wardrobes
December 2009
Installed fitted floor to ceiling, 4 door mirrored sliding wardrobes
April 2010
Installed floor to ceiling fitted sliding wardrobes.
Internal view of fitted wardrobes
February 2009
Fitted sliding wardrobes , in alcove. Doors floor to ceiling.
February 2009
Fitted sliding wardrobes, with side panel. Double hanging and top shelf.
September 2011
Constructed new fitted wardrobe into existing alcove, complete with internal shelving unit and hang
September 2011
Constructed new fitted wardrobe into existing alcove, complete with internal shelving unit and hang
March 2011
Bespoke fitted Wardrobe and open plan Bookcase in Charcoal M.F.C
March 2011
Bespoke open plan Bookcase in Charcoal M.F.C
March 2011
Bespoke fitted Wardrobe and open plan bookcase in Charcoal M.F.C.
March 2011
Bespoke fitted Bookcase with doors in Charcoal M.F.C.
March 2011
Bespoke fitted bookcaes with doors in Charcoal M.F.C.
September 2011
Bespoke fitted 2 drawer chest in charcoal M.F.C.
March 2012
Fitted floor to ceiling double wardrobe, with sliding doors.
February 2012
Installed floor to ceiling sliding wardrobes to master bedroom and bedroom 2. Internal shelving and
February 2012
Installed floor to ceiling sliding wardrobes to master bedroom and bedroom 2. Internal shelving and
February 2012
Installed floor to ceiling sliding wardrobes to master bedroom and bedroom 2. Internal shelving and
February 2012
Installed floor to ceiling sliding wardrobes to master bedroom and bedroom 2. Internal shelving and
February 2012
Installed floor to ceiling sliding wardrobes to master bedroom and bedroom 2. Internal shelving and
March 2012
Fitted floor to ceiling single wardrobe, with sliding doors.
October 2011
Constructed new fitted wardrobe arrangement beneath sloping ceiling of existing alcove, complete wit
October 2011
Constructed new fitted wardrobe arrangement beneath sloping ceiling of existing alcove, complete wit
October 2011
Replaced drawer fronts of existing dressing table. Cut existing pelmet to new height and refitted.
February 2009
Storage cupboard for garage
February 2009
storage unit made to size
September 2012
Constructed workbench and shelving.
September 2012
Constructed workbench and shelving.
February 2009
Constructed landing cupboard beneath sloping ceiling
February 2009
Removed old skirting. Laid damp proof ulay , staggered oak boards and left expansion gap up to wall.
February 2009
solid oak flooring completed and doors eased.
August 2012
Solid Oak tongue and groove flooring supplied and installed. Skirtings removed and replaced.
October 2010
Engineered wood floor laid throughout ground floor
BEFORE
July 2012
Existing patio area
BEFORE
July 2012
Existing patio area
DURING
July 2012
Secured 4 X 4 timber foundation stilts.
DURING
July 2012
Joists and newel posts fixed to foundation stilts.
DURING
July 2012
Deck boards screw fixed to joists.
DURING
July 2012
Deck boards screw fixed to joists, evenly spaced.
AFTER
July 2012
Elevated decked area of 30 sq.m, finished with newel posts and Manila rope.
AFTER
July 2012
Elevated decked area of 30sq.m, finished with newel posts and Manila rope.
June 2011
Garden decking with step down into garden, and a wooden side gate replacement
June 2011
Garden decking with step down into garden, and a wooden side gate replacement
October 2008
50 sqm of elevated decking across 2 tiers, with steps down to garden.
February 2009
Two tier curved decking with roped newell posts.Steps down from french doors and back door.
February 2009
Landscape view of elevated curved softwood decking.Sloping featheredge fencing on left hand side
October 2008
Replaced 80ft of closeboard fencing after completing stunning new split level decked area.
February 2009
Landscape view of curved elevated decking.
February 2009
Split level decked area.Steps leading from french doors.
November 2010
Decking
Step 1 Secure timber foundation stilts
November 2010
Decking
Step 2 Fit weed barrier.
November 2010
Decking
Step 3 Secure joist timber to timber stilts.
November 2010
Decking
Step 4 Start fitting deck boards.
November 2010
Decking
Step 5 Complete laying deck boards and face off side and front with additional boards.
November 2010
Decking
Side view.
November 2010
Decking
Front view.
June 2010
Fitted new close board fencing with additional trellis work, and constructed new raised decked area
June 2010
Fitted new close board fencing with additional trellis work, and constructed new raised decked area
June 2010
Fitted new close board fencing with additional trellis work, and constructed new raised decked area
June 2010
Fitted new close board fencing with additional trellis work, and constructed new raised decked area
June 2010
Fitted new close board fencing with additional trellis work, and constructed new raised decked area
June 2010
First floor decking.
Replaced deck boards to first floor balcony.
June 2010
First floor decking.
Replaced deck boards to first floor balcony.
February 2009
Small decked area with handrail. Boxed in soil pipes.
February 2009
Side view of open plan decked area. Decked over existing patio.Stained with an oak colour finish
February 2009
First floor balcony decking
February 2009
Elevated decked area with steps down to garden.Decked over part existing patio and part lawn
March 2009
14ft x 8ft pergola designed and constructed to suit existing patio.
October 2010
Constructed pergola over existing concrete base
October 2010
Constructed pergola over existing concrete base.
February 2009
Pergola arch
September 2010
Childrens adventure playhouse
September 2010
Childrens adventure playhouse
Made to order, design, size, height, colour and features as required.
September 2010
Childrens adventure playhouse
Other designs upon request
December 2011
Constructed a childrens playhouse around an existing tree.
December 2011
Constructed a childrens playhouse
September 2009
Fitted new p.v.c composite front door into existing timber frame.
September 2009
internal view of p.v.c front door.
February 2009
Fitted new hardwood door frame, glazed side panel and oak front door
February 2009
Fitted oak door frame,glazed side panels and front door
August 2010
Fitted new oak front door
February 2009
Fitted new door frame to garage and hung extra wide hardwood door
February 2009
Relaced rotten timber around window and door frame. Fitted new porch door
October 2009
Supplied and fitted 3 external tongue and groove doors and repaired 3 door frames
September 2009
Replaced external frame,fitted new hardwood back door with mortice lock and security bolts.
August 2010
Replaced back door and threshold, repaired existing door frame
May 2009
Fitted 24 x 66 bespoke internal pine doors
June 2007
Replace 7 internal doors
October 2009
Supplied and fitted 3 internal doors
April 2013
Fitting four internal doors.
Oak doors with black ironmongery
March 2010
Fitted new timber frame with top panel and pair of oak bifold doors, finished with architrave
February 2009
Pine glazed double doors
January 2013
Fitted 16 solid oak internal doors including 2 pairs of double doors and new double door frame.
January 2013
Fitted 16 solid oak internal doors including 2 pairs of double doors and new double door frame.
January 2013
Fitted 16 solid oak internal doors including 2 pairs of double doors and new double door frame.
August 2009
Replaced Newel posts, spindles and hand rail on landing
March 2010
Replaced existing solid panelled landing balustrade, with new newel posts, handrail and turned spind
March 2010
Replaced existing solid panelled landing balustrade, with new newel posts, handrail and turned spind
March 2010
Fitted 30mm sound insulation tiles to party wall, sealed with acoustic sealant and finished with two
March 2010
Fitted 30mm sound insulation tiles to party wall, sealed with acoustic sealant and finished with two
August 2010
Removed black timber fascia boards, rerendered masonry, fitted and painted new timber boards black
August 2010
Removed black timber fascia boards, rerendered masonry, fitted and painted new timber boards black
August 2010
Removed black timber fascia boards, rerendered masonry, fitted and painted new timber boards black
August 2010
Removed black timber fascia boards, rerendered masonry, fitted and painted new timber boards black
August 2010
Removed black timber fascia boards, rerendered masonry, fitted and painted new timber boards black
February 2009
Cut away rotten timber of first floor bay window sill. Shaped and scarfed in new hardwood timber
February 2009
Cut away rotten section of window sill. Scarfed in new hardwood timber,ready for painting.
October 2009
Cut away rotten sections of existing garage door frame and replaced with new timber
October 2009
Cut away rotten sections of existing garage door frame and replaced with new timber
October 2009
Cut away rotten sections of existing garage door frame and replaced with new timber
February 2009
6ftx12ft apex shed
October 2010
Constructed hard standing area and built pre ordered 8ft X 6ft shed.
February 2009
Secret fixed oak tongue and groove boards to gable end of garage, edged with oak scotia
October 2011
Removed damaged stairwinder, shaped new kitetread and refitted existing staircase.
October 2011
Removed damaged stairwinder, shaped new kitetread and refitted existing staircase.
October 2011
Removed damaged stairwinder, shaped new kitetread and refitted existing staircase.
June 2012
Supplied twelve new concrete spurs to support failing fence posts.
June 2012
Supplied twelve new concrete spurs to support failing fence posts.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?