BEFORE
August 2012
Installation of Electric Central Heating Boiler
Old Powermax Gas Boiler
DURING
August 2012
Installation of Electric Central Heating Boiler
Powermax removed, pipework altered Slimjim electric installed
DURING
August 2012
Installation of Electric Central Heating Boiler
Unvented Hot Water Cylinder Installed via S plan controls
AFTER
August 2012
Installation of Electric Central Heating Boiler
Boiler Controls connected, system refilled commissioned
BEFORE
July 2012
Installation of a new electric boiler.
Existing Powermax Gas Boiler
DURING
July 2012
Installation of a new electric boiler.
Gas Boiler removed Electric System Boiler Installed
DURING
July 2012
Installation of a new electric boiler.
Unvented Hot Water Cylinder Installed via S plan controls
AFTER
July 2012
Installation of a new electric boiler.
Existing Radiators power flushed, pipe work lagged and system commissioned
DURING
July 2012
Relocation of fuse box from bedroom cupboard to hallway.
Extended Circuits to New Location in Hallway
DURING
July 2012
Relocation of fuse box from bedroom cupboard to hallway.
We used the existing consumer unit as a Junction Box
AFTER
July 2012
Relocation of fuse box from bedroom cupboard to hallway.
Existing Consumer Unit in Cupboard Retained
AFTER
July 2012
Relocation of fuse box from bedroom cupboard to hallway.
New Consumer Unit In Hallway, With RCBO Protection
BEFORE
April 2013
Replacement of boiler and hot water cylinder, installation of radiator valves and new central heatin
Old Keston System Boiler Unvented Cylinder
BEFORE
April 2013
Replacement of boiler and hot water cylinder, installation of radiator valves and new central heatin
Cylinder Damaged by Water Leaking back through Flue Boiler
DURING
April 2013
Replacement of boiler and hot water cylinder, installation of radiator valves and new central heatin
New Electric System Boiler Installed Pipework altered to suit new Cylinder
AFTER
April 2013
Replacement of boiler and hot water cylinder, installation of radiator valves and new central heatin
System powerflushed, new cylinder fitted, electrics connected tested pipework lagged
BEFORE
February 2013
Correction of submains cabling.
MICC with seal pulled off pots because of no mechanical protection
DURING
February 2013
Correction of submains cabling.
Old pot removed, new gland, pots seal installed
DURING
February 2013
Correction of submains cabling.
MICC terminated into metal enclosure 100A Isolator
AFTER
February 2013
Correction of submains cabling.
Correct termination for an MICC sub main cable
BEFORE
August 2012
Installation of pumped shower
Airing Cupboard Before Work Commenced
BEFORE
August 2012
Installation of pumped shower
Bathroom Before Work Commenced
AFTER
August 2012
Installation of pumped shower
Alteration of Pipework and Installation of Aqualisa Digital Unit
AFTER
August 2012
Installation of pumped shower
New Aqualisa Digital Pumped Shower Shower Screen
October 2011
LED Undercabinet Lighting
Lots of lights and no heat
BEFORE
January 2012
Installation of electric boiler to replace gas boiler
Remove old thermal store hot water cylinder gas boiler
DURING
January 2012
Installation of electric boiler to replace gas boiler
Old cylinder out new electric thermal store boiler ready to install
AFTER
January 2012
Installation of electric boiler to replace gas boiler
New electric thermal store boiler in place and connected
October 2012
Unvented Hot Water Cylinder
Installation of Unvented Hot Water Cylinder onto Electric Central Heating System
June 2012
Change fuse box, install electric shower and towel heater, fix electric heaters.
Twin impellar whole house pump
AFTER
June 2012
Change fuse box, install electric shower and towel heater, fix electric heaters.
Updated Consumer, with Electrical Installation Certificate
August 2012
Supply and Fit Thermal Boiler.
Installation of Electric Thermal Store Boiler, including removal of old unit, power flushing radiators and installation of Magnaclean
AFTER
January 2012
Installation of electric boiler to replace gas boiler
New digital timeclock and wireless digital programmable room thermostat
December 2011
Pumped Electric Shower
Low water pressure on third floor flat, Installed new cold water tank
December 2011
Pumped Electric Shower
New RCD protected consumer added
December 2011
Pumped Electric Shower
9.5kW Shower Installed
BEFORE
September 2011
Replaced faulty socket and fitted new RCBO
MK Consumer with RCD main switch, Earth fault on socket circuit tripping whole house
AFTER
October 2011
Replaced faulty socket and fitted new RCBO
Installed New consumer with individual RCBO circuit protection and corrected earth fault on socket circuit
October 2011
Dry electric heating
Digitally controlled electric convector heater
BEFORE
June 2011
Gas To Electric Boiler
Faulty Gas Boiler with concealed flues
BEFORE
July 2011
Gas To Electric Boiler
Central heating, hot and cold water and gas pipes
DURING
July 2011
Gas To Electric Boiler
Gas Boiler Removed, system power flushed and pipework cut back
AFTER
July 2011
Gas To Electric Boiler
Thermaflow Installed and pipework lagged
AFTER
July 2011
Gas To Electric Boiler
Additional consumer unit, Timeclock for the E10 Tariff and Wireless Room Stat
BEFORE
April 2011
Central Heating Improvements
Client had complained about radiators not heating up
DURING
April 2011
Central Heating Improvements
We power flushed all the radiators
DURING
April 2011
Central Heating Improvements
We stripped down the pipework and replaced the pump and motorised valves
AFTER
April 2011
Central Heating Improvements
We installed a more powerful pump, a Magnaclean unit and lagged the pipework to reduce heat loss
BEFORE
January 2011
Low Voltage Lighting Problems
The transformer and lampholders were failing and lamps were difficult to change
AFTER
January 2011
Low Voltage Lighting Problems
Changed Fittings and installed Daylight LED lamps
January 2011
Thermal storage wet central heating system
Loft mounted electric boiler
January 2011
Thermal storage wet central heating system
Duel heat source towel rail with wireless controls
January 2011
Thermal storage wet central heating system
Tall Aluminium Radiator with covered surface pipework
BEFORE
October 2010
Electric Wet central Heating
Cupbaord with existing hot water tank behind washing machine
DURING
October 2010
Electric Wet Central Heating
Replaced hot water tank with Thermal Storage Unit
BEFORE
October 2010
Shower installation
Fully tiled bathroom presented some challenges for a pumped shower installation
DURING
October 2010
Shower installation
We installed an Aqualisa Pumped Digital Mixer Shower under the bath
AFTER
October 2010
Shower installation
And the installation with no cracks or breakages of the tiles
BEFORE
May 2010
Shower Installation
Client lives in a flat with very little hot water pressure
AFTER
May 2010
Shower Installation
The pumped mixer unit is in the cupboard
AFTER
May 2010
Shower Installation
We installed an Aqualisa Pumped Digital Mixer Shower shower screen
BEFORE
August 2010
Fuse box replacement, cooker and attic light installation
Customers FuseBoard
AFTER
September 2010
Fuse box replacement, cooker and attic light installation
Replaced the old fuseboards with New RCBO consumer unit
AFTER
November 2009
Fitting of Electric Boiler and Heat Pump
Removed Gas Boiler, Installed Electric Boiler and Controls for Extrenal Heat Pump
AFTER
November 2009
Fitting of Electric Boiler and Heat Pump
External Heat Pump Unit
BEFORE
August 2009
Air Handling Control Cabinet
Old relays contactors were failing which caused client problems
AFTER
June 2010
Air Handling Control Cabinet
We replaced the relays, contactors, overlays and fuses
BEFORE
April 2010
General work.
Before Upgrading Electrics in Office
AFTER
May 2010
General work.
Installation of Dado Trunking Sockets
BEFORE
March 2010
Installation of pump on hot water system
Gravity Fed Hot Water System
AFTER
March 2010
Installation of pump on hot water system
Pumped Hot Water System
BEFORE
March 2010
An electrical safety report and new fuse box.
Rewireable Fuseboard
AFTER
March 2010
An electrical safety report and new fuse box.
17th Edition Fuse Board with Individual RCD Protection
BEFORE
February 2010
Installation of Electric boiler and hot water tank
Failing Gas Boiler
AFTER
March 2010
Installation of Electric boiler and hot water tank
Installation of Electric Boiler Unvented Hot Water Cylinder
BEFORE
November 2009
Installation of Electric Central heating
Airing cupboard with old controls and leaking hot water tank
AFTER
November 2009
Installation of Electric Central heating
New Electric Boiler, controls and hot water tank
AFTER
November 2009
Installation of Electric Central heating
Compact Electric Boiler and controls easily accessible
BEFORE
October 2009
Shower Installation BEFORE
Client is on 3rd floor with no pressure to run electric shower
BEFORE
November 2009
Very small cold water tank
The client has a very small water tank and no loft to place a larger one
AFTER
November 2009
New Aqualisa Digitally Pumped Shower
We removed the old shower, installed new pipe work and replaced tiles damaged by other shower installation
AFTER
November 2009
Upgraded airing cupboard
We installed a 50 gallon cold water tank and the digital pump, so the client can now have a 20 min power shower
July 2010
House rewire
New Consumer Unit with Individual RCBO Circuit Protection