Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
JSP Installations
32
work photos
My Profile
Page
My Customer
Feedback
My Photos
My Videos
AFTER
November 2009
island sink and range
BEFORE
September 2010
pipe runs new boiler kitchen start after stripping old units
benchmarx kitchen installation
DURING
September 2010
units fitting start
AFTER
July 2011
completed kitchen tilling lighting boiler decorated to high standard
fully integrated benchmarx gloss kitchen complete referb
BEFORE
March 2012
New kitchen fitted, tiled and painted, and understair cupboard.
out goes the impractical layout awkward use of space
DURING
March 2012
New kitchen fitted, tiled and painted, and understair cupboard.
empty room ready for new boiler,kitchen,and opening of understairs cupboard
DURING
September 2010
units all installed tilling in progress
75 complete job
BEFORE
April 2012
garage roof. water penatration problems to shed below plus structual rot to garage roof
old roof with rotten facia and structure below
DURING
April 2012
Renewed garage roof.
rotten timber replaced back end face
AFTER
April 2012
Renewed garage roof.
rear end completed with edge trims new facias and gutter re fixed
AFTER
July 2011
old floor mounted boiler cupboard now integrated fridge custom job
maximum usage of available space
AFTER
July 2011
tucking appiances into sensible locations stremlining work areas
finished job integrated applince and new wall boiler in unit
DURING
March 2012
New kitchen fitted, tiled and painted, and understair cupboard.
new condensing boiler in wall unit tops and sink on tilling next
DURING
March 2012
New kitchen fitted, tiled and painted, and understair cupboard.
serving hatched closed and plasterd units fitted
BEFORE
March 2012
New kitchen fitted, tiled and painted, and understair cupboard.
goodbye to seventies serving hatch and dark tiled worktoptop
DURING
March 2012
New kitchen fitted, tiled and painted, and understair cupboard.
walls made good units fitted, new boiler next stage
AFTER
October 2010
maximising availble storage in design
easy work task improved layout of storage and appliances
DURING
March 2012
New kitchen fitted, tiled and painted, and understair cupboard.
AFTER
April 2012
Renewed garage roof.
completed epdm rubber garage roof with greenhouse view to rear end
DURING
April 2012
Renewed garage roof.
new osb boards installed epdm material being applied
AFTER
October 2010
boiler new posistion from floor in cupboard to wall hiddenin unit
custom boiler on end of wall run
DURING
January 2011
main bathroom during install stone tilling diverter valve
new bathroom mid way of fit
AFTER
February 2011
quartz divertor shower lv contoler stone tiles screen
finished bathroom natural travertine tiles
AFTER
February 2011
floating wall toilet
mosaic and stone custom unit
AFTER
February 2011
travetine stone floating gerberit toilet custom unit
fully tiled bath and wallsglass screen side bath filler
BEFORE
May 2011
original kitchen
before work
BEFORE
May 2011
caos no simplicty in need of modernising
old kitchen
AFTER
June 2011
new simple work area all stream lined efficiant use of space good lighting
benchmarx soho range wood laminate tops fresh tiles
AFTER
May 2011
finished a small spaced max efficency easy to manage
sink dishwasher laundry and clean lines
AFTER
June 2011
plenty of workspace
finished tilling maximising from old clutter corner
AFTER
March 2010
retile revamp bathroom
AFTER
August 2009
brick style porcelain tiles and basin
bathroom
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?