Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Kingsland Floors
84
photos of recent work
My Profile
My Feedback (381)
My Photos (84)
BEFORE
March 2013
Vinyl Before
Vinyl Before
AFTER
March 2013
Vinyl after
Vinyl after
BEFORE
February 2013
A box room
AFTER
February 2013
This a box room once completed
BEFORE
February 2013
A meeting room
This was the floor before we brought the carpet in
DURING
February 2013
This is Joe, glueing the Carpet all over for this meeting room
AFTER
February 2013
The meeting room once completed
BEFORE
February 2013
This is a bathroom we got prepared for a vinyl to be fitted
AFTER
February 2013
This is the bathroom when completed
BEFORE
February 2013
This is a small room ready for a felt back carpet to be fitted
AFTER
February 2013
This is a small room with felt back carpet to be fitted
BEFORE
February 2013
A large open lounge ready for a thick piled carpet to be fitted
AFTER
February 2013
A large lounge with a thick piled carpet fitted
BEFORE
February 2013
A medium sized room in Bournemouth
DURING
February 2013
Preparing the floor for the Carpet
AFTER
February 2013
The room when completed
BEFORE
March 2013
Carpets fitted to 3 x bedrooms landings and stairs.
Box room before
AFTER
March 2013
Carpets fitted to 3 x bedrooms landings and stairs.
Box room after
BEFORE
March 2013
Carpets fitted to 3 x bedrooms landings and stairs.
Main room before
AFTER
March 2013
Carpets fitted to 3 x bedrooms landings and stairs.
Main room after
AFTER
March 2013
Carpets fitted to 3 x bedrooms landings and stairs.
BEFORE
March 2013
Carpets fitted to 3 x bedrooms landings and stairs.
Flight of stairs before
AFTER
March 2013
Carpets fitted to 3 x bedrooms landings and stairs.
Flight of stairs after
BEFORE
March 2013
Carpets fitted to 3 x bedrooms landings and stairs.
Landing before
AFTER
March 2013
Carpets fitted to 3 x bedrooms landings and stairs.
The landing after
BEFORE
February 2013
A small lounge
AFTER
February 2013
A small lounge after
BEFORE
January 2013
A kitchen before
AFTER
January 2013
A kitchen after with blue Contract vinyl
BEFORE
March 2013
New bathroom flooring.
This is the bathrooom before
AFTER
March 2013
New bathroom flooring.
Bathroom after
BEFORE
March 2013
New bathroom flooring.
This is the bathrooom before
AFTER
March 2013
New bathroom flooring.
This is the bathrooom after
BEFORE
March 2013
My flat was completely carpeted.
The Box room before
DURING
March 2013
My flat was completely carpeted.
Box room during
AFTER
March 2013
My flat was completely carpeted.
The box room after
BEFORE
March 2013
My flat was completely carpeted.
The hall before
DURING
March 2013
My flat was completely carpeted.
The hall during
AFTER
March 2013
My flat was completely carpeted.
The hall after
BEFORE
March 2013
My flat was completely carpeted.
The lounge before
DURING
March 2013
My flat was completely carpeted.
AFTER
March 2013
My flat was completely carpeted.
The lounge after
BEFORE
March 2013
My flat was completely carpeted.
The biggest bedroom before
DURING
March 2013
My flat was completely carpeted.
The biggest bedroom during
DURING
March 2013
My flat was completely carpeted.
The biggest bedroom during
AFTER
March 2013
My flat was completely carpeted.
The biggest bedroom after
AFTER
February 2013
This is a tile effect vinyl we supplied and fitted
Bathroom before the sink and toilet were installed
BEFORE
March 2013
Room to do in Bournemouth hotel
Before
BEFORE
March 2013
Room to do in Bournemouth hotel
Before
BEFORE
March 2013
Room to do in Bournemouth hotel
Before
DURING
March 2013
Room to do in Bournemouth hotel
During
DURING
March 2013
Room to do in Bournemouth hotel
During
AFTER
March 2013
Room to do in Bournemouth hotel
After
AFTER
March 2013
Room to do in Bournemouth hotel
After
AFTER
March 2013
Room to do in Bournemouth hotel
After
AFTER
March 2013
Room to do in Bournemouth hotel
After
BEFORE
March 2013
Replacing living room carpet.
The lounge before
DURING
March 2013
Replacing living room carpet.
During
AFTER
March 2013
Replacing living room carpet.
The lounge after
BEFORE
March 2013
Replacing living room carpet.
The lounge before
AFTER
March 2013
Replacing living room carpet.
The lounge after
BEFORE
October 2008
Carpet fitted throughout flat.
Before fitting
AFTER
October 2008
Carpet fitted throughout flat.
After Fitting
AFTER
October 2008
Carpet fitted throughout flat.
After Fitting
December 2008
Vinyl fitted in kitchen Tile and silver grout effect
Floor leveled with a concrete screed mix before fitting
December 2008
Carpet fitted in the lounge
Prestige twist carpet chocolate
December 2008
Light beige carpet fitted in a lounge
Felt back carpet fitted to the floor
December 2008
Carpet Fitted in whole flat
Carpet fitted with a 9mm sound insulative underlay
December 2008
Landings
Hall stairs and landings
December 2008
Lounge area in old cottage
December 2008
Open plan staircase
November 2008
Carpet Fitted in 2 bedrooms and open plan staircase
Looking Down from the loft room
December 2008
Stairs tailored
April 2009
1 Bed Flat Rental
Gala Carpet and Vinyl Fitted
April 2009
1 Bed Flat Rental
Gala Carpet and Vinyl Fitted
October 2008
Berber carpet in lounge with join
Carpet Fitted with join
October 2008
Carpet hall, stairs and living room.
After Fitting
April 2009
Felt back Bolero carpet on stairs
Fitted with adhesive to stairs
April 2009
2 Bed Flat Rental
Flat fitted for a letting agency
April 2009
2 Bed Flat Rental
Flat fitted for a letting agency
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?