Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
L T Carpentry & Building Services
174
work photos
My Profile
Page
My Customer
Feedback
My Photos
December 2008
Swedish Energy Saving Timber Framed House. Work by L T Carpentry & Building Services
All carpentry works to this property in Horsted Keyns
March 2009
Theatre Entrance Private School. Work by L T Carpentry & Building Services
Wealsoconstructedtheauditoriumseatingarea, fittedfiredoorsandcarriedoutvariouscarpentryworkstoaveryhighstandard.
AFTER
March 2012
Wall removed, kitchen install, cupboards and tiling and much more
kitchen in brighton and hove
AFTER
March 2012
Wall removed, kitchen install, cupboards and tiling and much more
kitchen in brighton and hove
AFTER
September 2011
Kitchen conversion, extension built. Kitchen and utility room refit.
wall removal and kitchen fitting brighton
December 2009
Kitchen refit
Work by L T Carpentry & Building Services
BEFORE
March 2010
Kitchen refurbishment
Work by L T Carpentry & Building Services
AFTER
March 2010
Kitchen refurbishment
Work by L T Carpentry & Building Services
DURING
March 2012
Soundproofed bedroom and fitted bespoke oak furniture
bespoke furniture in brighton
April 2009
ConservatoryRenovation. Work by L T Carpentry & Building Services
Here we renovated this conservatory and replaced all the single pain glass for double glazed glass. We also carried out extensive repairs to the base which had wet rot.
BEFORE
August 2009
The Old Pottery
Here we cut an opening in a room above an office and designed and constructed a new staircase and landing.
July 2009
The Old Pottery
Work by L T Carpentry & Building Services
AFTER
March 2012
Building cupboard and wardrobe
Building cupboards in fulking
BEFORE
March 2012
Building cupboard and wardrobe
Cupboards in fulking
AFTER
March 2012
Install utility room.
kitchen installation and decoration in Fulking
AFTER
March 2012
Install utility room.
DURING
March 2012
Install utility room.
Kitchen installation in Fulking
AFTER
April 2012
Install custom alcove cupboards.
bespoke alcove cupboards in burgess hill
AFTER
April 2012
Install custom alcove cupboards.
bespoke alcove cupboards in burgess hill
DURING
April 2012
Install custom alcove cupboards.
bespoke alcove cupboards in burgess hill
DURING
April 2012
Install custom alcove cupboards.
bespoke alcove cupboards in burgess hill
DURING
April 2012
Install custom alcove cupboards.
bespoke alcove cupboards in burgess hill
AFTER
August 2009
The old pottery
Work by L T Carpentry & Building Services
March 2009
Door locks and handle set. Work by L T Carpentry & Building Services
A show flat kitted out in Eastbourne with very expensive doors and fittings and installed with the highest standard workmanship.
BEFORE
June 2009
Solid oak flooring and decorate throughout. Work by L T Carpentry & Building Services
A flat in Brighton purchased by a previous client which required a complete decoration throughout and a quality solid oak flooring laid onto a foam underlay.
June 2009
Solid oak flooring and decorate throughout
View after flooring has been laid. Work by L T Carpentry & Building Services
DURING
March 2012
Soundproofed bedroom and fitted bespoke oak furniture
soundproofing in brighton
DURING
March 2012
Soundproofed bedroom and fitted bespoke oak furniture
sound proofing, decorating and plastering in brighton
DURING
March 2012
Soundproofed bedroom and fitted bespoke oak furniture
bespoke furniture brighton
DURING
March 2012
Soundproofed bedroom and fitted bespoke oak furniture
bespoke furniture in brighton
AFTER
February 2012
Gas meter cupboard
cupboard in brighton
AFTER
March 2012
Wall removed, kitchen install, cupboards and tiling and much more
tiling and underfloor heating in brighton and hove
DURING
March 2012
Wall removed, kitchen install, cupboards and tiling and much more
underfloor heating in brighton and hove
DURING
March 2012
Wall removed, kitchen install, cupboards and tiling and much more
BEFORE
March 2012
Wall removed, kitchen install, cupboards and tiling and much more
kitchen in brighton and hove
DURING
March 2012
Wall removed, kitchen install, cupboards and tiling and much more
Kitchen extension in Brighton and Hove
AFTER
January 2012
Bedroom door
internal door and digilock in brighton
BEFORE
January 2012
Storage cupboards built and general building maintenance works.
cupboard storage brighton
AFTER
January 2012
Storage cupboards built and general building maintenance works.
cupboard storage in brighton
AFTER
January 2012
Build a porch to front of house.
Porch extension in brighton
DURING
January 2012
Build a porch to front of house.
Porch extension in brighton
DURING
January 2012
Renovation of lounge and fitting of sliding doors
AFTER
January 2012
Renovation of lounge and fitting of sliding doors
AFTER
January 2012
Fit new bath surround and paint
AFTER
December 2011
Remodelling garage.
Work by L T Carpentry & Building Services
BEFORE
December 2011
Remodelling garage.
Work by L T Carpentry & Building Services
AFTER
December 2011
Remodelling garage.
Work by L T Carpentry & Building Services
BEFORE
December 2011
Remodelling garage.
Work by L T Carpentry & Building Services
BEFORE
December 2011
Remodelling garage.
Work by L T Carpentry & Building Services
BEFORE
December 2011
Remodelling garage.
Work by L T Carpentry & Building Services
AFTER
December 2011
Remodelling garage.
Work by L T Carpentry & Building Services
BEFORE
December 2011
Remodelling garage.
Work by L T Carpentry & Building Services
AFTER
December 2011
New front door and frame fitted.
Work by L T Carpentry & Building Services
BEFORE
December 2011
New front door and frame fitted.
Work by L T Carpentry & Building Services
AFTER
December 2011
Cabinets in lounge and shelving.
Work by L T Carpentry & Building Services
AFTER
December 2011
Cabinets in lounge and shelving.
Work by L T Carpentry & Building Services
AFTER
December 2011
Cabinets in lounge and shelving.
DURING
December 2011
Cabinets in lounge and shelving.
DURING
December 2011
Cabinets in lounge and shelving.
DURING
December 2011
Cabinets in lounge and shelving.
AFTER
December 2011
complete kitchen renovation
AFTER
June 2011
Tiling of bathroom
AFTER
June 2011
Tiling of bathroom
AFTER
July 2011
Replacing door and window.
DURING
July 2011
Replacing door and window.
BEFORE
July 2011
Replacing door and window.
BEFORE
April 2011
Replacing stair treads.
AFTER
April 2011
Replacing stair treads.
April 2011
Replacing stair treads.
DURING
April 2011
Oak front door, frame
DURING
April 2011
Oak front door, frame
BEFORE
April 2011
Oak front door, frame
BEFORE
May 2011
Banister repairing.
DURING
May 2011
Banister repairing.
AFTER
May 2011
Banister repairing.
AFTER
June 2011
Bay window restoration
AFTER
June 2011
Bay window restoration
BEFORE
June 2011
Bay window restoration
DURING
March 2011
Clearing a wild, overgrown garden and turning into a parklike lawned area.
DURING
March 2011
Clearing a wild, overgrown garden and turning into a parklike lawned area.
BEFORE
March 2011
Clearing a wild, overgrown garden and turning into a parklike lawned area.
AFTER
February 2011
Emergency repair to stairs.
BEFORE
February 2011
Emergency repair to stairs.
collapsed steps
DURING
February 2011
Emergency repair to stairs.
Collapsed stairs
AFTER
January 2011
Additional fencing.
AFTER
November 2010
New gate, posts and door, furniture including decor
AFTER
November 2010
New gate, posts and door, furniture including decor
AFTER
January 2011
Very good, fitted new back door of frame.
AFTER
January 2011
Very good, fitted new back door of frame.
AFTER
June 2009
Solid oak flooring and decorate throughout
Flooring complete with solid oak beading, decorated throughout and clients furniture back in place.
January 2009
Continuous handrail.
Here at a private school in Horsted Keynes a continuous handrail was required for students to use. A standard mopstick handrail was cut to all angles required and fitted where requested.
March 2009
Decking
At this address in Woodingdean we built the decking over a grass bank and repositioned the tree from another part of the garden to act as the main feature to the new decking.
July 2009
Complete bathroom
At this clients house we rejuvenated a small bathroom with a new bathroom suite and tiled the floor and walls.
February 2009
Decking, Fascia and soffits, doulble french doors and windows.
In this picture we installed pretty much everything that is to be seen. There are two sets of double french doors which lead to the decking from the kitchen and the living room. All windows were then installed finishing with ship lapped fascia and soffits.
BEFORE
September 2008
Flooring
This was laid by ltcarpentry and building services to a sports hall in Shoreham. It was a hard durable surface complete with a accoustic underlay.
AFTER
September 2008
Flooring
This was the sports hall when all completed.
October 2009
Roofing
This roof was built over an existing roof and part of the new extension causing minimal disruption
October 2009
Roofing continued
September 2009
Roofing
September 2009
Roofing
BEFORE
November 2009
Front door
Door had much rot located at base of door and many splits on front
AFTER
November 2009
Front door
Once the door had been filled, a new cill installed and rot removed and made good this is finished article once decorated.
October 2009
Fitting new front door
October 2009
Repairs to staircase and replacing spindles
October 2009
Repairs to staircase and replacing spindles
September 2009
Roofing
September 2009
Roofing
BEFORE
March 2010
Tiled flooring and laminate flooring
Client had squeaky chipboard flooring which was fitted down incorrectly, once screwed down WBP ply was ladis and fixed on top.
AFTER
March 2010
Tiled flooring and laminate flooring
After ply had been screwed down to chipboard flooring, laminate underlay was layed followed by oak style laminate complete with skirting.
BEFORE
March 2010
Tiled flooring and laminate flooring
AFTER
March 2010
Tiled flooring and laminate flooring
July 2008
Show Flat In Eastbourne
We carried out all carpentry works to these flats
December 2009
Kitchen refit
December 2009
Kitchen refit
AFTER
March 2010
Skirting and boxing.
AFTER
March 2010
Skirting and boxing.
BEFORE
March 2010
Carpentry.
BEFORE
March 2010
Carpentry.
AFTER
March 2010
Carpentry.
AFTER
March 2010
Carpentry.
AFTER
March 2010
Flooring
AFTER
March 2010
Flooring
AFTER
March 2010
Flooring
March 2010
Kitchen refurbishment
AFTER
March 2010
Kitchen refurbishment
December 2008
Truss Roof Haywards Heath
AFTER
March 2010
Kitchen refurbishment
AFTER
September 2010
Installation of new bathroom and decoration.
AFTER
October 2010
Constructed cupboards and installed utility room.
BEFORE
October 2010
Constructed cupboards and installed utility room.
September 2010
Installation of new bathroom and decoration.
September 2010
Installation of new bathroom and decoration.
September 2010
Fitting guttering, gutter guard, water butt and bathroom fittings.
September 2010
Fitting guttering, gutter guard, water butt and bathroom fittings.
September 2010
Fitting guttering, gutter guard, water butt and bathroom fittings.
September 2010
Fitting guttering, gutter guard, water butt and bathroom fittings.
October 2010
Replastering, fitting new cupboards, repairs and redecoration.
October 2010
Replastering, fitting new cupboards, repairs and redecoration.
October 2010
Replastering, fitting new cupboards, repairs and redecoration.
October 2010
Fitting kitchen work top.
October 2010
Fitting kitchen work top.
AFTER
September 2010
New wooden floor x2 new wooden windows
AFTER
September 2010
New wooden floor x2 new wooden windows
AFTER
September 2010
New wooden floor x2 new wooden windows
AFTER
September 2010
Fitting door and shelving.
AFTER
September 2010
Fitting door and shelving.
BEFORE
August 2010
Building a large verandah.
August 2010
Banisters.
August 2010
Banisters.
August 2010
Banisters.
AFTER
August 2010
Building a large verandah.
AFTER
August 2010
Building a large verandah.
AFTER
June 2010
Wooden porch rebuilt.
BEFORE
June 2010
Wooden porch rebuilt.
BEFORE
June 2010
Wooden porch rebuilt.
AFTER
June 2010
Carpentry and building.
BEFORE
June 2010
Carpentry and building.
AFTER
May 2010
Cupboards built in bathroom.
AFTER
May 2010
Cupboards built in bathroom.
May 2010
Cupboards built in bathroom.
BEFORE
May 2010
Cupboards built in bathroom.
AFTER
June 2010
Extension repair work.
June 2010
Extension repair work.
New timber rails were installed and all making good was carried out ready for decoration.
BEFORE
June 2010
Extension repair work.
The complete external face of this porch extension was totally rotten and had to be removed. After removing all rotten wood we then treated with 5 rot treatment and started rebuilding.
AFTER
July 2010
Fitted skirting, cornice, plinths and made shelves for kitchen.
AFTER
July 2010
Fitted skirting, cornice, plinths and made shelves for kitchen.
AFTER
July 2010
Carpentry.
AFTER
July 2010
Carpentry.
Various standard doors to the same property were changed to luxury glazed oak doors which were finished with a bee wax creating a high standard finish.
AFTER
July 2010
Carpentry.
AFTER
July 2010
Carpentry.
A metal frame was removed from this staircase and a full height wooden one was installed with routered edges to accomodate the staircase much more than original.
May 2010
Install new timber double glazed windows.
May 2010
Install new timber double glazed windows.
May 2010
Install new timber double glazed windows.
AFTER
April 2010
Build floating style corner desk.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?