Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
L W L Heating
40
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
May 2011
Keston Boiler
Original Boiler fitted by others and never serviced in Eight Years Requiring replacing
DURING
May 2011
Dyke Road Boilers during install
Mr Goldsmith had asked about the possibility of having two boilers in Tandem
AFTER
May 2011
Boilers Connected using a reverse return pipework configuration.
Magnaclean Units fitted to each boiler for additional protection
AFTER
May 2011
Potterton Boilers in Tandem
Two Potterton Promax 30 SL Condensing boilers were specified.System pressure tested and converted to a Sealed System
AFTER
May 2011
Wiring of Boilers in Tandem
System wired with separate pump control via relay. Controls incorporating 3x Zone Valves,Frost Stat with Return pipe stat and Flow Pipe stat to control pump overrun.
AFTER
May 2011
Dyke Road Flues
Boilers fitted with Plume Management kits for correct Plume Displacement
DURING
April 2011
POOL FILTER PLANT
Installation of Pool Plant pipework prior to fitting new Pool Boiler
AFTER
April 2011
POOL FILTER PLANT
Swiming Pool Boiler interrnals
AFTER
April 2011
Pool Boiler completed
Nice Heated Swimming Pool in Roedean
DURING
February 2011
Dry Riser Testing
Carrying out air testing of Dry Riser at block of Flats in Brighton
AFTER
March 2011
GAS FIRE
Installation of Gas Fire replacement in Withdean Area
AFTER
April 2011
Condensing Boiler Installation
Installation of Condensing Boiler and extensive system upgrade. Pipework was lagged after photo taken
BEFORE
March 2011
BODGE DIY
The customer actually PAID someone to do this and who had the audacity to take payment Connected with flexi tap connectors not designed for high temp heating operation they would have eventually burst and could have seriously scalded someone. Unbelieveable that they get away with such atrocious work.
AFTER
April 2011
Garage Boiler pipework
Installation at my house for underfloor circuits serving new extension. Used Worcester 12ri boiler converted from LPG to Natural Gas and sealed system,
AFTER
April 2011
Garage Boiler pipework
second photo
AFTER
February 2011
Oil Boiler Flue
High Level Condensing Oil Boiler Flue to safe terminal discharge
BEFORE
November 2010
Tenants Bodge Job
After running out of oil the tenant had discoinnected the supply and attempted to get the boiler going himself ,,But not bery successfull
BEFORE
August 2011
Pool Boiler Heat Exchanger
Lack of Service and Maintenance
BEFORE
August 2011
Swimming Pool Boiler Herstmonceux Sussex
This Pooll Boiler was leaking from the heat exchanger possibly due to frost damage in winter
AFTER
August 2011
Installation of New Teledyne Laars Swimming Pool Boiler
Client supplied appliance which was fitted by LWL and Pool Heating was quickly restored to the delight of Customer and Family in readiness for Weekend Pool Party
DURING
July 2011
Installation of Grant External Oil Fired Combination Boiler
Relocation and system upgrade works for Client in Hailsham
DURING
July 2011
Installation of Grant External Oil Fired Combination Boiler
Relocation and system upgrade works for Client in Hailsham
DURING
July 2011
Installation of Grant External Oil Fired Combination Boiler
Relocation and system upgrade works for Client in Hailsham
BEFORE
December 2010
Oil Pipe and Tigerloop air in fuel line problems
See previous AFTER photo
AFTER
February 2011
OIL LINE INSTALLATION
Upgrade and renewal of Oil line and tiger loop to boiler
BEFORE
May 2011
Vaillant LPG DIY
BEFORE
May 2011
LPG DIY changeover removed
BEFORE
May 2011
Vaillant DIY Pipework to LPG Heater
BEFORE
May 2011
Vaillant Water Heater flue DIY
AFTER
May 2011
Vaillant LPG Combi Installed after
AFTER
May 2011
Vaillant LPG Combi install
AFTER
May 2011
New LPG piopework ready for bottles
AFTER
May 2011
Wiring Diagram amended
Permanent live conn to boilers not available so alternative revised wiring diagram to incorporate pump over run facility.
DURING
October 2010
UFloor heating
My House Bevendean
DURING
October 2010
UFloor heating install
At my house
DURING
October 2010
Polypipe Overlay Underrfloor
Works at my own House Underfloor Heating
DURING
October 2010
UFloor heating install
My House Pic shows latex floor prior to ply cover and Karndean
AFTER
February 2011
UFloor heating install
My Houise and the finished floor complete after ufloor heating install and works completion
AFTER
June 2010
POOL BOILER REPLACEMENT UPGRADE
We fitted this condensing boiler about four years ago which replaced a not very efficient Pool Boiler.Also fitted separate heat exchanger unit and controls . My Customer said on last service visit that his gas consumption for pool heeating has been halved
AFTER
April 2011
My Son Lloyd
A bit of light relief here as bad day for Lloyd who loses his head Literally
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?