Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Lamadoss Design and Build
205
photos of recent work
My Profile
My Feedback (52)
My Photos (205)
DURING
March 2011
project 15
1st lift
DURING
March 2011
Project 15
Kitchen Back Wall
DURING
March 2011
project 15
footings
AFTER
March 2011
Project 15
OutsideRear House Exstention/patio
AFTER
March 2011
Project 15
Kitchen
AFTER
March 2011
Project 15
Study
AFTER
March 2011
Project 15
Kitchen Side View
AFTER
March 2011
project 15
study with balcony
AFTER
March 2011
Project 15
New Driveway and Brick Pier Entrance
DURING
September 2012
Outside wall house painting.
during repair work
DURING
September 2012
Outside wall house painting.
during repair work
DURING
September 2012
Outside wall house painting.
dureing repair work
AFTER
October 2012
Utility, tiling and laying floor, fitting skirting
AFTER
June 2012
Garage conversion
AFTER
October 2012
Utility, tiling and laying floor, fitting skirting
AFTER
October 2012
Utility, tiling and laying floor, fitting skirting
AFTER
October 2012
Utility, tiling and laying floor, fitting skirting
AFTER
March 2013
Built front step to a lower level.
AFTER
March 2013
Extended outbuilding, to be able to park motor scooter more easy.
AFTER
November 2012
Design and construct canopy over front door.
DURING
March 2013
Built front step to a lower level.
November 2012
Large two story side and rear extension
first stage footings
DURING
November 2012
Large two story side and rear extension
first stage
DURING
November 2012
Large two story side and rear extension
first stage
DURING
November 2012
Large two story side and rear extension
second stage garage
DURING
March 2013
New windows
first stage footings
DURING
November 2012
Large two story side and rear extension
back extension shell
DURING
November 2012
Large two story side and rear extension
back extension shell
DURING
November 2012
Large two story side and rear extension
first stage
DURING
November 2012
Large two story side and rear extension
garage shell
DURING
November 2012
Large two story side and rear extension
second stage
DURING
November 2012
Large two story side and rear extension
second stage backj extension
DURING
November 2012
Large two story side and rear extension
secon stage of shell
DURING
November 2012
Large two story side and rear extension
second stage first lift
DURING
November 2012
Large two story side and rear extension
start of roof stucture
DURING
November 2012
Large two story side and rear extension
front of extensionand garage
DURING
November 2012
Large two story side and rear extension
DURING
August 2012
Single dorma.
DURING
August 2012
Single dorma.
DURING
September 2012
Outside wall house painting.
during repair wrk
AFTER
September 2012
Outside wall house painting.
cracks repaired and repainted
AFTER
September 2012
Outside wall house painting.
cracks repaired and repainted on front
AFTER
September 2012
Outside wall house painting.
outside cracks repaired and repainted
AFTER
September 2012
Outside wall house painting.
outside refilled and painted over
DURING
October 2012
Removal of chimney and interior wall installation of new kitchen.
taken out old kitchen ready for replaster
DURING
October 2012
Removal of chimney and interior wall installation of new kitchen.
rip out and replaster
AFTER
October 2012
Removal of chimney and interior wall installation of new kitchen.
finished kitchen
DURING
July 2012
Double dormer extension.
DURING
July 2012
Double dormer extension.
DURING
July 2012
Double dormer extension.
the shell of dorma
DURING
July 2012
Double dormer extension.
insulating of dorma
DURING
July 2012
Double dormer extension.
insulating bedrooms
DURING
July 2012
Double dormer extension.
out side
AFTER
July 2012
Double dormer extension.
finished dorma
AFTER
July 2012
Double dormer extension.
finished dorma
AFTER
July 2012
Double dormer extension.
bedroom 2
AFTER
July 2012
Double dormer extension.
bedroom 2
AFTER
July 2012
Double dormer extension.
bedroom one
AFTER
July 2012
Double dormer extension.
other end of hallway
AFTER
July 2012
Double dormer extension.
hallway
AFTER
July 2012
Double dormer extension.
one of the bedrooms
AFTER
July 2012
Double dormer extension.
extra space for single bed over stairs
AFTER
July 2012
Double dormer extension.
wardrobe space in bedroom
BEFORE
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
remove garage
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
removing garage
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
start of roof
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
start of roof
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
foundations
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
oversite
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
installing steels and pad stones
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
ground floor blockwork
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
oversite start of brickwork
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
building foundations
DURING
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
start of gable ends
AFTER
August 2012
Kitchen, garage, porch and downstairs cloak room single storey extension.
exterior shell complete
AFTER
June 2012
Property refurbish
bedroom
AFTER
June 2012
Property refurbish
front room
AFTER
June 2012
Property refurbish
bathroom
AFTER
June 2012
Property refurbish
bedroom
AFTER
June 2012
Property refurbish
kitchen
AFTER
June 2012
Property refurbish
DURING
September 2012
Very polite and prompt service.
AFTER
September 2012
Very polite and prompt service.
AFTER
September 2012
Very polite and prompt service.
AFTER
September 2012
Porch
AFTER
September 2012
Porch
BEFORE
June 2012
Garage conversion
day one
DURING
June 2012
Garage conversion
garage door way with window
AFTER
June 2012
Garage conversion
new bedroom
AFTER
June 2012
Garage conversion
BEFORE
June 2012
To build an internal bedroom with en suite bathroom.
old ensuite
DURING
June 2012
To build an internal bedroom with en suite bathroom.
new ensuite wall
DURING
June 2012
To build an internal bedroom with en suite bathroom.
new ensuite wall
DURING
June 2012
To build an internal bedroom with en suite bathroom.
built new wardrobe
DURING
June 2012
To build an internal bedroom with en suite bathroom.
puttin in new steel
DURING
June 2012
To build an internal bedroom with en suite bathroom.
new doorway into new ensuite
DURING
June 2012
To build an internal bedroom with en suite bathroom.
cutting in new door way
DURING
June 2012
To build an internal bedroom with en suite bathroom.
exposing wall
DURING
June 2012
To build an internal bedroom with en suite bathroom.
stud wall for ensuite
AFTER
June 2012
To build an internal bedroom with en suite bathroom.
new ensuite
AFTER
June 2012
To build an internal bedroom with en suite bathroom.
new shower
AFTER
June 2012
To build an internal bedroom with en suite bathroom.
new ensuite wall decorated
AFTER
June 2012
To build an internal bedroom with en suite bathroom.
new door way into ensuite
AFTER
June 2012
To build an internal bedroom with en suite bathroom.
new ensuite
AFTER
June 2012
To build an internal bedroom with en suite bathroom.
new bedroom
AFTER
June 2012
to build shed
shed
AFTER
June 2012
To build a shed/leanto
shed supported on 3x3 posts
DURING
May 2012
farnham common
games room tool shed
DURING
May 2012
farnham common
games room tool shed
DURING
May 2012
farnham common
shed section
DURING
May 2012
farnham common
games room tool shed
DURING
May 2012
farnham common
gamesroom section
AFTER
May 2012
farnham common
games room shed
AFTER
May 2012
farnham common
games room shed
AFTER
January 2012
project 11
porch extension at front of house
AFTER
February 2012
project 18
Refurbish bedroom,plastering,painting,constructfitted desktop
AFTER
February 2012
project 18
replaster,repaint and buildnew desk in box room
BEFORE
January 2012
loft conversion
converted playroom
BEFORE
January 2012
loft conversioin
converted into playroom
DURING
January 2012
loft conversion
coverted playroom
DURING
January 2012
loft conversion
converted playroom
DURING
January 2012
loft conversion
stairs up to play room built in box room
AFTER
January 2012
loft conversion
stairs leading up to playroom
AFTER
January 2012
loft conversion
kids playroom
AFTER
January 2012
loft conversion
stairs leading to playroom
AFTER
January 2012
loft conversion
stairs leading up to playroom
AFTER
January 2012
loft conversion
kids playroom
AFTER
July 2011
Converting part of the roof space to a room.
project 10
AFTER
July 2011
Converting part of the roof space to a room.
project10
AFTER
July 2011
Converting part of the roof space to a room.
DURING
October 2011
Front first floor extension and large rear ground floor extension.
DURING
October 2011
Front first floor extension and large rear ground floor extension.
DURING
October 2011
Front first floor extension and large rear ground floor extension.
AFTER
October 2011
Front first floor extension and large rear ground floor extension.
AFTER
October 2011
Front first floor extension and large rear ground floor extension.
AFTER
October 2011
Front first floor extension and large rear ground floor extension.
AFTER
October 2011
Front first floor extension and large rear ground floor extension.
AFTER
October 2011
Front first floor extension and large rear ground floor extension.
bedroom
AFTER
December 2011
Part of roof repointed and lead replaced
AFTER
December 2011
Part of roof repointed and lead replaced
BEFORE
December 2011
Part of roof repointed and lead replaced
BEFORE
November 2011
project 7
loft and upstairs landing conversion
BEFORE
November 2011
project 7
loft and upstairs landing conversion
BEFORE
November 2011
project 7
upstairs landing and loft conversion
DURING
November 2011
project 7
loift and upstairs landing conversion
DURING
November 2011
project seven
loft and upstairs landing conversion
AFTER
November 2011
project 7
loft and upstairs landing conversion
AFTER
November 2011
project 7
loft and upstairslanding conversion
AFTER
November 2011
project 7
loft and upstairs landing conversion
AFTER
November 2011
project 7
loft and upstairs landing conversion
AFTER
November 2011
project 7
loft and upstairs landing conversion
AFTER
November 2011
project 7
loft and upstairs landing conversion
AFTER
November 2010
Dug out and rebuilt back patio and fixed waste pipe
AFTER
November 2010
Dug out and rebuilt back patio and fixed waste pipe
AFTER
November 2010
Dug out and rebuilt back patio and fixed waste pipe
AFTER
November 2010
Dug out and rebuilt back patio and fixed waste pipe
AFTER
November 2010
Dug out and rebuilt back patio and fixed waste pipe
AFTER
June 2011
Re laid block paving patio and built new edging wall.
AFTER
June 2011
Re laid block paving patio and built new edging wall.
AFTER
June 2011
Re laid block paving patio and built new edging wall.
AFTER
November 2011
front wall windsor
take down damaged wall and rebuild
AFTER
July 2011
project 21
knock down and rebuild front wall
BEFORE
April 2011
Relaying brick retaining walls in garden
AFTER
April 2011
Relaying brick retaining walls in garden
AFTER
April 2011
project garden wall
take off and rebuild parts of garden wall
AFTER
April 2011
Sandstone patio 80m2
AFTER
April 2011
Sandstone patio 80m2
AFTER
April 2010
Double dorma.
Rear of House
AFTER
April 2010
Double dorma.
Bedroom 1
AFTER
April 2010
Double dorma.
Bedroom 2
AFTER
September 2008
project 14
left side front
AFTER
September 2008
project 14
bedroom
AFTER
September 2008
project 14
left side
AFTER
September 2008
project 14
master bedroom
AFTER
September 2008
project 14
rear extension
AFTER
September 2008
project 14
toilet and shower room
AFTER
March 2011
Small porch extension on front door.
DURING
March 2011
Small porch extension on front door.
DURING
March 2011
Small porch extension on front door.
AFTER
November 2009
Restraunt refurbishment.2
the snug
AFTER
November 2009
Restraunt refurbishment.2
front seating area
AFTER
November 2009
Restraunt refurbishment.2
rear exstension
AFTER
November 2009
Restraunt refurbishment.2
back area
AFTER
November 2010
Restaurant build 1
bar area
AFTER
November 2010
Restaurant build 1
middle part of restaurant
AFTER
November 2010
Restaurant build 1
bar area
AFTER
November 2010
Restaurant build 1
left side
DURING
March 2011
project 9
kitchen
DURING
March 2011
project 9
kitchen
DURING
March 2011
project 9
dining room
DURING
March 2011
project 9
open plan front room
DURING
March 2011
project 9
kitchen
AFTER
March 2011
project 9
hallway
AFTER
March 2011
project 9
back of kitchen
AFTER
March 2011
project 9
kitchen
AFTER
March 2011
project 9
kitchen
AFTER
March 2011
project 9
rear of exstension
AFTER
March 2011
project 9
rear of exstention
AFTER
March 2011
project 9
side exstention
AFTER
March 2011
project 29
front view with new drive
AFTER
March 2011
project 29
front porch exstention
AFTER
March 2011
project 29
side view
AFTER
March 2011
project 2
front exstension and garage
AFTER
March 2011
project 8
upvc porch exstention
AFTER
March 2011
project 11
double dorma with brick end
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?