Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
M D J Building
80
work photos
My Profile
Page
My Customer
Feedback
My Photos
DURING
February 2012
Patio
Brick Soldier course and Weatherstruck and Cut jointing to existing wall.
DURING
February 2012
Patio
Brick paved patio, Brick soldier course, Weatherstruck and Cut jointing to soldier course and existing brick wall.
AFTER
February 2012
Patio
Brick paved patio, Brick soldier course, Weatherstruck and Cut jointing to soldier course and existing brick wall, Acodrain.
DURING
February 2012
Patio
Acodrain, Brick soldier course, Weatherstruck and Cut jointing, Brick paved patio.
BEFORE
February 2012
Kitchen conversion
Brick up doorway, remove window and fit new smaller window, and point brickwork in Weatherstruck and Cut joint to match existing.
AFTER
February 2012
Patio and Kitchen conversion.
Brick paved patio, Aco-drain, Weatherstruck and Cut jointing to bricked up doorway on the right, and under new window and concrete cill.
BEFORE
August 2008
Widening of external door frame and fitting of trifold doors.
Removal of single door, new concrete lintels to create wider opening and fitting of TriFold doors
AFTER
August 2008
Widening of external door frame and fitting of trifold doors.
BEFORE
April 2009
Enlarging window fitting new window and door.
Remove uPVC window, put in RSJ to enlarge opening for new timber double glazed Victorian style window, with new segmental arch
AFTER
April 2009
Enlarging window fitting new window and door.
BEFORE
August 2007
Garage conversion
Remove garage door, fit uPVC window, insulate floor,ceiling and party wall, screed floor, electrics and new radiator
AFTER
August 2007
Garage conversion
BEFORE
June 2007
Brick wall round end of garden approx 6x90.
AFTER
June 2007
Brick wall round end of garden approx 6x90.
BEFORE
June 2007
Brick wall round end of garden approx 6x90.
BEFORE
June 2007
Brick wall round end of garden approx 6x90.
Remove all bushes and trees that were in the building line
AFTER
June 2007
Brick wall round end of garden approx 6x90.
DURING
March 2012
Decking in Saltdean
Remove brick structure that formed a rear patio that was pulling away from the house and construct decking on posts with void underneath for storage.
AFTER
March 2012
Decking in Saltdean
AFTER
March 2012
Decking in Saltdean
AFTER
March 2012
Decking in Saltdean
DURING
March 2012
Exterior Decorating in Kemptown
Remove all flaky paint and paint all masonry, windows and door.
AFTER
March 2012
Exterior decorating to property in Kemptown
DURING
March 2012
Exterior Decorating in Brighton
Remove rotten timber lintels to first floor windows and install new concrete lintels to Structural Engineers specification.Scraped off all flaking paint and painted all masonry and windows.
AFTER
March 2012
Exterior Decorating in Brighton
BEFORE
February 2012
Garden Wall
Remove existing wall and replace with new.
DURING
February 2012
Garden wall
Take down existing wall and replace with new.
AFTER
February 2012
Garden wall
Take down existing wall and replace with new.
BEFORE
February 2012
Kitchen conversion
Weatherstruck and Cut pointing to new brickwork.
AFTER
February 2012
Kitchen conversion
Weatherstruck and Cut pointing to new brickwork.
BEFORE
February 2012
Bathroom window
Remove existing window and replace with new UPVC window and render beneath.
AFTER
February 2012
Bathroom window
Remove existing window and replace with new UPVC window and render beneath.
BEFORE
February 2012
Loft window
Remove existing loft window and replace with new UPVC window, and replace tile.
AFTER
February 2012
Loft window
Remove existing window, replace with new UPVC window and replace tile.
BEFORE
February 2012
Soldier course
Remove spalled bricks and replace with new.
AFTER
February 2012
Soldier course
Remove spalled bricks and replace with new.
DURING
July 2007
Building.
AFTER
July 2007
Building.
Removed path and created patio, joining both ends of the existing path.
BEFORE
February 2012
Velux window
Remove existing roof window, increase size of opening and fit Velux window.
AFTER
February 2012
Velux window
Old roof window removed, increased size of opening and fit Velux window.
BEFORE
February 2012
Steps
AFTER
February 2012
Steps
Curved reatining wall.
AFTER
February 2012
Steps
New top step, landing and retaining wall.
BEFORE
February 2012
Soldier course
AFTER
February 2012
Soldier Course
New soldier course, repairs to corner and replaced spalled bricks to wall.
BEFORE
February 2008
Laying very large patio.
Removal of slabs, laying of new base, cleaning off new slabs and relaying with brick edgeing and dwarf retaining wall.
BEFORE
February 2008
Laying very large patio.
BEFORE
February 2008
Laying very large patio.
February 2008
Laying very large patio.
February 2008
Laying very large patio.
AFTER
February 2008
Laying very large patio.
AFTER
February 2008
Laying very large patio.
AFTER
February 2008
Laying very large patio.
BEFORE
February 2012
Warehouse
Take down wall, tidy brickblockwork behind, cut recess for sump pumps to sit in, with access panels, insulate wall, rebuild blockwork and paint.
DURING
February 2012
Warehouse
Blockwork removed. Clean off snots, fill mortar joints in blockwork and clean out cavity.
DURING
February 2012
Warehouse
Blockwork all down and on pallets ready to be taken away and recycled.
DURING
February 2012
Warehouse
Insulation in and Blockwork almost finished.
AFTER
February 2012
Warehouse
Right hand side finished.
AFTER
February 2012
Warehouse
Left hand side finished.
DURING
February 2012
College window
Removed plaque and created opening for new window.
AFTER
February 2012
College Window
Double soldier course to replicate the others at the College
BEFORE
December 2008
Door and Frame replacement
Remove timber door and frame and replace with double glazed uPVC door and frame
AFTER
December 2008
Door and Frame replacement
AFTER
April 2007
New piers and gate
Rebuilt part of wall, built new piers with mortar capping to match existing and hang gate after storm damage
BEFORE
August 2007
Brick wall
Take down wall due to crack from vehicle collision and rebuild with soldier course capping
AFTER
August 2007
Brick wall
BEFORE
November 2009
Structural work, wall and chimney breast removal and kitchen fit.
AFTER
November 2009
Structural work, wall and chimney breast removal and kitchen fit.
BEFORE
November 2009
Structural work, wall and chimney breast removal and kitchen fit.
AFTER
November 2009
Structural work, wall and chimney breast removal and kitchen fit.
DURING
July 2010
Meadow Lake, Esher
Front garden wall before front piers were completed
July 2010
Meadow Lake, Esher
Front pier to front garden wall
July 2010
Meadow Lake, Esher
Brick planters in rear garden
July 2010
Meadow Lake, Esher
Utility Area with potting sheds, log store and external chimney
July 2010
Meadow Lake, Esher
Utility Area Potting sheds and log store
July 2010
Meadow Lake, Esher
Utility Area Base for greenhouse plinth brick detail internally
July 2010
Meadow Lake, Esher
Steps to rear garden
July 2010
Meadow Lake, Esher
Back of Mower Store with arch
July 2010
Meadow Lake, Esher
Front of Mower Store
July 2010
Meadow Lake, Esher
Both front piers complete
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?