Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
McMurray & Martin LLP
43
photos of recent work
My Profile
My Feedback (22)
My Photos (43)
DURING
March 2011
house referbishment
removal of walls to top of stairs to give stairs more light
AFTER
May 2012
house referbishment
BEFORE
May 2011
kitchen refit
create larger kitchen by removal of supporting wall.
DURING
May 2011
kitchen fefit
DURING
May 2011
kitchen refit
AFTER
May 2011
kitchen refit
AFTER
May 2011
kitchen refit
BEFORE
August 2011
new kitchen
removal of old kitchen and instulation of new modern kitchen
BEFORE
August 2011
new kitchen
AFTER
August 2011
new kitchen
finished kitchen
AFTER
August 2011
new kitchen
finished kitchen
AFTER
February 2013
Replace ceiling and loft insulation, fully plaster ceiling, decorate and paint room.
AFTER
February 2013
Replace ceiling and loft insulation, fully plaster ceiling, decorate and paint room.
ceiling removed re boarded and plastered then room decorated
BEFORE
March 2013
Knock down chimney breast and two arch walls.
removal of chimney breast and load supporting wall
DURING
March 2013
Knock down chimney breast and two arch walls.
new steels inserted into ceiling void to allow for a flush ceiling level. floor joists hung from new steel using joist hangers with noggins in between to prevent twisting of joists
DURING
March 2013
Knock down chimney breast and two arch walls.
removal of existing steel ready for new steel
AFTER
March 2013
Knock down chimney breast and two arch walls.
finished lounge, ceiling plastered and room redecorated
BEFORE
February 2013
dry rot
dry rot was discovered under timber floor
AFTER
February 2013
dry rot
all floor joists were removed and floor excavated to allow more airflow. two new air bricks were installed and ground and masonry treated to eradicate the dry rot. new tanalised timber joists installed and give a coat of boracol 20 dual purpose to protect from dry rot.
DURING
February 2013
kitchen instulation
old kitchen being removed, new down lights being wired up ready for the ceiling to be overboarded and skimed
AFTER
February 2013
kitchen instulation
finished kitchen
AFTER
February 2013
kitchen instulation
kitchen finished. cream gloss doors with gloss aubergine worktops and breakfast bar. new kardine floor and re decorated
AFTER
February 2013
oak bifolding doors
create opening in stud wall and install bifolding oak doors
BEFORE
February 2013
bathroom instulation
high spec bathroom
BEFORE
February 2013
bathroom instulation
high spec bathroom instulation
AFTER
February 2013
bathroom instulation
high spec bathroom finished
AFTER
February 2013
bathroom instulation
high spec bathroom finished
AFTER
February 2013
bathroom instulation
high spec bathroom finished
AFTER
February 2013
bathroom instulation
high spec bathroom finished.
AFTER
February 2013
bathroom instulation
high spec bathroom finished. porcelain wall tiles with constituted granite floor tiles. blue led lights to recessed and underfloor heating to heat tiles
BEFORE
September 2012
Remove plaster large ceiling and replace with plaster board and plaster skim. Paint ceiling and rei
ceiling proped up to prevent ceiling from falling down
DURING
September 2012
Remove plaster large ceiling and replace with plaster board and plaster skim. Paint ceiling and rei
carpet removed and walls covered to prevent damage
DURING
September 2012
Remove plaster large ceiling and replace with plaster board and plaster skim. Paint ceiling and rei
plaster coving and ceiling removed.ceiling joists treated for woodworm before reboarded
DURING
September 2012
Remove plaster large ceiling and replace with plaster board and plaster skim. Paint ceiling and rei
ceiling boarded and given two coats of plaster skim
DURING
September 2012
Remove plaster large ceiling and replace with plaster board and plaster skim. Paint ceiling and rei
AFTER
September 2012
Remove plaster large ceiling and replace with plaster board and plaster skim. Paint ceiling and rei
room redecorated with new ornimental plaster coving
AFTER
September 2012
Remove plaster large ceiling and replace with plaster board and plaster skim. Paint ceiling and rei
room redecorated with new ornimental plaster coving.
DURING
July 2012
Rebuilding dormer
DURING
July 2012
Rebuilding dormer
DURING
July 2012
Rebuilding dormer
DURING
July 2012
Rebuilding dormer
AFTER
July 2012
Rebuilding dormer
AFTER
August 2012
rebuild bay windows
rebuild bay windows. finished with upvc shiplap and new lead work
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?