Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
PC Carpentry
36
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
May 2010
Decking of back garden
AFTER
May 2010
Decking of back garden
AFTER
May 2010
Decking of back garden
AFTER
May 2010
Decking of back garden
AFTER
March 2012
Built in Wardrobes to match existing doors and architrave
Pre painting
AFTER
March 2012
Built in Wardrobes to match existing doors and architrave
Example of wardrobe internals pre painting
AFTER
May 2012
Bedroom cabinet to match existing wardrobes
AFTER
February 2010
Kitchen Instillation and Flooring
AFTER
July 2011
Kitchen Installation and flooring
BEFORE
April 2010
Oak Flooring, Skirting, Architrave and Doors
AFTER
April 2010
Oak Flooring, Skirting, Architrave and Doors
AFTER
April 2010
Oak Flooring, Skirting, Architrave and Doors
DURING
March 2012
Oak veneered book shelf units to match stair handrail.
AFTER
March 2012
Oak veneered book shelf units to match stair handrail.
BEFORE
January 2010
Removed 2 rotten 15meter footbridges over a lake and rebuilt replicars
AFTER
January 2010
Removed 2 rotten 15meter footbridges over a lake and rebuilt replicars
Hardwood handrail with treated softwood infill (pre staining)
AFTER
January 2010
Removed 2 rotten 15meter footbridges over a lake and rebuilt replicars
Hardwood handrail with treated softwood infill (pre staining)
AFTER
February 2012
Two rows of cupboards built into attic bedroom
AFTER
February 2012
Two rows of cupboards built into attic bedroom
AFTER
February 2012
Two rows of cupboards built into attic bedroom
AFTER
February 2012
Two rows of cupboards built into attic bedroom
AFTER
June 2011
Fit seven single and one double new oak doors
AFTER
June 2011
Fit seven single and one double new oak doors
AFTER
June 2011
Fit seven single and one double new oak doors
AFTER
July 2011
Flooring and Skirting throughout ground floor
AFTER
July 2011
Flooring and Skirting throughout ground floor
AFTER
July 2011
Flooring and Skirting throughout ground floor
May 2010
Oak Doors
Hung 9 Internal Oak Doors with Black Ornate Antique Handles
AFTER
July 2011
Complete new office with shelves incorporated in floor to ceilling cupboards, new desk and flooring.
AFTER
July 2011
Complete new office with shelves incorporated in floor to ceiling fitted cupboards, new desk and flo
September 2009
Fitted Wardrobes
MDF shaker style wardrobes Pre Painting
September 2009
Fitted Wardrobes
Example of wardrobe internals made to suit
March 2009
Alcove shelving
25mm MDF built in shelving unit, replacement skirting, coving and painted
March 2009
Stairs
New Spindles, handrail and newel post s to loft conversion
BEFORE
January 2009
Boxing in pipes, boiler cupboard, kitchen cornice.
Exposed pipes and boiler
AFTER
January 2009
Boxing in pipes, boiler cupboard, kitchen cornice.
MDF boxing and shaker style boiler cupboard to match kitchen units pre painting
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?