Complete plastering over haul to bedroom renovation.
Complete overhaul to bedroom 1
October 2010
External rendering repair at front of property.
External repair to waterdamp damaged Tyrolean
October 2010
Complete bathroom refit.
Complete bathroom refurbishment 2 coat work plus new ceiling
October 2010
Various internal plaster repairs to damp areas in house
New boards and skim to damaged bathroom ceiling
October 2010
External render repair to side of house
External repairs to damaged render
October 2010
New boards and finish coat to bedroom ceiling
New boards and finish coat skim to bedroom ceiling
September 2010
Traditional lime plaster repair to bedroom wall
Traditional lime plaster repair to damaged bedroom wall
October 2010
Damp proofing work and plastering in lounge.
Various Traditional lime plastering work to grade 2 listed period home
September 2010
Plaster inside built in wardrobe.
New finish coat skim to inside of built in wardrobe
September 2010
Traditional lime plaster repair to lounge wall
Traditional lime plaster repair to damaged lounge wall
September 2010
New stairwell ceiling plus skim stairwell walls.
New finish coat skim to stairwell ceiling
September 2010
New boards and finish coat to bedroom ceiling.
New boards and finish coat skim to bedroom ceiling
May 2013
Re plastered bedroom and sloping ceiling in loft space.
Re plastered bedroom and sloping ceiling in loft space
April 2013
Overboard and plaster a damaged artex ceiling.
New plaster board and finish coat skim to water damaged kitchen ceiling
January 2013
Repairs to bedroom wall damaged by penetrating damp.
Repairs to bedroom wall damaged by penetrating damp
January 2013
Dry lining fitment, hard wall base finish plastering to long garage and damaged stairwell walls.
New base coat, dry lining and new finish coat skim to garage conversion walls
December 2012
Removal of old lime plaster that also had gypsum plaster over on a fireplace wall, replaster totally
Damp repairs and new finish coat to fireplace wall area
December 2012
Traditional lime plaster to my daughters bedroom walls.
Traditional lime plaster applied to daughters bedroom walls
December 2012
Traditional lime plaster to my sons bedroom walls.
Traditional lime plaster to bedroom walls and also new finish coat skim to ceiling
December 2012
Plastering lounge.
New finish coat skim to lounge walls and ceiling
November 2012
Traditional lime and lath plaster renovation to lounge.
Traditional lime plaster finish coat being applied to lounge wall
October 2012
New finish coat to toilet ceiling.
New finish coat skim to toilet ceiling
October 2012
New finish coat to hallway ceiling.
New finish coat skim to hallway ceiling
November 2012
New finish coat to lounge ceiling.
New finish coat skim to lounge ceiling
September 2012
New finish coat to dining room ceiling.
New finish coat skim to dining room ceiling
September 2012
New finish coat to study ceiling.
New finish coat skim to study ceiling
August 2012
Repair holes in plasterboard walls and ceiling
Repairs and new skim coat to walls and ceiling area
September 2012
Damp proofing work carried out to kitchen walls in our grade 2 listed property.
Water proof render and new skim coat to very damp kitchen area
September 2012
Traditional lime plaster to snug walls.
Traditional lime plaster to snug walls and ceiling
October 2012
Traditional lime plaster between oak panels in master bedroom.
Traditional lime plaster betweek oak in master bedroom
October 2012
Traditional lime plaster between oak panels on landing walls.
Traditional lime plaster between oak on landing area
August 2012
Renovate bedroom wall in period house
New finish coat skim to bedroom wall
August 2012
Repair holes in plasterboard walls and ceiling
Repair holes in plaster board walls and ceiling
August 2012
Plaster bathroom ceiling and walls.
New finish coat to bathroom ceiling and walls
August 2012
Plaster master bedroom walls and ceiling.
New boards and new finish coat to bedroom walls and ceiling
August 2012
Repairs to damp wall in lounge.
Repairs and new finish coat to water damaged lounge wall
August 2012
Wall in lounge.
New finish coat skim to lounge wall
August 2012
Ceilings in hall, dinning room, stairs and landing were smoothed to cover existing artex existing
Replaster various ceilings in house
June 2012
Various plastering works to country cottage walls and ceilings.
Various plastering works to country cottage walls and ceilings
May 2012
Damp proofing work to panels between oak in back bedroom.
Damp proofing work to panels between oak in back bedroom
May 2012
Box in RSJ and plaster hallway wall
Box in and plaster new RSJ and new finish coat skim to hallway ceiling
May 2012
Water damaged dining room ceiling
New boards and finish coat skim to dining room ceiling
April 2012
Traditional lime plaster to lounge wall panels.
Traditional lime plaster between oak to wall and ceiling panels
May 2012
Traditional lime plaster to master bedroom ensuite.
Traditional lime plaster to walls and ceiling in ensuite
April 2012
Traditional lime plaster to master bedroom wall panels
Traditional lime plaster fat lime to bedroom ceiling and wall panels
April 2012
Removing and replastering areas affected by damp.
Various plastering works done to various issues in property
March 2012
Cosmetic work, ceiling and fireplace
Build new fireplace then skim ceiling, fireplace and wall 1
March 2012
Plastering of study ceiling
New plaster board and finish coat skim to study ceiling
March 2012
Plastering of Bedroom ceiling
New plaster board and finish coat skim to bedroom ceiling
February 2012
Two demonstration lime plaster panels.
Traditional lime plaster panels between oak
February 2012
Two demonstration plaster panels
External Sandcement render demo panels
February 2012
Two demonstration lime plaster panels.
Two traditional lime plaster demo panels
January 2012
New finish coat skim to stairwell ceiling.
New finish coat skim to stairwell ceiling
January 2012
New finish coat skim to bedroom ceiling.
New finish coat skim to bedroom ceiling
January 2012
Plaster repairs to water damaged walls
Plaster repairs and new finish coat skim to water damaged walls
January 2012
New plaster board and finish coat to stairwell ceiling.
New plaster board and finish coat skim to stairwell ceiling
January 2012
Kitchen plastered.
New finish coat skim to kitchen walls and ceiling
November 2011
Plaster skim over a plasterboard patch that I had fitted
Plaster skim over a plaster board patch fitted by client.
January 2012
Large crackplaster repair over window
Large crackplaster repair over window.
November 2011
Plaster skim over a plasterboard patch that I had fitted
Repair and new finish coat skim to damaged wall area.
October 2011
Screed boiler roof floor.
Screed boiler room floor reinforced fibre screed
October 2011
Convert stables into offices.
Waterproof sand cement render to old stable walls convert into small offices
September 2011
External plastering to outside of property.
First coat of 2 coat external rendering to outside of property
September 2011
New plaster board and finish coat to lounge ceiling
New plaster board and finish coat skim to lounge ceiling
June 2011
New bathroom ceiling and base coat to walls ready to receive tiles
New bathroom ceiling and walls ready to recieve paint
July 2011
New ceiling and walls to utility room ready to receive paint.
New ceiling and walls to utility room ready to recieve paint
July 2011
Repairs to large vertical cracks under bay window
Repairs and skim coat to bay window area
May 2011
Five new traditional plaster panels between oak beams.
Traditional lime plaster panels between oak beams
May 2011
New finished coat skim to loft conversion walls and ceiling.
New plaster board and finish coat skim to loft conversion
May 2011
New plaster board
New boards, beads and finish coat to intricate window area
May 2011
Water Damaged ceiling and plastering of wall
Repair to water damaged kitchen ceiling and new finish coat skim to a couple of kitchen walls
April 2011
New dining room walls and fire place.
Replaster dining room including new fireplace area
April 2011
New dining room ceiling.
New boards and finish coat skim to water damaged dining room ceiling
April 2011
New base coat to kitchen walls
New base coat to repair damaged kichen walls
April 2011
Replacement of water damaged ceiling
New boards and finish coat skim to water damaged kitchen ceiling
March 2011
Waterproff rendering white to outside walls.
White waterproof render tanking to outside bathroom walls
March 2011
DPC injecting and water proof tanking.
DPC injecting followed by waterproof rendering with a Gypsum finish coat
March 2011
Repaired damaged skim to bathroom wall
Urgent repair to damaged bathroom wall
March 2011
New boards and finish coat to kitchen ceiling.
New boards and finish coat skim to kitchen ceiling
February 2011
New boards and finish coat to entrance hall ceiling.
New boards and finish coat to entrance hall ceiling
February 2011
Plastering of ceiling and wall
New boards and finish coat skim to water damaged lounge ceiling
February 2011
New boards and finish coat to kitchen ceiling.
New boards and finish coat skim to water damaged bedroom ceiling
February 2011
Wall and ceiling repairs to lounge.
Carry out repairs then new finish coat skim to lounge wall
February 2011
New boards and finish coat to bedroom ceiling
New boards and finish coat skim to bedroom ceiling
January 2011
New finish coat to bethroom walls
New finish coat skim to bathroom walls
January 2011
New boards and skim coat to bathroom ceiling.
New boards and skim coat finish coat to bathroom ceiling
December 2010
Plaster walls in master bedroom.
Plaster new stud walls in master bedroom
November 2010
New insulation and floor screed to utility room.
New reinforced fibrescreed floor screed with new insulation
November 2010
New stud walls and plaster to landing area
New stud walls and plaster to landing area
October 2010
Complete plastering over haul to bedroom renovation.
complete overhaul to bedroom 2
August 2010
New ceiling to drawing room
New boards and finish coat skim to drawing room ceiling
September 2010
Rhys Thomas
Traditional Plasterer
August 2010
New traditional lime render panel.
New traditional lime render panel to match other original panels
August 2010
New lime plaster to kitchen wall
Traditional lime plaster applied to kitchen wall
August 2010
Build a new stud wall and plaster it.
Build a new stud wall to hide existing pipework then plaster it
August 2010
Remove old cupboard then plastered the walls.
Remove old cupboard then replaster the wall
July 2010
New boards and finish coat to ceiling.
New boards and finish coat skim to ceiling
July 2010
New lime plaster to lounge wall
New traditional lime plaster to lounge wall in grade 2 listed property
July 2010
Waterproof render plus finish coat on kitchen walls
Waterproof sandcement base coat applied to kitchen walls prior to new finish coat skim
June 2010
Repairs to damaged bedroom walls.
Repair and new finish coat skim to damaged bedroom walls
June 2010
New boards and finish coat to lounge ceiling.
New boards and finish coat skim to water damaged lounge ceiling
June 2010
Floor screed to dining room area.
New floor screed to dining room area
May 2010
New floor screed to kitchen area.
New floor screed to kitchen area
May 2010
New boards and finish coat to bathroom ceiling.
New boards and finish coat to bathroom ceiling.
June 2010
Traditional lime and lath plaster ceiling repair.
Traditional lime lath plaster ceiling repair
May 2010
Custom make fibrous balls to match original.
Custom make ornamental decorative balls for existing client as requested
May 2010
Full sandcement and skim renovation to lounge
Water proof render base coat and Gypsum based finish coat solved various damp issues in their tracks
April 2010
Renew flint work and sill in listed building
The early stages of rebuilding a 400 year old window sill and reveals using traditional lime plaster in a grade 1 listed church.
April 2010
New plaster to walls and ceiling in dining room.
New Gypsum based finish coat skim to ceiling area
April 2010
Waterproof render to damp area in porch.
Custom made waterproof render white to cure a damp patch in the porch
April 2010
New traditional lime plaster, plaster to end gable.
Traditional lime plaster scratch coat to panel on gable end of listed building
April 2010
Complete renovation of bedroom in listed building.
Scratch coat to bedroom walls prior to skimming
March 2010
Limecrete floor screed in listed building.
Limecrete floor screed being finished of by Dave Ellery, Director of Period Plastering Ltd
April 2010
Plastered whole KitchenCeiling and Damp proof
New scratch coat applied to kitchen walls prior to finish coat skim being applied
March 2010
New finish coat to study ceiling and walls.
New finish coat skim applied to study walls
March 2010
Create new archway to lounge area.
Cut out the wall and form a new archway into our lounge
March 2010
Form a new archway into lounge area.
Form a new archway into our lounge and then plaster the hallway walls plus one lounge wall to suit
February 2010
New plaster applied to bathroom walls.
Apply a new base coat and then a new finish coat to bathroom walls
January 2010
Plaster new window wall in study
Carry out repair to damaged wall then add a new Gypsum based finish coat skim
February 2010
Board and skim artex ceiling, re plaster damaged cracked wall
New ceiling and repair to a badly damaged wall
January 2010
Reinforced fibrescreed floor screed in new study.
Supply and lay a new reinforced fibrescreed floor screed
November 2009
New boards and plastering to landing and ceiling
New plaster board and finish coat skim to stairwell ceiling
January 2010
Reskim ceiling and walls in spare room
New finish coat skim applied to renovate a spare room
January 2010
New kitchen ceiling.
Cut out and repair water damaged area then apply a new finish coat skim
January 2010
Convert our garage into a study
New studwork, insulation and plaster board with finish coat skim to internalgarage walls
January 2010
New boards and finish plaster to entrance hall ceiling.
New boards and finish coat skim to entrance hall ceiling
January 2010
New boards and finish coats to old lounge ceiling.
New boards and finish coat to lounge ceiling
January 2010
New boards and finish coat to en suite ceiling.
New boards and finish coat to en suite ceiling
January 2010
New boards and finish coat to spare room ceiling.
New boards and finish coat to spare room ceiling
January 2010
New boards and finish coat to old kitchen ceiling.
New boards and finish coat to kitchen ceiling
December 2009
New scratch coat to bathroom walls following re fit.
New backing coat scratch coat applied to damaged bathroom walls
December 2009
New boards and finish coat to bathroom ceiling
New plaster board and finish coat scim to bathroom ceiling
December 2009
New bedroom ceiling, plus new bedroom walls.
New plaster board applied to bedroom as walls and ceiling
December 2009
New dining room ceiling Boards 2 finish coat.
New plaster board and finish coat scim to dining room ceiling.
January 2010
New boards and finish coat to master bed ceiling
New plaster board and finish coat scim to bedroom ceiling
January 2010
New plaster and paint work to bathroom ceiling and walls.
New plaster board and fiish coat skim to ceiling.
October 2009
New ceilings to entrance hall and stairwell.
New boards, Gypsum based finish coat and loft hatch to stairwell ceiling
November 2009
New finish coat to dining room walls
New Gypsum based finish coat skimming to dining room walls
December 2009
New finish coat to drawing room ceilings x2.
New plaster board and finish coat applied to drawing room ceiling
December 2009
Barn conversion listed property
New Gypsum based finish coat to ne window area
November 2009
Base coat repair and skim to bedroom walls.
Carry out plaster repairs to damaged wall then apply a new Gypsum based finish coat Skim to clients Bedroom wall.
November 2009
New finish coat skim to lounge walls
New Gypsum based finish coat applied to Clients Lounge walls
October 2009
Repairs to damaged kitchen walls
Carried out repairs to badly damaged kitchen wall following electrical works, then applied a new finish coat skim to entire wall area
November 2009
New bathroom ceiling boards and skim
New plaster boards and finish coat skim to damaged bathroom ceiling
October 2009
Making good to old warm air venting system holes
Remove old warm air heating vents, carry out repair to damaged areas then apply a new Gypsum based finish coat skim to entire ceiling area.
October 2009
Remove old serving hatch repair then reskim wall
Block up old serving hatch then apply a new Gypsum based finish coat skim to entire wall area
October 2009
Plastered a new extension
New Gypsum based finish coat skimming to numerous ceilings and walls in new extension
July 2009
Plastering, skimming, baby nursery room in grade 2 listed house
Complete overhaul of a bedroom ready for the arrival of our clients new baby
October 2009
Plastering and covering pipes and audiovisual wiring laid into wall in lounge.
Temorary repairs to walls and coving to tidy things up for our client prior to a complete plastering overhaul of the room in 6 weeks time
September 2009
Repair to damaged ceiling, plus new finish coat.
Repair to damaged ceiling follwed by a new Gypsum based finish coat skimming
October 2009
Clients DIY project block up old doorway in Kitchen
New Gypsum based finish coat applied by Period Plastering Ltd skimming
September 2009
Waterproofing render and finish coat to lounge walls.
Skiming New Gypsum based finish coat on top of a waterproof sandcement rendered base coat
July 2009
Multifinish gypsum finish coat to shower room skimming
New Gypsum based skim coat to clients DIY stud walls.
July 2009
Plaster base coat in showerbath room area.
New base coat scratch coat applied to single wall as requested
August 2009
Traditional lime plaster to fireplace mouth grade 2 listed property
Overhaul to a reclaimed fireplace surround showing traditional lime plaster scratch coat grade 2 listed property
August 2009
Overhaul existing fireplace plus chimney breast
Reskim existing fireplace and chimney breast for clients DIY project
August 2009
Traditional Lath and Lime Plaster grade 1 listed property
Traditional Lime plaster applied to oak laths ceiling, with lime plaster applied to brick on the walls, in a grade 1 listed property
July 2009
Various plastering following electrical rewire
Waterproof sandcement base coat with Gypsum finish coat
August 2009
Ceiling repair after water leak from above Insurance work
New plaster board ceiling plus Gypsum based finish coat insurance project
August 2009
New Gypsum based finish coat skimming
New finish coat applied to clients DIY project
August 2009
Waterproof Rendering
Internal waterproof sandcement based render scratch coat pool house bathroom.
July 2009
New finish coat to damaged wall
New Gypsum based finish coat skimming
July 2009
New finish coat to sons bedroom
Repair to wall following damage caused by removal of built in cuboards.
August 2009
Gypsum based finish coat skimming applied to clients DIY project