0845 408 4866
Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Properties Revived
38
work photos
My Profile
Page
My Customer
Feedback
My Photos
April 2009
Plantation Shutters
March 2009
Plantation Shutters
Custom built, full height, craftwood shutters, supplied and fitted.
December 2009
Solid Oak flooring
BEFORE
April 2009
Before Lean-too
AFTER
April 2009
New leanto utility room, Uckfield.
After removing the old utility room and fence, i built this timber leanto in place, awaiting feedback.
December 2009
The inside of the leanto
BEFORE
December 2009
Stairs panelling and cupboard
December 2009
Stairs panelling and cupboard
during
AFTER
December 2009
Stairs panelling and cupboard
April 2009
Oak partitioning doors and frame.
Bespoke, custom built, pattern 10 fully glazed, bifold doors to seperate living room from the conservatory.
April 2009
Custom made Oak framed doors, made and fitted.
View from conservatory
April 2009
Understairs storage cupboards
July 2011
Baby gate for top of stairs.
Buxted
March 2011
Barnhip roof
November 2008
Under stairs cupboards.
Two drawer units, a cupboard with shelves and a broom cupboard. Photo taken before the tidy up and job left for the customer to decorate.
October 2009
Ginnea Pig Hutch
May 2009
Bespoke MDF unit and shelves.
Left for the customer to decorated as instructed
September 2009
Exterior house decoration
Renew rotten timber, sand, prime, undercoat and gloss all timber surfaces front, side and back of property.
BEFORE
April 2009
Fit sliding wardrobe doors
AFTER
April 2009
Fit sliding wardrobe doors
Renew the front of Mr Howsons wardrobe with mirror sliding doors
BEFORE
October 2009
Construct a double wardrobe to match this existing one
AFTER
October 2009
Double wardrobe to match existing, bespoke.
December 2009
TV unit over old fire place unpainted
December 2009
Work benchs
December 2009
Work benches
BEFORE
December 2009
Solid Oak Flooring and New MDF skirting
Screed floor level before laying Oak floor and finishing with skirting
AFTER
December 2009
Solid Oak Flooring and Skirting
Laid on new screed and glued
December 2009
Boiler cupboard
Construction of the frame and shelves before putting the front on.
AFTER
December 2009
Finished boiler cupboard.
Louver doors, blank bottom access panel and removable bottom panels
December 2009
Plantation Shutters
Surveyed, supplied and fitted
July 2008
Bespoke unit
Understairs cupboard with drawers and hanging space
BEFORE
June 2010
Rotten window frame
AFTER
June 2010
New Frame
After finding extensive rot, we made and fit a new frame
BEFORE
May 2010
Pergola
Structural rot
May 2010
During, new timber spliced in.
One of two new posts and bracers
AFTER
May 2010
Pergola repairs
BEFORE
April 2010
Bathroom, Uckfield
New hardiBacker board fitted after ripping out old sink and removing old tiles.
AFTER
April 2010
Bathroom Uckfield
New tiling, Bespoke Oak unit and doors, sink and taps fitted, new tongue and groove Oak bath panel joinery made
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?