Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Property Enhancement
122
work photos
My Profile
Page
My Customer
Feedback
My Photos
AFTER
October 2010
elephant and castle london
new shower room
AFTER
October 2010
victoria london
new bathroom
AFTER
October 2010
victoria london
new bath,sink,toilet and slate tiles
AFTER
October 2010
hammersmith london
fitted wardrobes
AFTER
October 2010
hammersmith london
fitted wardrobes
AFTER
October 2010
lambeth london
built mdf units between columns
AFTER
October 2010
lambeth london
built flexible columns in new kitchen
AFTER
October 2010
hammersmith london
new door and wall
AFTER
October 2010
hammersmith london
new wall and door
AFTER
October 2010
lambeth london
mdf rad cover to suite staircase
AFTER
October 2010
lambeth london
staircase
AFTER
October 2010
lambeth london
staircase
AFTER
January 2012
Replaced 2 complete box sash windows, double glazed, finished in white.
DURING
January 2012
Fitted kitchen units, work tops, sink installed fridge and oven.
DURING
January 2012
Fitted shower tray, screen, shower, toilet and sink
DURING
December 2011
Flat 2 started second fix on all areas, lights sockets etc
DURING
December 2011
Constructed walls, plaster boarded walls, plaster walls.
DURING
November 2011
Finished joists started washing new floor down.
DURING
November 2011
Finished joists started fixing new floor down and wall
DURING
November 2011
Started stripping out front roomremoved rubbish from site.
DURING
November 2011
Installed new joists, wired sockets, started to install flooring.
DURING
October 2011
Started stripping out top floor flat, installing new wiring.
DURING
October 2011
New fuse boxes and started rewiring 2 rooms and plaster board
DURING
October 2011
Finished woring, plasterboard all areas and plastered
BEFORE
September 2011
Redecoration of most areas of the property
AFTER
September 2011
Scaffolding.down
AFTER
September 2011
Rubbed down, under coated, second filled, top coated.
DURING
August 2011
Scaffold up on front, cleaned off all flights
DURING
August 2011
Cleaned of all areas, made good all areas of front elevation.
DURING
July 2011
Painted sash windows, undercoat and top coat, cleaned all windows.
DURING
July 2011
Painted sash windows, undercoat and top coat, cleaned all windows.
DURING
July 2011
Painted sash windows, undercoat and top coat, cleaned all windows.
DURING
July 2011
Redecorated en suite shower room, lined and painting ceiling and walls
DURING
July 2011
Redecorated en suite shower room, lined and painting ceiling and walls
AFTER
July 2011
Re decorated top floor bathroom various maintenance.
AFTER
July 2011
Re decorated top floor bathroom various maintenance.
BEFORE
July 2011
Re decorated top floor bathroom various maintenance.
BEFORE
January 2012
Replaced 2 complete box sash windows, double glazed, finished in white.
AFTER
June 2011
Tiled floor in kitchen and above work tops.
AFTER
June 2011
Tiled floor in kitchen and above work tops.
DURING
June 2011
Tiled floor in kitchen and above work tops.
AFTER
July 2011
Industrial sanded hard wood decking coated with two coats of oil.
DURING
June 2011
Tiled floor in kitchen and above work tops.
DURING
July 2011
Industrial sanded hard wood decking coated with two coats of oil.
DURING
July 2011
Industrial sanded hard wood decking coated with two coats of oil.
AFTER
May 2011
4 bedroom house, replaced 7 doors with new hinges, locks and latches
AFTER
May 2011
Renewed 3 work tops, installed sink and hob
AFTER
May 2011
Renewed 3 work tops, installed sink and hob
AFTER
June 2011
Started decoration, dining room, ceiling, walls, wood work. Stripped out shower room.
AFTER
May 2011
Decorating 4 bedroom house
AFTER
May 2011
Decoration of 4 bed housemain bedroom and part of staircase decorated.
DURING
March 2011
Removed stud wall between kitchen and front room.
DURING
May 2011
Renewed 3 work tops, installed sink and hob
DURING
March 2011
Removed stud wall between kitchen and front room.
DURING
May 2011
Renewed 3 work tops, installed sink and hob
DURING
March 2011
New boxing in bathroom, painted 5 windows internally, changed taps,
AFTER
March 2011
New boxing in bathroom, painted 5 windows internally, changed taps,
DURING
March 2011
New boxing in bathroom, painted 5 windows internally, changed taps,
AFTER
February 2011
Fitted oak veneered wardrobes to top floor bedroom
AFTER
February 2011
Fitted oak veneered wardrobes to top floor bedroom
DURING
February 2011
Fitted oak veneered wardrobes to top floor bedroom
AFTER
November 2010
Replaced broken shower tray.
AFTER
November 2010
2 bed flat redecorated throughout ceiling, walls, wood work.
redecorated flat in surrey quays
AFTER
February 2011
Fitted oak veneered wardrobes to top floor bedroom
DURING
February 2011
Fitted oak veneered wardrobes to top floor bedroom
DURING
February 2011
Fitted oak veneered wardrobes to top floor bedroom
DURING
February 2011
Fitted oak veneered wardrobes to top floor bedroom
DURING
February 2011
Redecorated living room, ceiling, walls and wood work.
AFTER
January 2011
Stripped wall paper in front room from ceiling and walls prepared areas.
DURING
February 2011
Redecorated living room, ceiling, walls and wood work.
DURING
January 2011
Stripped wall paper in front room from ceiling and walls prepared areas.
DURING
January 2011
Stripped wall paper in front room from ceiling and walls prepared areas.
DURING
November 2010
Removed shower room, started setting out new room.
AFTER
November 2010
Replaced blocked shower tray.
AFTER
November 2010
2 bed flat redecorated throughout ceiling, walls, wood work.
AFTER
October 2010
Installed 2 x book cases and painted bathroom ceiling and now extractor fan.
AFTER
November 2010
2 bed flat redecorated throughout ceiling, walls, wood work.
AFTER
October 2010
Installed 2 x book cases and painted bathroom ceiling and now extractor fan.
DURING
October 2010
Installed 2 x book cases and painted bathroom ceiling and now extractor fan.
BEFORE
October 2010
Installed 2 x book cases and painted bathroom ceiling and now extractor fan.
AFTER
September 2010
Replaced kitchen sink taps . waste disposal unit.
BEFORE
September 2010
Replaced kitchen sink taps . waste disposal unit.
AFTER
September 2010
Removed and replaced bath with shower cubicle
AFTER
May 2011
Decorating 4 bedroom house
DURING
April 2011
Oak laminate flooring in kitchen, front room and hallway
DURING
June 2011
Started decoration, dining room, ceiling, walls, wood work. Stripped out shower room.
DURING
April 2011
Oak laminate flooring in kitchen, front room and hallway
DURING
April 2011
Oak laminate flooring in kitchen, front room and hallway
DURING
April 2011
Oak laminate flooring in kitchen, front room and hallway
AFTER
June 2011
Started decoration, dining room, ceiling, walls, wood work. Stripped out shower room.
AFTER
June 2011
Finished dining room decoration.
AFTER
May 2011
Decoration of 4 bed housemain bedroom and part of staircase decorated.
AFTER
May 2011
4 bedroom house, replaced 7 doors with new hinges, locks and latches
AFTER
June 2011
Started decoration, dining room, ceiling, walls, wood work. Stripped out shower room.
AFTER
September 2010
Removed and replaced bath with shower cubicle
BEFORE
September 2010
Removed and replaced bath with shower cubicle
DURING
August 2010
Replacement shower tray, various maintenance.
BEFORE
August 2010
Replacement shower tray, various maintenance.
AFTER
September 2010
Replaced bath with shower cubicle and cupboard, various maintenance
AFTER
June 2011
Started decoration, dining room, ceiling, walls, wood work. Stripped out shower room.
AFTER
June 2011
Removed floor tiles to bathroom, replaced with new tiles, various maintenance
DURING
June 2011
Removed floor tiles to bathroom, replaced with new tiles, various maintenance
AFTER
February 2011
Fitted oak veneered wardrobes to top floor bedroom
bexley kent
DURING
February 2011
Fitted oak veneered wardrobes to top floor bedroom
bexley kent
AFTER
November 2010
Replaced blocked shower tray.
rotherhithe london
AFTER
November 2010
2 bed flat redecorated throughout ceiling, walls, wood work.
rotherhithe london
AFTER
November 2010
2 bed flat redecorated throughout ceiling, walls, wood work.
rotherhithe london
AFTER
October 2010
Installed 2 x book cases and painted bathroom ceiling and now extractor fan.
battersea london
DURING
October 2010
Installed 2 x book cases and painted bathroom ceiling and now extractor fan.
battersea london
AFTER
September 2010
Replaced kitchen sink taps . waste disposal unit.
victoria london
BEFORE
September 2010
Replaced kitchen sink taps . waste disposal unit.
victoria london
AFTER
September 2010
Replaced bath with shower cubicle and cupboard, various maintenance
hammersmith london
AFTER
September 2010
Replaced bath with shower cubicle and cupboard, various maintenance
hammersmith london
BEFORE
September 2010
Replaced bath with shower cubicle and cupboard, various maintenance
hammersmith london
AFTER
October 2010
lambeth london
staircase
AFTER
October 2010
lambeth london
redecorated staircase with bronze matalic paint below dado and paper above
AFTER
October 2010
lambeth london
new box sash windows
BEFORE
October 2010
lambeth london
original box sash window
AFTER
October 2010
kitchen victoria london
side view
AFTER
October 2010
kitchen floor
new tiled floor
AFTER
October 2010
new kitchen
victoria london
AFTER
October 2010
new kitchen victoria london
removed original kitchen and replaced with new
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?