Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Pure Electric
48
photos of recent work
My Profile
My Feedback (131)
My Photos (48)
AFTER
March 2012
Consumer Unit Undertaken by Pure Electric, electrician in Poole
AFTER
March 2012
Lounge LED Lighting TV SystemUndertaken by Pure Electric, electrician in Poole
AFTER
March 2012
Swimming Pool WorksUndertaken by Pure Electric, electrician in Poole
AFTER
March 2012
Summer HouseUndertaken by Pure Electric, electrician in Poole
AFTER
March 2012
LED Lighting in HallwayUndertaken by Pure Electric, electrician in Poole
December 2012
Extractor Fan the correct way.Undertaken by Pure Electric, electrician in Poole
3a local fuse and triple pole isolation.
AFTER
November 2011
Full Rewire of HouseGarage
AFTER
November 2011
Full Rewire of HouseGarage Loft Wiring Dressed and Clipped.
AFTER
November 2011
Full Rewire of Garage
AFTER
March 2012
Summer House Power Supply
AFTER
March 2012
LED Kitchen Lighting System.
AFTER
March 2012
Catenary Wire Armoured Garage Supply.
DURING
August 2012
Highcliffe School
Installing 35mm 3core SWA, easier than 185mm
AFTER
March 2012
Sports Gym Room
AFTER
August 2012
Highcliffe School
Sub Main Disconnection
AFTER
August 2012
Highcliffe School
Access Equipment for Stage Lighting Bar Cabling System.
AFTER
August 2012
Highcliffe School
The important bit..... Testing
AFTER
August 2012
Highcliffe School
Internal Wiring of DB System
AFTER
March 2012
Power Lighting
AFTER
August 2012
Highcliffe School
Finished 150mm x 150mm Trunking System.
AFTER
August 2012
Highcliffe School
18way Industrial MEM DB System
AFTER
August 2012
Highcliffe School
Sub Main Origin inc. Phase Ameter
AFTER
August 2012
Highcliffe School
160amp Single Phase Supply
AFTER
August 2012
Highcliffe School
63amp RCD Supply Socket Outlets
AFTER
August 2012
Highcliffe School
DB System Upgrade
AFTER
June 2012
Complete rewire
Consumer Unit System
DURING
May 2012
Conservatory supply point.
AFTER
March 2012
Mini Trunking for Shower Supply
DURING
May 2012
Supply junction box system.
AFTER
August 2012
Highcliffe School
Connecting 63amp Industrial Socket Outlets
DURING
May 2012
Conduit works for supply to conservatory.
DURING
May 2012
Conduit works for supply to conservatory.
DURING
May 2012
TV flat screen plasma system first fix stage.
Broadstone, Poole
DURING
May 2012
Creekmoor, Poole
Wiring in position ready for conservatory.
AFTER
March 2012
Garage Light, Anti Corrosive Lighting Fitting.
AFTER
March 2012
Contactor Time Clock System for Car Park Lighting.
AFTER
March 2012
Victory School, Portsmouth Conduit Web Cam System.
AFTER
March 2012
Networking Cabling and Tray System
AFTER
March 2012
Theatre Supply of Power Lighting
AFTER
March 2012
Wireless Fire Alarm System to Block of Flats, Penn Hill, Poole.
AFTER
April 2011
External Lighting
AFTER
March 2012
Landing Wall LED Lighting System
DURING
March 2012
Garage Power Lighting
AFTER
March 2012
Conservatory Power Lighting
AFTER
August 2011
Emergency help
BEFORE
August 2011
Emergency help
AFTER
March 2012
Periodic Inspection and Test Report and Installation of bonding conductors to water
AFTER
March 2012
School Stage Lighting Supply
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?