Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Purple Windows
63
photos of recent work
My Profile
My Feedback (60)
My Photos (63)
July 2011
Porch
July 2011
Front Door Compersit
July 2011
Tile Kitchen Floor and Wall
Arrange complete kitchen re Fit
July 2011
Floor Wall Tiling
Arrange complete kitchen re Fit
July 2011
Floor Wall Tiling and fit windows
Kitchen and Windows
BEFORE
December 2010
Gym Front
Before
DURING
December 2010
Gym Front
2ND Stage
AFTER
December 2010
Gym Front
Finished
November 2011
Sliding Patio Door Front Porch
January 2012
Marble Bathroom Floor and Walls
Arrange Complete Bathroom
September 2010
Windows 2010, porch 2011.
May 2010
French Doors Georgian bars
May 2013
Seven windows and front door.
March 2013
5 Bay windows, 7 windows and 1 French doors.
March 2013
5 Bay windows, 7 windows and 1 French doors.
BEFORE
April 2013
Two new windows fitted
AFTER
April 2013
Two new windows fitted
AFTER
March 2013
Roof canopy design and install
AFTER
March 2013
Roof canopy design and install
AFTER
March 2013
Roof canopy design and install
AFTER
March 2013
Roof canopy design and install
BEFORE
March 2013
Roof canopy design and install
December 2012
Wall tiling in kitchen
December 2012
Fitted new patio doors and a lean too roof.
AFTER
February 2013
New gutter and downpipe and clean existing gutters.
BEFORE
February 2013
New gutter and downpipe and clean existing gutters.
AFTER
October 2012
New patio doors.
BEFORE
October 2012
New patio doors.
AFTER
October 2012
Two bay windows and one single window upvc.
AFTER
October 2012
Two bay windows and one single window upvc.
BEFORE
October 2012
Two bay windows and one single window upvc.
BEFORE
October 2012
Two bay windows and one single window upvc.
September 2012
Porch windows all round and door including soffit and facia.
September 2012
Porch windows all round and door including soffit and facia.
September 2012
Porch windows all round and door including soffit and facia.
September 2012
Porch windows all round and door including soffit and facia.
porch
July 2012
UPVC fascia, soffits and guttering front and back
June 2012
I had a French door inserted and the wall chopped out and it all plastered.
July 2012
UPVC fascia, soffits and guttering front and back
July 2012
sink splash back
July 2012
sink splash back
AFTER
June 2012
I had a French door inserted and the wall chopped out and it all plastered.
AFTER
June 2012
I had a French door inserted and the wall chopped out and it all plastered.
BEFORE
June 2012
I had a French door inserted and the wall chopped out and it all plastered.
AFTER
June 2012
Replacing 2 windows and surrounds.
BEFORE
June 2012
Replacing 2 windows and surrounds.
AFTER
June 2012
Glass roof over landing hall way.
DURING
June 2012
Glass roof over landing hall way.
BEFORE
June 2012
Glass roof over landing hall way.
June 2012
Tiled bays in showroom walls and floors.
June 2012
Tiled bays in showroom walls and floors.
June 2012
Tiled bays in showroom walls and floors.
June 2012
Tiled bays in showroom walls and floors.
June 2012
Floor and wall tiles, replace double glazed units.
June 2012
Floor and wall tiles, replace double glazed units.
June 2012
Floor and wall tiles, replace double glazed units.
AFTER
June 2012
French door to porch.
BEFORE
June 2012
French door to porch.
February 2012
Fit double glazing windows and doors
February 2012
Fit double glazing windows and doors
June 2010
New porch and conservatory
June 2010
New porch and conservatory
April 2011
Porch, all windows and Fascia, Soffits Guttering
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?