Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
R B Builders
198
work photos
My Profile
Page
My Customer
Feedback
My Photos
January 2010
Built in cupboard shelves
January 2010
Built in cupboard with glass shelving with downlight
January 2010
Radiator Cover
April 2009
Fitted Kitchen supplied fitted.
April 2009
Fitted Kitchen supplied fitted. Floor tiled
BEFORE
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
Old loft hatch prox 2ft x 2ft
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
New complete boxed loft hatch aprox 2.5ft wide x 3.5ft long
BEFORE
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
BEFORE
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
BEFORE
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
BEFORE
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
BEFORE
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
DURING
April 2012
Base for Shed 20 x16ft
DURING
April 2012
Base for Shed 20 x16ft
DURING
April 2012
Base for Shed 20 x16ft
AFTER
April 2012
Outside staircase
DURING
April 2012
Outside staircase
DURING
April 2012
New Staircase from back door to garden
AFTER
March 2012
Refurbishment of kitchen
AFTER
March 2012
Refurbishment of kitchen
AFTER
March 2012
Refurbishment of kitchen
AFTER
March 2012
Refurbishment of kitchen
DURING
March 2012
Refurbishment of kitchen
DURING
February 2012
Box in toilet cistern leaving access to working parts for any future access.
DURING
December 2011
Loft conversion sheet work and timber structure.
DURING
December 2011
Loft conversion sheet work and timber structure.
DURING
December 2011
Loft conversion sheet work and timber structure.
DURING
December 2011
Loft conversion sheet work and timber structure.
DURING
December 2011
Loft conversion sheet work and timber structure.
DURING
December 2011
Took out 2 chimneys through whole house.
AFTER
September 2011
Retile and insulate porch roof
AFTER
September 2011
Retile and insulate porch roof
AFTER
September 2011
Retile and insulate porch roof
BEFORE
September 2011
Retile and insulate porch roof
DURING
September 2011
Retile and insulate porch roof
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
DURING
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
DURING
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
DURING
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
DURING
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
DURING
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
DURING
May 2011
AZ completion of substantial remodelling of downstairs kitchendining roomutilitygarage area, inc
AFTER
March 2011
Ramp and platform for wheelchair access.
AFTER
March 2011
Ramp and platform for wheelchair access.
DURING
March 2011
Ramp and platform for wheelchair access.
DURING
March 2011
Ramp and platform for wheelchair access.
DURING
March 2011
Ramp and platform for wheelchair access.
BEFORE
March 2011
Ramp and platform for wheelchair access.
AFTER
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
DURING
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
DURING
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
AFTER
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
AFTER
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
AFTER
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
AFTER
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
AFTER
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
BEFORE
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
DURING
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
DURING
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
DURING
April 2011
Complete plaster and replace woodwork in lounge and hall, flooring tiling
AFTER
February 2011
Shower room built in master bedroom with partition erected, shower, sink and toilet installed, plumb
AFTER
February 2011
Shower room built in master bedroom with partition erected, shower, sink and toilet installed, plumb
AFTER
February 2011
Shower room built in master bedroom with partition erected, shower, sink and toilet installed, plumb
DURING
February 2011
Shower room built in master bedroom with partition erected, shower, sink and toilet installed, plumb
DURING
February 2011
Shower room built in master bedroom with partition erected, shower, sink and toilet installed, plumb
DURING
February 2011
Shower room built in master bedroom with partition erected, shower, sink and toilet installed, plumb
DURING
February 2011
Shower room built in master bedroom with partition erected, shower, sink and toilet installed, plumb
DURING
February 2011
Shower room built in master bedroom with partition erected, shower, sink and toilet installed, plumb
DURING
February 2011
Shower room built in master bedroom with partition erected, shower, sink and toilet installed, plumb
AFTER
January 2011
Complete renovation of a bathroom, shower room and toilet
AFTER
January 2011
Complete renovation of a bathroom, shower room and toilet
AFTER
January 2011
Complete renovation of a bathroom, shower room and toilet
AFTER
January 2011
Complete renovation of a bathroom, shower room and toilet
AFTER
January 2011
Complete renovation of a bathroom, shower room and toilet
AFTER
January 2011
Complete renovation of a bathroom, shower room and toilet
AFTER
January 2011
Complete renovation of a bathroom, shower room and toilet
DURING
January 2011
Complete renovation of a bathroom, shower room and toilet
DURING
January 2011
Complete renovation of a bathroom, shower room and toilet
DURING
January 2011
Complete renovation of a bathroom, shower room and toilet
BEFORE
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
Sheeted the kitchen floor so it didnt get damaged or marked
BEFORE
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
AFTER
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
AFTER
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
AFTER
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
AFTER
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
AFTER
January 2010
Fitted and decorated new Kitchenplastered ceilingfixed showernew wiringpainted Kitchen
AFTER
February 2010
Boxed in soil, sink, cold water pipes on external wall
BEFORE
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
Walls stripped and filled ready for rubbing down and new lining paper
BEFORE
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
BEFORE
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
Finished rooms wallpapered
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
AFTER
February 2010
External pipes boxed in
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
Built new movable ramp for pram
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
Completed weatherproof ramp ready for use
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
New Lotch Hatch
AFTER
February 2010
Redecoration of several rooms, removing fireplace, fitting loft hatch.
BEFORE
March 2010
Ensuite Shower Room stud wall and doorway
BEFORE
March 2010
Ensuite Shower Room stud wall and doorway
BEFORE
March 2010
Area to be converted into ensuite shower room
BEFORE
March 2010
Area to be converted into ensuite shower room
AFTER
April 2010
New Ensuite Bathroom
AFTER
April 2010
Ensuire Shower
AFTER
April 2010
Ensuite Shower Room stud wall and doorway
AFTER
April 2010
New Ensuite Bathroom
BEFORE
March 2010
Staircase before
BEFORE
March 2010
Hallway upstairs
BEFORE
March 2010
Bottom Staircase
BEFORE
March 2010
Staircase before
AFTER
April 2010
New Spindles
BEFORE
March 2010
Small Bedroom Before
AFTER
April 2010
Bedroom
BEFORE
March 2010
Small Bedroom Before
AFTER
April 2010
Room
BEFORE
March 2010
Front Room
BEFORE
March 2010
Front Room
AFTER
April 2010
Front Room
BEFORE
March 2010
Kitchen Before
BEFORE
April 2010
Kitchen Before
BEFORE
April 2010
New Ceiling
BEFORE
April 2010
old kitchen
BEFORE
April 2010
Old Kitchen
AFTER
April 2010
Kitchen After
AFTER
April 2010
Dining Room
BEFORE
March 2010
Bathroom
BEFORE
March 2010
Bathroom
BEFORE
March 2010
Bathroom
AFTER
April 2010
New Main Bathroom
AFTER
April 2010
New Bathroom
BEFORE
March 2010
Main bedroom before decoration
AFTER
April 2010
Bedroom
AFTER
November 2010
New plastic side panelling & roof in porch
AFTER
November 2010
Complete New Roof & leadwork
AFTER
November 2010
Roof Sophit
October 2010
Office Refurbishment
October 2010
Office Refurbishment
October 2010
Internal decorating
October 2010
Office Refurbishment
AFTER
September 2010
New door put in garage for access from garden
AFTER
September 2010
Completed Decking
AFTER
September 2010
Completed Decking
BEFORE
September 2010
Frame for Decking
BEFORE
September 2010
Framework
BEFORE
September 2010
Before work
BEFORE
September 2010
Mess in garden
AFTER
June 2010
Porch Canopy
AFTER
June 2010
Porch Canopy
AFTER
June 2010
Through lounge knock through.
AFTER
June 2010
Through lounge knock through.
AFTER
June 2010
Through lounge knock through.
AFTER
June 2010
Through lounge knock through.
AFTER
June 2010
Through lounge knock through.
AFTER
June 2010
Through lounge knock through.
BEFORE
June 2010
Through lounge knock through.
BEFORE
June 2010
Through lounge knock through.
BEFORE
June 2010
Through lounge knock through.
BEFORE
June 2010
Through lounge knock through.
AFTER
May 2010
New Bathroom
AFTER
May 2010
New kitchen
AFTER
May 2010
New Kitchen
AFTER
May 2010
New Decorated Hallway
AFTER
May 2010
New Decorated Room
AFTER
May 2010
New Toilet
AFTER
May 2010
New Bathroom
AFTER
May 2010
New Shower
AFTER
May 2010
New Bathroom
BEFORE
May 2010
Old Kitchen
BEFORE
May 2010
Old Bathroom
BEFORE
May 2010
Bathroom Ceiling
BEFORE
May 2010
Old Bathroom
BEFORE
May 2010
Old Bathroom
BEFORE
May 2010
Old Bathroom
BEFORE
May 2010
Old Kitchen
BEFORE
May 2010
Old Kitchen
AFTER
April 2010
New skirings, plywood floor plastering ready for decorating
BEFORE
April 2010
New Plywood Floor ready for Amtico flooring
April 2010
New Plaster drying out
April 2010
After plastering drying out
April 2010
New Ceiling ready for plastering
AFTER
April 2010
New Bathroom tiled walls
AFTER
April 2010
New Bathroom tiled walls
AFTER
April 2010
New Bathroom tiled walls
BEFORE
April 2010
Bathroom walls
BEFORE
April 2010
Bathroom walls
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?