Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Refurbishment Services
156
work photos
My Profile
Page
My Customer
Feedback
My Photos
AFTER
March 2009
Bespoke kitchen installation.
TOP OF THE RANGE KITCHEN, ONE OF OUR BEST.
AFTER
March 2009
Bespoke kitchen installation.
we organised all sub trades such as gas and electrics.
AFTER
May 2009
Mosaic Masterpiece
Mosaic border with diagonal infill
AFTER
March 2009
Bespoke kitchen installation.
the hole 9 yds , fron bulters sink, wine racks, no str walls.
AFTER
March 2009
Bespoke kitchen installation.
Wwe install this bespoke kitchen, tiled, barn installation.
AFTER
May 2009
kitchen Installation
New base and wall cabinets installed, shown with red glass splashback
AFTER
May 2009
The marble bathroom
Complete refurbishment of this floor. Overscrewed floorboards and used a specialist adhesive to fix the large 60x60cm tiles
AFTER
May 2009
Underfloor heating installed. 3 pattern limstone floor tiles.
This floor included underfloor heating and laid in a specialist adhesive, Bal Pourable Thickbed, to allow for uneven substrate.
AFTER
May 2009
Limestone Floor
AFTER
May 2009
The Wow Factor Kitchen
600x600mm tile laid on a floating floor with a specialist flexable adhesive
AFTER
April 2009
Bathrooms Floors tiled, floor rebuilt, shower enclosure fitted.
NEW TILED FLOOR, NEW SUBSTRATESEE OTHER PHOTOS
AFTER
April 2009
Bathrooms Floors tiled, floor rebuilt, shower enclosure fitted.
NEW TILED FLOORREINSTALLED RAD AND BATH
BEFORE
July 2011
Bathroom refurbishment
bathroom befroe everything going full gutt. full remodel.
DURING
September 2011
Complete bathroom refurbishment
we puuting the loo on existing cast iron..new shut off valves installed.
DURING
September 2011
Complete bathroom refurbishment
tiling completed..new bath installed
AFTER
July 2011
Bathroom refurbishment
free standing bath nook finished rad installed.hansgrohe floor tap.
BEFORE
September 2011
Complete bathroom refurbishment
lovely pink rad going going gone
BEFORE
September 2011
Complete bathroom refurbishment
well its a before shot of the bathroom we are about to do...stig on guard.
AFTER
July 2011
Bathroom refurbishment
carol outting the finishing touches to the duarvit loo installation
AFTER
July 2011
Bathroom refurbishment
its finishedgery flooring duarvit..schneider cabinet...grohe soap dishes
AFTER
July 2011
Bathroom refurbishment
we finish im in my socks..new hansgrohe raindance installed left.makti shower encloser
AFTER
July 2011
Bathroom refurbishment
start to look finished duravit basin.schneider pepline.makti shower
DURING
July 2011
Bathroom refurbishment
CAROLdoing some vacumning makti tray on left .basin a duravit double basin
DURING
July 2011
Bathroom refurbishment
GRAHAMfitting brackets for theSCHNEIDER PEPLINE CABINET.
DURING
July 2011
Bathroom refurbishment
tilingnote special ibox waterproofing system.HANSGROHE..
DURING
July 2011
Bathroom refurbishment
carol looks over the fitted hansgrohe ibox ready to go
DURING
July 2011
Bathroom refurbishment
double basin...plumbing going in.heated floor in.
DURING
July 2011
Bathroom refurbishment
tiling started ..floor prep done..drains through floor..nook ready
DURING
July 2011
Bathroom refurbishment
getting ready new walls new shampoo nook built..ready for tile
DURING
July 2011
Bathroom refurbishment
joists all doubled up to strenghten and take weigh of new matki shower tray
DURING
July 2011
Bathroom refurbishment
floor strenghteningwe ripped the old floor out.
AFTER
April 2011
New kitchen inc new ceiling and floor tiling, new loo, retiled hall
COMPLETE NEW KITCHEN
BEFORE
March 2011
Refurbish downstairs shower and tiling
THE REBUILD IN PRESSSURE TREATED. 200MM SCREWS.HARDIBACKER NEXT
AFTER
March 2011
Refurbish downstairs shower and tiling
COMPLETED JOB THE CLIENT HAPPY WITH OUR TILE MATCH
DURING
March 2011
Refurbish downstairs shower and tiling
CAROL FINISHING OFF THE RETILE AND REBUILD JOB
BEFORE
February 2011
Refurbish downstairs shower and tiling
REMOVAL OF THIS WOOD WHICH FORMED A UPSTAND
BEFORE
February 2011
Refurbish downstairs shower and tiling
WATER INGRESS IN SHOWER ROTTEN WOODDAY1
AFTER
March 2011
Complete bathroom renovation.
BASIN INTEGERAL TOPLOO. BACK TO WALL PAN.
DURING
March 2011
Complete bathroom renovation.
UNDER FLOOR HEATING GOING IN. NOTE RAD PIPES OUT OF WALL CLIENT REQUEST.
AFTER
March 2011
Complete bathroom renovation.
ALL BY USCOMPLETE REFIT
AFTER
March 2011
Complete bathroom renovation.
NEW AQUALISA QUARTZ INSTALLED BY USEVERYTHING FITTED BY US
AFTER
March 2011
Complete bathroom renovation.
NEW SINK MIRRORTAP TILIMG MOSAIC CABINETS ETC
AFTER
March 2011
Complete bathroom renovation.
COMPLETED JOBNEW FLOOR TILING WALLSSHOWERBATHETC
AFTER
July 2010
main bathroom floor
AMTICO FLOOR WALL MOSAIC RAD INSTALL ALL INSTALLED BY OUR TEAM
DURING
July 2010
Full bathroom refurbishment
DIAMOND PATTERN REQUESTED BY CLIENT 300X300mm tile
DURING
June 2011
MAIN BATHROOM WITH MOSAIC
CAROL FIXING MOSAIC
AFTER
May 2010
Bathroom and EnSuite
finish bathroom
DURING
January 2011
no 2 job crowborough
fitted back to wall loo.
AFTER
January 2011
2nd major job in Crowboroughensuite main abthroom
her the ensuite fitted furniture mosaic tile main field on a brick pattern
AFTER
July 2010
Old kitchen taken out and new kitchen put in.
new sink frenchsink very thick very robust
AFTER
July 2010
Old kitchen taken out and new kitchen put in.
the new cooker and tiling and cabinets
AFTER
January 2011
2 full bathrooms and 1 cloakroom gutted and refitted to completion
NEW TILING FLOOR AND WALLS NEW LOO NO BOXING BASIN
BEFORE
August 2010
2 full bathrooms and 1 cloakroom gutted and refitted to completion
EXISTING LOO SKIRTING BOARD IN VIEW
BEFORE
August 2010
2 full bathrooms and 1 cloakroom gutted and refitted to completion
ENSUITE EXISTING SHOWER WE FULLY REFURBED THIS NEW PARTS DIRECT FROM DARYL
BEFORE
January 2011
2 full bathrooms and 1 cloakroom gutted and refitted to completion
ENSUITE EXISTING
AFTER
January 2011
2 full bathrooms and 1 cloakroom gutted and refitted to completion
NEW LAGE BASIN PEDESTAL HIDDEN PIPEWAY NO BOXING
BEFORE
June 2010
Old kitchen taken out and new kitchen put in.
EXISTING KITCHEN RIPPED OUT
AFTER
June 2010
Full kitchensinktilingshelves.
FINISHED JOB NEW SINK NEW TOPS NE CABINETS
DURING
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
CAROL GETTING TO GRIPS WITH THE HARDI BACKER BOARD.
AFTER
May 2010
Totally new kitchen.
FINISHED KITHCEN NEW DEEP WALL UNITS 920 MM TALL
DURING
May 2010
Totally new kitchen.
THE KITHCEN GOING IN
BEFORE
May 2010
Totally new kitchen.
THE EXISTING KITHCEN
AFTER
July 2010
Full bathroom refurbishment
FINISH BATHROOM . NE BACK TO WALL LOOBOILERFLOOR
BEFORE
July 2010
Full bathroom refurbishment
THE BATH WHEN WE STARTED
AFTER
July 2010
Full bathroom refurbishment
FINISH VICTORIAN BATHROOM ORGINAL AND MODERN LIVING HAND IN GLOVE
DURING
July 2010
Full bathroom refurbishment
THE FLOOR BEING REMOVE BY GRAHAM ARNOLD
BEFORE
October 2009
New kitchen
EXISTING KITCHEN
AFTER
August 2010
Full bathroom refurbishment
SQUARE SHAPED BATH .DIAMOND PATTERN TILING
AFTER
June 2010
Full kitchensinktilingshelves.
NEW TOPS CABINETS
AFTER
January 2010
Full bathroom refurb Tiling, plumbing, heated floor, shower installed, loo, bath and basin.
FINISH BATHROOM SEMI PEDLGE FORMAT TILES,SLEEK LOO
AFTER
November 2009
Full bathroom refurb Tiling, plumbing, heated floor, shower installed, loo, bath and basin.
AQUALISA AXIS SHOWER INSTALLED BY US
AFTER
February 2011
BATHROOM REFURBISHMNET
NEW MOASAIC TILES WITH AMTICO FLOOR INSTALLED BY OUR TEAM
DURING
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
CONSTRUCTION THE NEW WALLS IN HARDI BACKER CONCRETE BOARD
AFTER
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
MAIN BATHROOM FINISHTILING ON A BRICK PATTERN.
AFTER
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
FINISHED LOO DOWNSTAIRS WE FITTED THE LOT
AFTER
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
FINISHED JOB DOWNSTAIRS LOO
BEFORE
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
EXISTING DOWNSTAIRS LOO
AFTER
October 2009
New kitchen
FINISH KITCHEN,FULL KITCHEN TILING, UNITS EXTRACTOR.LIGHTS
AFTER
July 2010
Old kitchen taken out and new kitchen put in.
NEW FRENCH MADE SINK IN SOLID WORKTOP
AFTER
February 2011
VANITY UNITHEATED MIIRROR
NEW TILING RAD AMTICO FLOORING
BEFORE
January 2011
2 full bathrooms and 1 cloakroom gutted and refitted to completion
MIAN BATH PRIOR TO REFURBISHMENT
BEFORE
January 2011
2 full bathrooms and 1 cloakroom gutted and refitted to completion
MAIN BATHSHOWER PRIOR TO RENOVATION
BEFORE
January 2011
2 full bathrooms and 1 cloakroom gutted and refitted to completion
PRIOR TO GUTT, MAIN ABTHROOM
BEFORE
January 2011
2 full bathrooms and 1 cloakroom gutted and refitted to completion
MAIN BATHROOM PRIOR TO WORKS
BEFORE
October 2010
Full refurbishment of kitchen
a big fridge anf freezer we eventually hide
BEFORE
October 2010
Full refurbishment of kitchen
hob extractor prior before we started.
BEFORE
October 2010
Full refurbishment of kitchen
the sink prior to us getting start to refurbish this kithcen.
BEFORE
October 2010
Full refurbishment of kitchen
welsh dresser prior to treatment
BEFORE
October 2010
Full refurbishment of kitchen
the existing kithcen painting ne marble top to follow
AFTER
October 2009
New kitchen
all new tiling, base and wall cabinets electricsetcetc
AFTER
May 2009
The Barn
Wetroom construction. Walls and floor tanked and overlaid with porcelain tiles
AFTER
May 2009
The Barn
A complicated limestone floor pattern using 3 different tiles in a pattern which only repeated every 6m
AFTER
May 2009
The Barn
Finished floor, total 120sqm throughout ground floor
AFTER
May 2009
Mosaic Masterpiece
Carol at work
AFTER
May 2009
Mosaic Masterpiece
Graham on cleaning duty, the big orange vacuum in the background
AFTER
May 2009
Mosaic Masterpiece
The final cuts
AFTER
May 2009
Shower cubicle reconstruction
Leaking shower cubicle deconstructed, rebuilt with Hardibacker Board cement board
BEFORE
May 2009
Floating floor in preparation for tiling
Pressure treated timber and subfloor in readiness for tiling essential work
BEFORE
May 2009
Leaking Shower Cubicle
Hardibacker Board installed over new stud work
AFTER
April 2009
Bathrooms Floors tiled, floor rebuilt, shower enclosure fitted.
SIMPSON SHOWER CUBICLE INSTALL all gold special.
AFTER
April 2009
Bathrooms Floors tiled, floor rebuilt, shower enclosure fitted.
CAROL PUTTING THE FINISHING TOUCHES TO THE SHOWER CUBICLE.
BEFORE
May 2009
Cloakroom floor renovation
Floating floor construction in prep for tiling , screwed and foamed down
May 2009
Our van of which we are proud of
All our latest contact numbers
AFTER
April 2009
Bathrooms Floors tiled, floor rebuilt, shower enclosure fitted.
WE ALWAYS REMOVE THE LOO PRIOR TO TILING FAR BETTER LOOK.
AFTER
July 2010
Old kitchen taken out and new kitchen put in.
new cabinets wood worktops oiled several times
BEFORE
July 2010
Old kitchen taken out and new kitchen put in.
the kitchen in thge making
AFTER
July 2010
Old kitchen taken out and new kitchen put in.
new cooker cabinets
BEFORE
July 2010
Old kitchen taken out and new kitchen put in.
the kitchen in the making
AFTER
July 2010
Old kitchen taken out and new kitchen put in.
new cabinets tiling with mosaic border new sockets going in
BEFORE
July 2010
Old kitchen taken out and new kitchen put in.
the new sinffrench heavy and high gloss white
AFTER
May 2010
Totally new kitchen.
tiling and cabinets looking good
AFTER
May 2010
Totally new kitchen.
the after
AFTER
May 2010
Totally new kitchen.
new extractortiling base and wall cabinets
AFTER
May 2010
Totally new kitchen.
the new kitchen tiling from us
BEFORE
May 2010
Totally new kitchen.
thexisting kitchen before
BEFORE
May 2010
Totally new kitchen.
the old kitchen
AFTER
May 2010
Totally new kitchen.
WORK IN PROGRESS
BEFORE
May 2010
Totally new kitchen.
THE KITCHEN BEFORE WE STARTED.
BEFORE
May 2010
Totally new kitchen.
THE KITCHEN BEFORE WE STARTED
BEFORE
May 2010
Bathroom and EnSuite
TILING
BEFORE
May 2010
Bathroom and EnSuite
carol still tiling with the big RUBI CUTTER
BEFORE
May 2010
Bathroom and EnSuite
new pan connector going on by graham its all in the detail.
BEFORE
May 2010
Bathroom and EnSuite
carol getting a grip of the tiling
BEFORE
May 2010
Bathroom and EnSuite
main bathroom. loo back to wall basin fully attended
AFTER
May 2010
Bathroom and EnSuite
new rad and valves loo back to wall new tile basin levelled
BEFORE
April 2010
Two complete bathrooms.
carol getting ready to demo. dust sheet about to seal the door.
AFTER
April 2010
Two complete bathrooms.
loo connections its a dirty job but someone got to do it
BEFORE
April 2010
Two complete bathrooms.
off with the old tiles.
BEFORE
April 2010
Two complete bathrooms.
carol and geoff our plumber sorting out the pipe work.
AFTER
April 2010
Two complete bathrooms.
new compact loo
BEFORE
April 2010
Two complete bathrooms.
adding extra wood studs to the metal studs modern house. graham with japanese saw
BEFORE
April 2010
Two complete bathrooms.
before
AFTER
April 2010
Two complete bathrooms.
new shower mira excel, tiles shoer cubicle loo
AFTER
April 2010
Two complete bathrooms.
shows new basin taploo tiling
AFTER
April 2010
Two complete bathrooms.
one of two bathrooms new tiletray loo shower cubicle.
AFTER
January 2010
Full bathroom refurb Tiling, plumbing, heated floor, shower installed, loo, bath and basin.
1800mm towel rail and bath the walls and floor fully tiled.
AFTER
January 2010
Full bathroom refurb Tiling, plumbing, heated floor, shower installed, loo, bath and basin.
semi ped, lite mirrorheated loo smooth sides. very clean look
AFTER
January 2010
Full bathroom refurb Tiling, plumbing, heated floor, shower installed, loo, bath and basin.
kudos cubicle with semi ped basin no pipes to be seen
BEFORE
January 2010
Full bathroom refurb Tiling, plumbing, heated floor, shower installed, loo, bath and basin.
cast iron drainage we altered this.
BEFORE
January 2010
Full bathroom refurb Tiling, plumbing, heated floor, shower installed, loo, bath and basin.
again more bare walls
BEFORE
January 2010
Full bathroom refurb Tiling, plumbing, heated floor, shower installed, loo, bath and basin.
th start of the job bare brick work
November 2009
Fit and decorate new bathroom
HARDI BACKER FRAMING GOING IN
December 2009
Remove old shower and tray reline stud wall retile and refit enclosure and shower
TILING STARTED OF TRAY ON HARDI BACKER CONCRETE BOARD
AFTER
November 2009
Fit and decorate new bathroom
new BETTE BATH STEEL FROM GERMANY 30YRS GUARANTEE.
AFTER
November 2009
Fit and decorate new bathroom
orginal valve reused. new tiling note new lightingfan
AFTER
November 2009
Fit and decorate new bathroom
complete new bathroom
December 2009
Remove old shower and tray reline stud wall retile and refit enclosure and shower
tray prep, new walls going up, with hardi backer on the left.
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
here is CAROL affixing hardi backer, note the new insulation celotex in studded wall,pressure treated wood used.
December 2009
day 5 on a kitchen refit
rangemaster installed, fire rated lights in, awaiting tiling
BEFORE
December 2009
day 1. kitchen rip out and refit
the complete job
BEFORE
December 2009
kitchen before day 1.
full kitchen rip out and new units etc etc.
AFTER
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
new floor tiledwallsloobasintapmirrorlights
BEFORE
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
the cloakroom before we started
AFTER
November 2009
Full bathroom and cloakroom refurbish, all new suites and tiling, hot floors etc
cloakroom.shades furniture,mirror,tiling,basin etc
AFTER
September 2009
Full bathroom installation, tiling suite, all plumbing
AFTER
September 2009
Full bathroom installation, tiling suite, all plumbing
finish job
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?