Sam Stevenson Carpentry Solutions
16
photos of recent work
My Profile
My Feedback (11)
My Photos (16)
February 2011
roof and dormer extension
Finished article before tiling. No felf was used as was external roof over balcony and was specified by client.
April 2011
Finished dormer before tiling
April 2011
Finished dormer
April 2011
Finished balcony roof from below
Shows structural oak crown beam construction
April 2011
balcony roof during tiling
April 2011
Completed tiling, front view
April 2011
Crown beam internal detail
April 2011
Oak wall plate and hand made brackets for balcony
April 2011
Front view of balcony brackets
April 2011
two way oak balcony bracket
braced both vertically and laterally to accomodate weight from above and side on force from externall staircase
April 2011
Front threshold of balcony installed
April 2011
Front threshold installed
April 2011
uprating existing joists to accomodate new living quarters above
triple and quadruple 12x3 c24 joists bolted at 500mm intervals
April 2011
Oak post to replace acros
April 2011
Completed balcony awaiting external staircase and handrail from joiners.
Photo showing tenon detail for pre morticed newel posts.
April 2011
Decking installed in balcony
Completed balcony ready for oak post to replace acros. Awaiting external staircase and handrail from joiners