Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Shakespeare Carpentry
55
work photos
My Profile
Page
My Customer
Feedback
My Photos
May 2011
Garden decking.
May 2011
Garden decking.
May 2011
Supplied and fitted laminate flooring with underlay and trim
April 2011
New Garden Fence with concrete gravel boards posts
AFTER
April 2010
New banister and stair rail.
AFTER
August 2010
Decking
December 2009
New stair spindles
December 2009
New stair spindles and handrail
July 2009
Studwork
Separated loft space into various rooms in accordance with architects plans
November 2009
Fit new door frame and door
AFTER
May 2009
internal doors
internal door before handles put on
May 2009
Loft Insulation
Celotex insulation in loft room
June 2011
Fitted newel posts, hand rail and spindels in hallway.
November 2009
Cupboard door fronts
August 2010
Laminate flooring laid to landing.
AFTER
October 2009
New Shiplap Fence
AFTER
April 2009
Fencing
Fencing with concrete posts and concrete gravel boards
May 2011
Raised area of decking linked to previous decking laid by Alistair.
May 2011
Raised area of decking linked to previous decking laid by Alistair.
May 2011
Supplied and fitted laminate flooring with underlay and trim
AFTER
March 2011
Supply and fit 5 doors. Supply and fit handrail, base rail and spindles to stairs
DURING
March 2011
Supply and fit 5 doors. Supply and fit handrail, base rail and spindles to stairs
AFTER
March 2011
Supply and fit 5 doors. Supply and fit handrail, base rail and spindles to stairs
AFTER
November 2010
To lay a wood floor and other work.
May 2009
New loft room floor
21mm tongue groove woodchip flooring
August 2008
van shelving
custom built shelving for works van
BEFORE
April 2009
Fencing
New garden fencing with concrete posts and concrete gravel boards
December 2009
Fixed spindles for stairs and a gate for the fence
Removed solid stair panels and insert new spindles
AFTER
December 2009
Build a cupboard for fuse box and meter
Cupboard designed to cover over the fuse box with a door to allow customer to view meter
AFTER
July 2009
Laid new solid wood flooring, fit new skirting boards and trim.
BEFORE
December 2009
Build a cupboard for fuse box and meter
Fuse box before work was completed
August 2009
door hanging
BEFORE
August 2009
Sorted out flooring, fitted a boxed area, flooring
AFTER
August 2009
Sorted out flooring, fitted a boxed area, flooring
April 2009
shelving
custom built shelving for lock up
October 2009
CdDvd storage shelving under stairs
BEFORE
October 2009
old Fence
AFTER
October 2009
Pipe boxings
AFTER
November 2009
Oak fire doors
Hung fire doors and fitted door furntiure
AFTER
May 2009
Platerboard Ceiling
New plasterboards put over existing ceiling
BEFORE
April 2010
New banister and stair rail.
April 2010
Laying of solid wood floor, skirting and architrave.
AFTER
April 2010
Laying of solid wood floor, skirting and architrave.
BEFORE
April 2010
Side gate and fencing.
AFTER
April 2010
Side gate and fencing.
AFTER
March 2010
Fitted 2 doors and the frame to an empty entrance
AFTER
June 2010
Garden bench hardwood slat replacement
AFTER
June 2010
MDF shelving unit
BEFORE
August 2010
Decking
AFTER
August 2010
Supply and fit internal door and loft ladder
July 2010
Replacement kitchen cupboard doors
replacement doors and matching wine racksplinths
July 2010
Construction of decking and framework support.
June 2010
Book cabinet make doors rehung skirting board done.
BEFORE
July 2010
Replaced kitchen cabinets, refurbished cabinet doors
AFTER
July 2010
Replaced kitchen cabinets, refurbished cabinet doors
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?