Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Simon Farmer Plumbing & Heating
28
photos of recent work
My Profile
My Feedback (93)
My Photos (28)
April 2010
My Services to you
AFTER
May 2012
Old boiler had packed up out with the old, in with the new
simple jobs like these take no longer than a day to do
BEFORE
May 2012
Took out a boiler dated 1973
Look how big the flue hole is...
DURING
May 2012
1st Fix pipe work
Changing from old vented system to combi
DURING
May 2012
New Combi Boiler
ready to be piped up
DURING
May 2012
My pipe work including a mag clean
I always install a magclean to help keep the system clean
AFTER
May 2012
commissioned and tested
All I have to do now is the condensate pipe and brick up the flue
AFTER
May 2012
New Hot Water Cylinder
Not many ppl know that copper cylinder have a shelf life and realise when its too late
AFTER
May 2012
New Limiting valve to an unvented system
the old one was leaking
AFTER
June 2010
PIC 4 Shower
Just another angle showing the shower...
BEFORE
May 2012
Was called to sort out this underfloor heating manifold
No option but to replace with a new one, no pic of that
January 2010
Installation of bathroom.
This was part of the first fix before suite was installed
AFTER
June 2010
PIC 3 Job done
Tiling finished and new shower installed perfect
BEFORE
June 2010
PIC 2 New pipework
Along with new wall, I replaced the copper pipework for the bath and shower
BEFORE
June 2010
PIC 1 No choice Rebuild wall
Couldnt tile on what I found, so rebuilt wall and bath frame
BEFORE
June 2010
Simple tiling job, or so I thought
Once I took the top layer off I found all sorts of damp problems
AFTER
November 2009
Leaking tap.
It was beyond economical repair so new one was installed
AFTER
September 2009
New Bathroom Suite
AFTER
January 2010
Last pic of same job
This was upstairs so had to take up existing floor
AFTER
January 2010
Same job
Just more rads to do
AFTER
January 2010
Adding more radiators to existing system
Had to chase in concrete floor
AFTER
September 2009
Customer very pleased with the result
AFTER
September 2009
There Last stage
All done, last minute touches to do
AFTER
May 2012
Same bathroom
AFTER
May 2012
Loved doing this bathroom
AFTER
May 2012
Same bathroom
different angle
BEFORE
September 2009
Stage two of bathroom
Wall repaired, plumbing done and starting tiling before bath went in
BEFORE
September 2009
Stripped out bathroom and rotten walls ready for suite
The bath had leaked for ages, alot of prep work was needed
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?