Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Smart Building Services S.E Limited
431
work photos
My Profile
Page
My Customer
Feedback
My Photos
November 2009
Great job Glass Lean-to and good brickwork bring this house back to life.
Lovely old Stock facework, with Orange brick soldier course.
November 2009
We built both Dormers, Conservatory and Extension..
Two loft Extensions, one Conservatory one Extension.
November 2009
Loft Extension Rear Extension.
Dormer with Juliet balcony, Extension with large sliding doors and Yorkstone patio.
October 2009
Loft conversion refurbishment.Exterior paint.
Full loft conversion, retiled and painted.
November 2009
Great Gable. great house.
Lovely house built with Rochester Blend bricks.
November 2009
Tiling and garden Wall.
Victorian pathway with old stocks and nice copings.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
November 2010
Interior painting whole house.
November 2009
I built this wall with Rochester blend bricks,colourful.
we used Rochester blend bricks, and we raked the joints.
April 2009
Victorian tiling laid in hallway during house refurbishment.
March 2008
I done this bathroom in porcelain tiles.
This natural stone and porcelain bathroom was put on another firms brochure
November 2009
I tiled this hallway with a Victorian pattern tile.
Victorian tiles, hard but lovely finish.
January 2012
150 foot fence and demolition of existing boundary wall
January 2012
Large boundary wall.
January 2012
Large boundary wall.
January 2012
Large boundary wall.
January 2012
Large boundary wall.
January 2012
Large boundary wall with segmental arch.
January 2012
150 foot fence with post caps and ball finials
January 2012
150 foot fence and cabling fixed to rear.
January 2012
150 foot fence and demolition of existing boundary wall
January 2012
150 foot fence and demolition of existing boundary wall
December 2011
Base concreted and DPM and DPC installed.
December 2011
View to the extension area, floor runs through the old threshold.
December 2011
Interior completed, floor laid and leveled with existing room.
December 2011
Remove existing conservatory, build extension level with existing room.
DURING
December 2011
Remove existing conservatory, build extension level with existing room.
December 2011
Remove existing conservatory, build extension level with existing room.
December 2011
Remove existing conservatory, build extension level with existing room.
December 2011
Remove existing conservatory, build extension level with existing room.
AFTER
December 2011
Remove existing conservatory, build extension level with existing room.
August 2009
Two storey extension.
A look up at the soffit and fascia, and the Finial piece.
February 2010
Single extension to rear of house
Construction nearly completed, awaiting pointing when weather changes.
November 2009
I done this toothed brickwork and corbaling in red rubber bricks.
Toothed Orange rubbers.
November 2009
I built this Garden wall.with a brick on edge and creasing tile.
Anice brick, we used creased tiles and brick on edge.
December 2011
Communal refurbish to 2 blocks of flats in Putney
Terrazo floor.
December 2011
Communal refurbish to 2 blocks of flats in Putney
Newly polished terrazo floor.
December 2011
Communal refurbish to 2 blocks of flats in Putney
new alarm system and new communal lighting.
December 2011
Communal refurbish to 2 blocks of flats in Putney
December 2011
Communal refurbish to 2 blocks of flats in Putney
Newly refurbished.
December 2011
Communal refurbish to 2 blocks of flats in Putney
December 2011
Communal refurbish to 2 blocks of flats in Putney
December 2011
Communal refurbish to 2 blocks of flats in Putney
new stair nosings, carpet, painted metal work and handrail
October 2011
Balcony water proofing and tanking.
October 2011
Balcony water proofing and tanking.
October 2011
Balcony water proofing and tanking.
Black Asphalt paint for waterproofing.
October 2011
Balcony water proofing and tanking.
Balcony floor covered in coloured tanking paint
September 2011
Refurbish to 2 blocks of flats in Fulham.
New 2 hour fire rated doors, intumiscent strips and beading
September 2011
Refurbish to 2 blocks of flats in Fulham.
September 2011
Refurbish to 2 blocks of flats in Fulham.
All walls painted and woodwork painted.
September 2011
Refurbish to 2 blocks of flats in Fulham.
New signage, alarm system and electrical system
September 2011
Refurbish to 2 blocks of flats in Fulham.
September 2011
Refurbish to 2 blocks of flats in Fulham.
September 2011
Refurbish to 2 blocks of flats in Fulham.
September 2011
Refurbish to 2 blocks of flats in Fulham.
September 2011
Refurbish to 2 blocks of flats in Fulham.
September 2011
Refurbish to 2 blocks of flats in Fulham.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
New carpet, nosings.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
All relevant safety signage relevant to British standards.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
New fire alarm system and sensored light switches
September 2011
Refurbishment of communal areas of 2 blocks of flats.
New electrical system boxed in and painted.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
September 2011
Refurbishment of communal areas of 2 blocks of flats.
New Obex matting for the lobby.
August 2011
Kitchen painting and new engineered wood flooring
November 2009
Bubble bathroom.
Natural stone Pebble Mosaic.
August 2011
Kitchen painting and new engineered wood flooring
August 2011
Kitchen painting and new engineered wood flooring
April 2009
Renovationdecoration.
August 2011
Kitchen painting and new engineered wood flooring
April 2011
Flatten and relay garden.
April 2011
Flatten and relay garden, make decking install new fence shed.
May 2011
Rubber roofing and fascia guttering
May 2011
Rubber roofing and fascia guttering
May 2011
Rubber roofing and fascia guttering
April 2010
Indian Sandstone patio slabs laid to create pathway and steps.
Steps slabbed and little retaining edges inserted. Awaiting posts,
May 2011
Rubber roofing and fascia guttering
view showing the quick trim system.
February 2011
Internal cut formflash covers internal pigs ear.
April 2011
Refurbishment of hallway, kitchen and hall, painted and new stainless steel end panel.
April 2011
New celar door made, boards stained finished.
April 2011
new floor boards sanded and stained.
April 2011
plastered, painted.
April 2011
new switches and sockets.
April 2011
New turf heavy duty open boarded fencing.
April 2011
new open boarded fencing.
April 2011
laying of patio.
April 2011
new sandstone patio with recessed manhole cover.
April 2011
decking with Led lighting and new turf.
April 2011
decking new fence removel of raised patio and laying of new turf and patio.
March 2011
Victorian tiling to pathway and new recessed manhole cover
March 2011
Victorian tiling to pathway and new recessed manhole cover
March 2011
Victorian tiling to pathway and new recessed manhole cover
March 2011
Victorian tiling to pathway and new recessed manhole cover
March 2011
Victorian tiling to pathway and new recessed manhole cover
March 2011
Tiling.
March 2011
Tiling.
March 2011
Tiling.
March 2011
Tiling.
February 2011
Roof repairs and replacement of wooden gable with plastic.
February 2011
Roof repairs and replacement of wooden gable with plastic.
February 2011
Roof repairs and replacement of wooden gable with plastic.
February 2011
Roof repairs and replacement of wooden gable with plastic.
February 2011
Roof repairs and replacement of wooden gable with plastic.
March 2011
Installation of pocket fence and gate.
March 2011
Installation of pocket fence and gate.
March 2011
Installation of pocket fence and gate.
March 2011
Installation of pocket fence and gate.
March 2011
Installation of pocket fence and gate.
March 2011
Installation of picket fence and gate.
February 2011
looking up to the top level of the rubber roof.
February 2011
ridge tiles layed onto tiles to protect the top of the parapet wall.
February 2011
Formflash cut into circles to dress around corners.
February 2011
formflash strip covers join.
February 2011
water runs down slope and runs around the corner into gutter.
February 2011
View down the sloped area..
February 2011
looking down to the lower level.
February 2011
Rubber roof with ridge tiles and creasing tiles on parapet wall.
November 2010
Interior and front doorway painting - whole house.
November 2010
Interior painting whole house.
November 2010
Interior whole house.
BEFORE
April 2011
Stripped and ready for new timber.
April 2011
new floor boards before sanding.
November 2010
Interior painting whole house.
November 2010
Interior whole house.
November 2010
Interior and front doorway painting whole house.
November 2010
Interior whole house.
November 2010
Interior whole house.
November 2010
Interior whole house.
November 2010
Upper landing area whole house.
November 2010
Interior bedroom in olive.
October 2010
Rubber roof
April 2009
Renovationdecoration.
April 2009
Renovationdecoration.
April 2009
Renovationdecoration.
BEFORE
April 2011
Refurbishment of hallway, kitchen and hall
April 2011
Me doing the decking.
April 2009
Renovationdecoration.
April 2009
Renovationdecoration.
April 2009
Renovationdecoration.
April 2009
Renovationdecoration.
April 2009
Victorian tiled bathroom floor.
November 2009
Retaining wall and fencing. with Brick on edge and creasing tile.
Retaining wall with Fence. rochester blend bricks create a lovely colour.
AFTER
October 2008
Refurbishment
November 2009
Loft conversion, Mineral felt roof covering.
Green mineral felt applied to flat roof.
AFTER
October 2008
Refurbishment
Finished kitchen.
April 2010
New roof and guttering and painted brickwork.
New roor tiling and white UPVC fascia, soffit and guttering.Masonry paint. ( awaiting windows )
BEFORE
October 2008
Refurbishment
About to remove cupboards, and repaint bedroom.
May 2009
Small but nice decking area..
Small area of Decking.
BEFORE
October 2008
Refurbishment
kitchen midway through installation.
November 2009
I built this gable with Rochester blend bricks.
Great looking gable built with Rochester blend bricks.
AFTER
October 2008
Refurbishment
new cupboards made and repainted walls, new lights.
November 2009
Loft conversion.
Hung tiled dormer.
October 2009
Loft conversion refurbishment.
Rear view of Dormer, no window yet waiting on window fitters.
BEFORE
October 2008
Refurbishment
Were about to brighten this room up.
May 2009
Limestone floor, in large flagstones.
600 x 300mm Limestone tiles, great natural look.
November 2009
Job finished, windows have not arrived yet?
Leanto extension, from blockwork, rendered with copings on the Parapet wall.
AFTER
October 2008
Refurbishment
Wall removed, a lick of paint and some new fittings and worktop.
October 2009
Loft conversion refurbishment.
Dormer with Hung tiles.
October 2009
Loft conversion refurbishment.
Finished plaster, With two Velux windows.
March 2011
Victorian tiling to pathway and new recessed manhole cover
November 2009
Build only,waiting for windows.
Stockwork with soldier course.
BEFORE
October 2008
Refurbishment
Old wall being removed.
November 2009
Brick wall.
Red bricks with brick on edge capping creasing tile detail.
November 2009
Raised patio.
Concrete block raised patio with block and beam floor creating a large storage area.
November 2009
Its me
Single skin retaining wall backed up by Hblocks filled with concrete and reinforced.
BEFORE
April 2011
Refurbishment of hallway, kitchen and hall
May 2009
Oak Flooring.
Engineered Oak laminate.
October 2009
Gable end built on Loft conversion in Stock brickwork.
New Stock gable wall.
November 2009
Metal Mosaic tiling.
Modern finish.
April 2009
Renovationdecoration.
April 2009
Renovationdecoration.
victorian tiled floor, with fresh paint and new carpet.
April 2009
Renovationdecoration.
Refurbed fireplace with new tiling, and new painting.
April 2009
Renovationdecoration.
Bedroom fireplace refurbished and bedroom repainted.
November 2009
Large demolition rebuild. Finished picture to follow.
Near total demolition and rebuild, with major steelwork and total refurb.
June 2009
Demolition completed, the rebuild starts.
October 2009
Loft conversion refurbishment.
October 2009
Loft conversion refurbishment.
Just tiled, waiting for winow fitters.
June 2009
Loft conversion and back extension
Rear of house prior to demolition and rebuild.
June 2009
The structural work begins.
Now the footings and pads have been poured we begin assembling the steel frame.
June 2009
This is me putting in the steelwork for a large open plan extension.
The big boys start the heavy work.
June 2009
Loft conversion and back extension
Steel columns now supporting first floor.
June 2009
Loft conversion and back extension
Joists now in ready for the next lift.
June 2009
Loft conversion and back extension
First floor complete, now for the loft.
BEFORE
April 2011
Refurbishment of hallway, kitchen and hall
June 2009
Interior walls now start being built.
Putting some structure back into the house. Ground floor.
June 2009
Loft conversion and back extension
Building the first floor.
June 2009
Starting the pitched front roof.
Creating the timber work for the flat roof, and the small dummy pitched roof.
June 2009
First floor studwork .
The start of the first floor.
June 2009
Loft conversion and back extension
Laying the Warmdeck onto the flat roof.
June 2009
Loft conversion and back extension
Flat roof covered with plywood, ready for a Rubber roof covering. Also view of boxed gutter to the right.
June 2009
Loft conversion and back extension
Crank beams in place.
June 2009
Loft conversion and back extension
Rafters in place.
November 2009
Loft conversion.
Tile hung dormer, please excuse the ladder.
November 2009
Loft conversion.
Plaster not quite dry yet.
November 2009
Loft conversion.
Due to the property being terraced, the location of the soil pipe is in the best location because of where the bathroom is. We didnt install the stack, the bend should of bent above the lead workPlumbers
November 2009
Steel laid on a spreader plate in a loft i am converting.
Steels in place on spreader plates.
November 2009
Loft conversion.
Early stages.
August 2009
Two storey extension.
Sockwork Gable with orange rubbers creating the segmental arches.
August 2009
Two storey extension.
The first steel column is bolted into place onto a concrete pad 1 cubic mtr.
August 2009
Two storey extension, steel post laid on spreader and incased in concrete.
Upclose view of bolt detail for Inspectors approval.
August 2009
Two storey extension.
The rear has been demolished, so the kitchen has had a temporary wall built to keep the clients safe.
August 2009
Two storey extension.
Coining work, red bricks coined into Stock bricks.
August 2009
Two storey extension.
The rear has gone, scaffold ready for the build.
August 2009
Two storey extension.
View of culumn from above before the first floor starts.
August 2009
Two storey extension.
Steel column, furfix wallstarters Hilti gunned to tie into block wall.
August 2009
Two storey extension.
First floor phase of steel erection in place.
August 2009
Two storey extension.
Matching existing Corbled brickwork with Dog toothed brickwork feature
August 2009
Two storey extension.
What a great finish to a lovely house.
December 2009
Tiled front path with Victorian tiles, built front brick wall with piers, laid shingle to front gard
Nice Old Stocks with a Victorian pathway. Very nice look.
December 2009
Tiled front path with Victorian tiles, built front brick wall with piers, laid shingle to front gard
A look from the doorway down the pathway.
December 2009
Tiled front path with Victorian tiles, built front brick wall with piers, laid shingle to front gard
Pointing the brickwork.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Freshly pointed and finished, just tarmacking to do.
November 2009
Loft conversion.
We have made a hole in the roof, now we start the conversion.
November 2009
Loft conversion.
Steel beam and wood structure in place, ready for insulation.
November 2009
Loft conversion.
Studwork in place, loft ready for insulating then plasterboarding.
November 2009
Loft conversion.
Boarded ready for plastering.
August 2009
Two storey extension.
steel beam conected to a smaller beam to spred the load.
August 2009
Two storey extension.
Timber bolted into the steel webbing, joists fixed to timber with straps.
August 2009
Two storey extension.
Another view of joists.
August 2009
Two storey extension.
Red brick arches in, stockwork continues up to the gable.
August 2009
Two storey extension.
A view over joists to the existing house.
August 2009
Two storey extension.
8x2 joists in place on the wall plate, cut and ready for the rafters to be fixed.
August 2009
Two storey extension.
Rafters in place and installed to the same pitch as the old rafters.
August 2009
Two storey extension.
Close up of the Wood Sash windows.
October 2009
Loft conversion refurbishment.
gable being built.
October 2009
Loft conversion refurbishment.
Studwork in place.
October 2009
Loft conversion refurbishment.
Roof fly felted ready for the storm approaching
October 2009
Loft conversion refurbishment.
Steel and studwork.
October 2009
Loft conversion refurbishment.
Studwork finished ready for insulating and boarding.
May 2009
Bathroom suite and tiling.
Natural stone mosaic shower room, a great look.
May 2009
Bathroom suite and tiling.
Sandstone tiling around bath.
May 2009
Bathroom suite and tiling.
Sandstone effect shower.
May 2009
Bathroom suite and tiling.
Bathroom fittings installed.
November 2009
Loft conversion.
The dormer has just been covered in plywood.
November 2009
Loft conversion.
Velux windows installed, plastering finished ready for painting.
November 2009
Light fittings
Me checking the corner is level.
November 2009
Light fittings
Retaining boundary wall from a distance. We done the fencing as well.
November 2009
Light fittings
A close up view before we raked out the mortar.
November 2009
Loft conversion.
Plastering finished.
November 2009
Loft conversion.
Front view of Dormer
December 2009
Building work, extension and roofing
Start of first floor blockwork showing a cavity tray.
December 2009
Building work, extension and roofing
View of blockwork from inside.
December 2009
Building work, extension and roofing
Finished blockwork, roof timbers finished felt, battened fascia and soffit finished ready for finishing with white UPVC and guttering.
December 2009
Building work, extension and roofing
Another view of the blockwork and window opening.
December 2009
Building work, extension and roofing
Another view of interior.
December 2009
Building work, extension and roofing
Me building some internal walls.
December 2009
Building work, extension and roofing
Openings completed.
December 2009
Building work, extension and roofing
begining construction of flat roof.
December 2009
Building work, extension and roofing
Aerial view of the flat and the Dome window openings.
December 2009
Building work, extension and roofing
December 2009
Building work, extension and roofing
the rafters are in place and the hip is formed.
December 2009
Building work, extension and roofing
aview looking up at the dormers.
December 2009
Building work, extension and roofing
Starting to tile the front roof.
December 2009
Building work, extension and roofing
Side of the roof felt and battened.
December 2009
Building work, extension and roofing
Flat roof covered in plywood ready for 100mm warmdeck.
December 2009
Building work, extension and roofing
The roof showing the warmdeck laying.
December 2009
Building work, extension and roofing
The Warmdeck roof is finished, plywood coveutter.rs everything ready for a Rubber covering. Also a view of the box g
December 2009
Building work, extension and roofing
An internal view of the crank beams and rafters.
December 2009
Building work, extension and roofing
Crank beams before construction of timberwork.
December 2009
Building work, extension and roofing
Rafters.
December 2009
Building work, extension and roofing
Internal view of dormers.
December 2009
Building work, extension and roofing
Me laying some tiles before the Velux opening is made.
December 2009
Building work, extension and roofing
Small pitch midway through being tiled.
December 2009
Building work, extension and roofing
Groundfloor showing electrical work before dot dabbing.
December 2009
Building work, extension and roofing
First floor studwork.
December 2009
Building work, extension and roofing
Studwork.
December 2009
Building work, extension and roofing
First floor walls with fresh plaster.
December 2009
Building work, extension and roofing
First floor bedroom with a coat of plaster.
December 2009
Building work, extension and roofing
Room awaiting plaster.
April 2009
Renovationdecoration.
Bedroom finished.
February 2009
Bathroom installation and tiling.
Bathroom wall tiled.
February 2009
Bathroom installation and tiling.
A view of the shower area.
February 2009
Bathroom installation and tiling.
Close up of floor tiling.
February 2009
Bathroom installation and tiling.
View of shower area.
October 2009
Floor tiling.
Floor in early stages of tiling.
October 2009
Floor tiling.
Floor finished and cleaned.
October 2009
Floor tiling.
Close up view of floor.
October 2008
Refurbishment
Front room after basecoat.
October 2008
Refurbishment
View looking down front room into the conservatory.
October 2008
Refurbishment
Starting to install bathroom suite.
October 2008
Refurbishment
bathroom suite installed, painted and tiled.
February 2009
Bathroom installation and tiling.
Walls and floor tiled, shower tray installed ready for screen.
February 2009
Bathroom installation and tiling.
A timber frame built to support the bath, Wedi board tiled over in shower area.
May 2009
Renovations and major structural work.
Kichen fitted and tiled.
May 2009
Renovations and major structural work.
New bathroom suite installed and tiled.
May 2009
Renovations and major structural work.
Porcelain tiled floor.
May 2009
Renovations and major structural work.
May 2009
Renovations and major structural work.
Another view of floor.
May 2009
Renovations and major structural work.
May 2009
Renovations and major structural work.
Close up of Chrome mosaic tiling in utility room.
May 2009
Renovations and major structural work.
Diagonal 4 Ceramic tiles and a view of under unit lighting.
May 2009
Renovations and major structural work.
Kitchen floor.
June 2009
Loft conversion and back extension
Yorkstone patio.
June 2009
Loft conversion and back extension
June 2009
Loft conversion and back extension
Steel beam and crank beam in place.
June 2009
Loft conversion and back extension
Circular honeycomb brickwork soakaway for rainwater.
June 2009
Loft conversion and back extension
Close up showing depth.
June 2009
Loft conversion and back extension
Roof timbers in place ready for felting.
June 2009
Loft conversion and back extension
Sides built and returns stopped to sliding door measurement.
June 2009
Loft conversion and back extension
Roof ready for stripping.
June 2009
Loft conversion and back extension
Old tiles stripped, now we will remove old battens and rafters.
June 2009
Loft conversion and back extension
Timbers removed ready for new timberwork.
June 2009
Loft conversion and back extension
New ridgebeam and rafters in place ready to form dormer.
June 2009
Loft conversion and back extension
Rafters trimmed and ready for felt and battening. opening ready for Velux window.
June 2009
Loft conversion and back extension
Internal view of dormer.
June 2009
Loft conversion and back extension
The dormer is formed and covered in plywood ready for felting.
June 2009
Loft conversion and back extension
Dormer complete, rafters formed and ready for felt and battening.
June 2009
Loft conversion and back extension
Roof of dormer tiled and Dean discussing the next move.
June 2009
Loft conversion and back extension
The roof timbers are complete and ready for felting.
June 2009
Loft conversion and back extension
Roof felt and battened ready for tiling.
June 2009
Loft conversion and back extension
Roof and dormer tiled.
June 2009
Loft conversion and back extension
Roof tiled and Velux window inplace.
June 2009
Loft conversion and back extension
The front pitch tiled ready for the hips, the ridges are on.
February 2010
Single extension to rear of house
The excavation begins
February 2010
Single extension to rear of house
February 2010
Single extension to rear of house
Drainage in, setting out done and blockwork below damp filled and flaunched.
February 2010
Single extension to rear of house
Beam sat on two 1mtr3 pads to avoid any damage to next doors property.
February 2010
Single extension to rear of house
steel beam wrapped in mesh and cast in concrete.
February 2010
Single extension to rear of house
150mm hardcore and 100mm scalpings wacked down and blinding starts.
February 2010
Single extension to rear of house
Oversite blinded with sand to avoid puncturing the membrane.
February 2010
Single extension to rear of house
Membrane lapped over DPM and 100mm Celotex insulation laid.
February 2010
Single extension to rear of house
100mm cavity insulation inserted to meet at the same level as the celotex.
February 2010
Single extension to rear of house
the first couple of courses have been blackjacked as an extra precaution due to external floor levels.
February 2010
Single extension to rear of house
Cavity tray DPM used to prevent any damp from breaching the cavity.
February 2010
Single extension to rear of house
Cavity tray.
February 2010
Single extension to rear of house
Brickwork and blockwork half way up.
February 2010
Single extension to rear of house
Cavity lintels on and red rubber bricks used for soldier course.
February 2010
Single extension to rear of house
Old stock brickwork up to parapet hight and faked to to degree weather.
February 2010
Single extension to rear of house
Cavity closed off with 100mm cavity closures.
February 2010
Single extension to rear of house
Roof timbers being formed and trimmed for the roof dome window.
February 2010
Single extension to rear of house
Opening formed and steel used and sat on padstones.
February 2010
Single extension to rear of house
New toilet room formed and plastered.
February 2010
Single extension to rear of house
Feeds for radiators lagged prior to screeding.
February 2010
Single extension to rear of house
Roof timbers finished, doors in and dome being installed.
February 2010
Single extension to rear of house
February 2010
Single extension to rear of house
Upstands made, warmdeck laid and dome construction begins.
February 2010
Single extension to rear of house
view looking up at the dome window.
February 2010
Single extension to rear of house
Drainage connection for rain water.
February 2010
Single extension to rear of house
Rainwater gully fixed to wall to collect water from the box gutter.
February 2010
Single extension to rear of house
DPM laid over cavity prior to coping stones being laid.
February 2010
Single extension to rear of house
Dome finished, coping stones finished and fibreglass roof covering finished.
February 2010
Single extension to rear of house
walls and ceiling being plasterboarded.
February 2010
Single extension to rear of house
Interior plastered and painted, radiators on and downlights in awaiting finish coat.
February 2010
Single extension to rear of house
A look at at the finished dome.
February 2010
Single extension to rear of house
Kitchen stripped awaiting new kitchen and floor.
October 2010
Flat roof maintenance, floor tiling, interior decorating
October 2010
Flat roof maintenance, floor tiling, interior decorating
October 2010
Flat roof maintenance, floor tiling, interior decorating
October 2010
Flat roof maintenance, floor tiling, interior decorating
Bedroom walls and all woodwork painted.
October 2010
Flat roof maintenance, floor tiling, interior decorating
Kitchen ceiling and walls painted in matt emulsion.
October 2010
Flat roof maintenance, floor tiling, interior decorating
Front room shelving painted in satinwood.
October 2010
Flat roof maintenance, floor tiling, interior decorating
October 2010
Flat roof maintenance, floor tiling, interior decorating
October 2010
Flat roof maintenance, floor tiling, interior decorating
Front room walls and woodwork painted.
October 2010
Flat roof maintenance, floor tiling, interior decorating
Bedroom painted in white emulsion.
October 2010
Flat roof maintenance, floor tiling, interior decorating
Woodwork and walls painted down lower staircase.
October 2010
Flat roof maintenance, floor tiling, interior decorating
All woodwork and walls painted down the stairs.
October 2010
Flat roof maintenance, floor tiling, interior decorating
Book shelving and bannister painted in satinwood.
October 2010
Flat roof maintenance, floor tiling, interior decorating
Bathroom painted.
October 2010
Flat roof maintenance, floor tiling, interior decorating
Bathroom floor tiled.
October 2010
Rubber roof
Rubber dressed up and over the upstands for maximum protection.
October 2010
Rubber roof
October 2010
Rubber roof
Internal corner covered with circular flashband for protection.
October 2010
Rubber roof
Joint covered with rubber flashband, and corner covered with circular flashband.
October 2010
Rubber roof
Drain outlet covered.
October 2010
Rubber roof
Drain outlet shroud inserted into hole and glued, ready to be covered by the rubber sheet.
October 2010
Rubber roof
Rubber dressed over and down the gully.
October 2010
Rubber roof
Finished Firestine rubber roof, awaiting large dome.
October 2010
Flat roof maintenance, floor tiling, interior decorating
Rubber dressed over the fascia and glued.
October 2010
Flat roof maintenance, floor tiling, interior decorating
October 2010
Flat roof maintenance, floor tiling, interior decorating
Finished Firestone rubber roof.
June 2010
House refurbishment exterior landscaping.
Staircase and ballusters fitted along with handrail.
June 2010
House refurbishment exterior landscaping.
June 2010
House refurbishment exterior landscaping.
June 2010
House refurbishment exterior landscaping.
June 2010
House refurbishment exterior landscaping.
June 2010
House refurbishment exterior landscaping.
June 2010
House refurbishment exterior landscaping.
June 2010
House refurbishment exterior landscaping.
June 2010
House refurbishment exterior landscaping.
October 2010
Tiling in kitchen
October 2010
Tiling in kitchen
October 2010
Tiling in kitchen
Corners finished with chrome trim.
October 2010
Tiling in kitchen
Brick bonded corners.
October 2010
Tiling in kitchen
Brick bonded with a natural stone border.
September 2010
Replacement roof and insulation
Finished, ridges on, pointed and lead completed.
September 2010
Replacement roof and insulation
Side view showing the sweeping valley.
September 2010
Replacement roof and insulation
Getting ready to put the ridges on and work our way down.
September 2010
Replacement roof and insulation
Working our way across the roof.
September 2010
Replacement roof and insulation
Extra tarpulins for protection.
September 2010
Replacement roof and insulation
Old roof stripped, new felt and battens.
June 2010
House refurbishment exterior landscaping.
Bedroom 2 completed.
June 2010
House refurbishment exterior landscaping.
Bedroom 1 painted and carpeted.
June 2010
House refurbishment exterior landscaping.
Utility room completed and tiled.
June 2010
House refurbishment exterior landscaping.
Ceiling finished and painted, kitchen completed.
June 2010
House refurbishment exterior landscaping.
Kitchen finished, painted and marble floor polished.
June 2010
House refurbishment exterior landscaping.
Kitchen completed.
June 2010
House refurbishment exterior landscaping.
Bathroom completed.
June 2010
House refurbishment exterior landscaping.
Main bathroom tiled and completed.
June 2010
House refurbishment exterior landscaping.
Bathroom completed.
June 2010
House refurbishment exterior landscaping.
En-suite tiled and suite fitted.
June 2010
House refurbishment exterior landscaping.
Painted, landscaped, finished.
June 2010
House refurbishment exterior landscaping.
Retaining flower bed, rendered and painted.
June 2010
House refurbishment exterior landscaping.
Retaining flower bed.
June 2010
House refurbishment exterior landscaping.
Building works completed, driveway blockpaved.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Steps freshly pointed.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Steps finished and pointed.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Copings on, steps slabbed awaiting pointing. Ive just finished the handrails.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Side view not ironed up yet.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
laying the bricks to support the steps.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Copings on and steps completed ready for slabbing.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Brickwork, fencing and lighting in place.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Top steps being completed.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
firsts steps casted and reinforced, posts set and brickwork bond being worked out.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Setting out the shuttering etc
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Starting to remove soil so we can make shuttering for new steps.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Gable end verge repointed from the ridg down, new plastic cladding used.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
New UPVC cladding being applied.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
New whith square UPVC guttering, fascia, soffit and downpipes.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
New concrete pantiles laid.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
New breathable felt applied in time for rain.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Rafter feet cut and a piece of timber added to facilitate the application of the soffit.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
New extended rafters timberlocked to old rafters.
June 2009
Loft conversion and back extension
Dormer with Hung tiles. Rear extension and Patio.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Old rafters exposed and concrete guttering removed.
April 2010
Roof and gutter repairs, brickwork, landscaping and painting
Before facelift, with precast concrete guttering.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?