0845 408 4866
Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Stephen G Webb Ltd
102
work photos
My Profile
Page
My Customer
Feedback
My Photos
My Videos
January 2009
All types of doors, purpose made, standard, hardwood, softwood
January 2009
Freestanding or fitted furniture undertaken
January 2009
All types of stair work,new, refurbish,hardwood or softwood
July 2010
Refurbishment work
Refurbish sliding sashes, repair work and full decoration
January 2009
All types of purpose made furniture undertaken.
January 2009
Purpose made windows, vac treated for long life, or we fit high spec windows presprayed and glazed.
January 2009
Detail
November 2010
Fitted wardrobes almost complete
Purpose built wardrobe
November 2010
Black gloss shelving
Black gloss furniture
November 2010
Oak staircase
On site fitting service
November 2010
Oak staircase
On site fitting service
January 2009
Detail
AFTER
November 2011
Supply and fit timber bifold doors.
AFTER
November 2011
Supply and fit purpose made Oak staircase
AFTER
November 2011
Oak handrail
We dont want to leave this job
AFTER
November 2011
Oak handrail
Steve put a lot of work into his handrail
AFTER
November 2011
Replacement oak staircase
Steve, Liam and Martin made a beautiful job of fitting this staircase.
AFTER
November 2011
Replacement oak staircase
Looking good
DURING
November 2011
Replacement oak staircase
DURING
November 2011
Replacement oak staircase
Taking shape
DURING
November 2011
Replacement oak staircase
Steve working on the handrail
BEFORE
November 2011
Replacement oak staircase
Out with the old spiral staircase
AFTER
July 2011
Remove existing hand rail, balustrade and replace with modern fusionoak range.
Just needs the existing woodwork repainted.
DURING
July 2011
Replacement balustrade
Nearly there note the purpose made oak trim on the wall side to compliment the other side.
BEFORE
July 2011
Replacement balustrade
Dated timber spindles, poorly fitted
AFTER
August 2011
Hardwood door and frame
Fully decorated, warm and cosy
DURING
August 2011
Hardwood door and frame
All manufactured, fitted and undercoat applied, note very thin double glazing and no letter plate.
BEFORE
August 2011
Hardwood door and frame
Close inspection shows rot in the door and frame, also poor fit and single glaze.
AFTER
July 2011
Supply and fit modern front door and side light.
AFTER
July 2011
Supply and fit modern front door and side light.
AFTER
July 2011
Supply and fit modern front door and side light.
AFTER
June 2011
All fitted
New frame, door and fitting, toughened glass and painted, note the oak cill
DURING
June 2011
Vactreating
This door is manufactured using quality pinewood, it is shown hear being vactreated to give a very long life.
BEFORE
June 2011
Replacment front door and frame
Old door and frame seen better days customer not happy with the design either.
AFTER
March 2011
Rotten porch
Almost finished, ,needs a good paint now, to be carried out by the customer.
DURING
March 2011
Rotten porch
We are getting there, note new door now lines up with sashes
DURING
March 2011
Major repair work carried out.
Here we go !!
BEFORE
March 2011
Rotten porch
I think its ready for some work
BEFORE
March 2011
Very rotten porch
BEFORE
March 2011
Rotten porch, needs some work!!
Note: the door lines do not line up with the glass lines of the sashes.
AFTER
March 2011
Shelf and boarding
Small job, supply and fit additional shelving and bead and butt style boarding.
AFTER
April 2011
Supply and fit bespoke oak frame, windows, door and porch
AFTER
April 2011
Supply and fit bespoke oak frame, windows, door and porch
Just the lead to go
AFTER
April 2011
Supply and fit bespoke oak frame, windows, door and porch
Just the lead to go
BEFORE
April 2011
Replacment oak door and frame
The existing door and frame
April 2011
Oak door, frame and porch
Just waiting for the lead work
April 2011
Oak door, frame and porch
Just waiting for the lead work
April 2011
Our joinery workshop
Our joinery workshop
April 2011
Our joinery workshop
Our joinery workshop
April 2011
On site work
On site carpenters replacing windows
April 2011
Bespoke oak stairs
More oak stairs in the making
April 2011
Oak stairs
Bespoke oak staircase
April 2011
Oak stairs
Bespoke oak staircase
April 2011
Oak stairs
Bespoke oak staircase
AFTER
February 2011
New windows, as requested as near to existing as possible
Double glazed, pre finished and better security
AFTER
February 2011
New windows, as requested as near to existing as possible
Double glazed, pre finished and better security
AFTER
February 2011
New windows, as requested as near to existing as possible
Double glazed, pre finished and better security
DURING
February 2011
Out with the old
The two Martins remove the windows taking care of customers property
BEFORE
February 2011
Old windows
Single glazed, not very secure and starting to rot
BEFORE
February 2011
Old window, single glazed
March 2011
Fitted cupboards
Simple push catches and no visible handles as requested
March 2011
Fitted cupboards
Simple push catches and no visible handles as requested
May 2010
Replacement sashes and other joinery
Replacement sashes, conservation glass and full decoration to follow
May 2010
Replacement sashes and decoration
Replacment sashes, conservation glass and full decoration
February 2010
Supply and fit oak flooring
March 2010
Purpose build shelving
Supply and fit shelving for a paint finish
August 2010
Supply and fit tradition windows, refurbish sliding sashes, repair work
We also carried out the replacment of the veranda and glass
August 2010
Supply and fit tradition windows, refurbish sliding sashes, repair work
August 2010
Supply and fit tradition windows, refurbish sliding sashes, repair work
Also included is full decoration
September 2009
Supply and fit replacement, hispec windows finished in French grey.
AFTER
September 2010
Purpose made frame and standard door
New door and frame fitted , now the canopy and brackets , photo to follow
BEFORE
September 2010
First a new door and frame , goodbye plastic rubbish
Out with the old
December 2010
Smaller window replaced
Smaller window was also replaced, details as existing, fully decorated
AFTER
December 2010
New bay window
Conservation glass, fully decorated, as existing
DURING
December 2010
Old bay gone
New purpose made bay on its way
DURING
December 2010
Oh dear
More rot inside the bay
BEFORE
December 2010
Replacment bay
Rotten bay needs replacment
November 2010
New windows
Supply and fit two large hispec windows, fully furnished.
November 2010
New windows
Supply and fit two large hispec windows, fully furnished.
March 2010
Painted cupboards and shelving
Painted cupboards and shelving
June 2010
Oak door and frame
Purpose made frame ready for oak door, supply and fit
July 2010
Oak draw boxes
Purpose made solid oak draw boxes, dovetailed
July 2010
Country kitchen
Supply and fit traditional country kitchen, solid oak draw fronts and tops.
August 2010
Fitted wardrobe
Painted fitted wardrobe
October 2010
Block gloss unit
Purpose made black sprayed media cupboard
October 2010
Black gloss furniture
Purpose made black sprayed shelving unit
January 2009
Detail
January 2009
Purpose made kitchen using Tulip wood great for painting Customers own design.
January 2009
Shutters for Bignor House
January 2009
Purpose made door and surround
January 2009
Purpose made table and cupboards in the back ground
January 2009
Maple sideboard
January 2009
Purpose made oak draw unit
January 2009
Chichester shopfront
January 2009
Purpose made pinewood doors and frame
January 2009
Purpose made hardwood front door
January 2009
Internal shoe draws for purpose made wardrobes
Shoe draws for inside fitted wardrobe
January 2009
Oak shopfront in Emsworth
Oak shopfont supplied and fitted
July 2010
Supply and fit kitchen.
Purpose made kitchen, oak draw boxes, soft close runners
January 2009
Detail
AFTER
March 2010
Supply and fit purpose made cupboards and shelving.
To keep costs down we kept this project simple as requested
BEFORE
March 2010
Supply and fit purpose made cupboards and shelving.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?