Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Switch 32
22
work photos
My Profile
Page
My Customer
Feedback
My Photos
AFTER
August 2010
Installed electric heating mat and tiled over conservatory.
And I tiled it too.
BEFORE
August 2010
Installed electric heating mat and tiled over conservatory.
Installing sensors and rcd protection
BEFORE
August 2010
Installed electric heating mat and tiled over conservatory.
Heating cable being laid
AFTER
August 2010
The finished article
New meter tails, earthing and bonding cables too.
AFTER
August 2010
New Consumer unit labelled up
Safer and prettier
AFTER
August 2010
The new 10 way consumer unit
BEFORE
August 2010
Same fuse box
Same mess
BEFORE
August 2010
Old style rewirable fuse box
What a mess
DURING
July 2011
Rewire of kitchen.
Plaster up, wall units up, sockets fitted, set level and level with each othert, though pic does not seem to indicate that.
DURING
July 2011
Rewire of kitchen.
Ah ha We have plaster. tiles still to come The pipe coming up is the gas....nothing to do with my wiring o
DURING
July 2011
Rewire of kitchen.
Top is double socket, as requested. Below are the flex outlets for fridge and dishwasher. Still no plaster though.
DURING
July 2011
Rewire of kitchen.
Looks ugly right now. But there is no plaster up yet.
DURING
July 2011
Rewire of kitchen.
This grid switched fridge, dishwasher, washing machine and hob. But they requested it set UNDER the breakfast bar. So I did.
DURING
July 2011
Rewire of kitchen.
You try getting sockets level that are 3 feet apart o
DURING
July 2011
Rewire of kitchen.
One of those rare occasions when I had a blank canvass to work from
BEFORE
January 2011
Sort out some lighting
This took some sorting, as the customer puts it.
BEFORE
March 2011
Complete rewire of house
Another DIY tangle for me to deal with.
BEFORE
March 2011
Complete rewire of house
This sort of thing prompted the rewire. What a mess
AFTER
November 2010
Installed new consumer unit, kitchen extractor fan, bathroom extractor fan, new double socket, new b
And now there is. Vented to the outside, not just through a filter.
BEFORE
November 2010
Installed new consumer unit, kitchen extractor fan, bathroom extractor fan, new double socket, new b
No Extraction
AFTER
November 2010
Installed new consumer unit, kitchen extractor fan, bathroom extractor fan, new double socket, new b
New light in new position and ceiling made good. Extractor in ceiling above window.
BEFORE
November 2010
Installed new consumer unit, kitchen extractor fan, bathroom extractor fan, new double socket, new b
Old bathroom light
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?