Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
TMD The Maintenance Department
58
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
May 2011
This is the house before demolition
TMD extension project
BEFORE
May 2011
This is the origingnal building before demolition
TMD extension project
BEFORE
May 2011
EXtension project
Demolition in progress
BEFORE
May 2011
Extension poject
TMD have demolished part of the building
DURING
May 2011
Extension project
Ground ready for marking out
DURING
May 2011
Extension project
Ground marked out for the pile foundations
BEFORE
October 2009
Loft Conversion
BEFORE
October 2009
Loft Conversion
BEFORE
October 2009
Loft Conversion
Stud walls being erected
BEFORE
October 2009
Loft Conversion
BEFORE
October 2009
Loft Conversion
BEFORE
October 2009
Loft Conversion
This is the insulation going in
BEFORE
October 2009
Velux windows in loft conversion
These windows are in the loft conversion
AFTER
October 2009
Loft Conversion
AFTER
October 2009
Loft Conversion
This is a room in the loft conversion that TMD built
AFTER
December 2009
Loft Conversion
This is the section with the stairs now finished.
AFTER
July 2010
Fascia Soffit
October 2009
New Fascia Soffit
AFTER
December 2009
Kitchen refit and carpentry.
AFTER
December 2009
Kitchen refit and carpentry.
TMD instaled and finished this kitchen
October 2009
New Fascia Soffit
October 2009
New Fascia Soffit
October 2009
New Porch
This Porch is being built by TMD
AFTER
October 2009
External Decoration
This house was repainted by TMD
AFTER
October 2009
External Decoration
This house was repainted by TMD
AFTER
October 2009
New Bathroom Tiling
This was a bathroom which TMD installed
AFTER
October 2009
New Bathroom
This a bathroom which has recently been installed and finished by The Maintenance Department
AFTER
September 2009
Front porch.
This is a porch that TMD constructed with a new flat Roof
AFTER
September 2009
Front porch.
September 2009
Front porch.
AFTER
September 2009
Front porch.
BEFORE
July 2010
TMD renewal of stair case
BEFORE
July 2010
Staircase Renewal
TMD rebuilt this staircase
BEFORE
July 2010
Staircase Renewal
BEFORE
July 2010
Staicase renewal
BEFORE
October 2009
Stair Case
These stairs were built and installed by the The Maintenance Department
BEFORE
July 2010
Staircase renewal
BEFORE
July 2010
Staircase renewal
AFTER
July 2010
Stair case renewal
AFTER
October 2009
New Stair Case
These stairs were built and installed by the The Maintenance Department
AFTER
July 2010
Staircase renewal
AFTER
July 2010
Staircase renewal
AFTER
September 2010
Long wooden fence with concrete posts took down brick wall.
This was the finished fence after TMD took down the dangerous brick wall
AFTER
September 2010
Long wooden fence with concrete posts took down brick wall.
TMD also rebuilt the corner of this wall so that it matched in with the rest
September 2010
Long wooden fence with concrete posts took down brick wall.
This is a new close boarded fence that TMD constucted
AFTER
July 2010
Two chimney stacks rebuilt with flashing around base, ridge tiles repointed, and general maintenanc
New Ridges that TMD have rebeded with a sand cement Mortar
AFTER
July 2010
Two chimney stacks rebuilt with flashing around base, ridge tiles repointed, and general maintenanc
TMD has replaced all the Ridges Hips on the whole roof and rebuilt both chimmneys with new lead flashing where needed
AFTER
July 2010
Two chimney stacks rebuilt with flashing around base, ridge tiles repointed, and general maintenanc
TMD also replaced all the Ridges Hips on the roof due to the fact that there was no mortar under the old ones
AFTER
July 2010
Two chimney stacks rebuilt with flashing around base, ridge tiles repointed, and general maintenanc
This chimmney was rebuilt by TMD and all the lead work was replaced
BEFORE
July 2010
Two chimney stacks rebuilt with flashing around base, ridge tiles repointed, and general maintenanc
This old chimmney was about to fall down and had been built really badly
AFTER
March 2010
REPLACED 3 VELUX WINDOWS and BLINDS
AFTER
March 2010
REPLACED 3 VELUX WINDOWS and BLINDS
This is a velux blind that was fitted
AFTER
March 2010
REPLACED 3 VELUX WINDOWS and BLINDS
AFTER
June 2010
Rebuilding and repointing chimney stack.
AFTER
June 2010
Rebuilding and repointing chimney stack.
BEFORE
June 2010
Rebuilding and repointing chimney stack.
BEFORE
June 2010
Rebuilding and repointing chimney stack.
BEFORE
June 2010
Rebuilding and repointing chimney stack.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?