Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Andy P Ltd
63
photos of recent work
My Profile
My Feedback (51)
My Photos (63)
April 2010
Fitting Patio Doors
Window removed and replaced with patio door
April 2010
Slabbing
Slabbing and paving around a pool
April 2010
Inserting window
Cutting opening for 2nd floor window
April 2010
Brick work
Filling in of car port
BEFORE
April 2010
Before new conservatory
Adding conservatory to existing house
AFTER
April 2010
Conservatory
Glass and Poly Carb Conservatory on a 600 high dwarf wall
April 2010
Utility Room
Extended existing utility room fitting lintel to create opening
BEFORE
April 2010
New porch
Removal of old porch
AFTER
April 2010
Porch
Completed new UPVC Porch
BEFORE
April 2010
Removing of wall
Opening one room to another
AFTER
April 2010
Removal of wall
Completed job, ready for decoration
AFTER
June 2008
Removal of walls and then entire kitchen replaced with new kitchen.
AFTER
September 2012
cladding
BEFORE
September 2012
cladding
BEFORE
October 2011
Installation of new bedroom.
AFTER
October 2011
Installation of new bedroom.
AFTER
October 2011
Installation of new bedroom.
AFTER
October 2011
Installation of new bedroom.
AFTER
October 2011
Refit.Bath out shower in and retile
AFTER
August 2011
Alter en suite into a wet room
wet room
AFTER
April 2010
Fitting of fire door, guttering, boarding in roof and fitting new water tanks
AFTER
July 2011
Total refurbishment of family bathroom and ensuite shower room
BEFORE
July 2011
Total refurbishment of family bathroom and ensuite shower room
BEFORE
April 2010
Fitting of fire door, guttering, boarding in roof and fitting new water tanks
BEFORE
July 2011
Total refurbishment of family bathroom and ensuite shower room
AFTER
July 2011
Total refurbishment of family bathroom and ensuite shower room
BEFORE
February 2011
Conservatory
conservatory to be removed not quite large enough
AFTER
February 2011
Conservatory
tiled with underfloor heating
AFTER
February 2011
Conservatory
new conservatory thats better
BEFORE
November 2010
Conservatory rebuild in wood, new tile floor, and small repairs
All new frames built and new glass roof
AFTER
November 2010
Conservatory rebuild in wood, new tile floor, and small repairs
All new frames built and new glass roof
BEFORE
November 2010
chimney to be repaired
AFTER
November 2010
chimney complete
AFTER
November 2010
Dormer window refurb
BEFORE
November 2010
chimney to be repaired
BEFORE
November 2010
Access to get to chimney
Repair work
AFTER
November 2010
New roof spars in timber with glass
AFTER
August 2010
Three rooms restored after extensive water damage. Two months work
DURING
August 2010
Three rooms restored after extensive water damage. Two months work
DURING
August 2010
Three rooms restored after extensive water damage. Two months work
Walls boarded ready to plaster and tile
DURING
August 2010
Three rooms restored after extensive water damage. Two months work
Start of work putting bathroom back together, insulating floor
AFTER
August 2010
Chimney removal and gable end repair and repoint.
Gable after rebuild
DURING
August 2010
Chimney removal and gable end repair and repoint.
Gable removed ready to rebuild
AFTER
September 2010
Removal of internal load bearing wall to form kitchendiner
Wall removed tiles made good ,floor laid
AFTER
September 2010
Removal of internal load bearing wall to form kitchendiner
BEFORE
September 2010
Removal of internal load bearing wall to form kitchendiner
Before work started
BEFORE
September 2010
Removal of internal load bearing wall to form kitchendiner
start of work
June 2008
Removal of walls and then entire kitchen replaced with new kitchen.
Ready to decorate
June 2008
Removal of walls and then entire kitchen replaced with new kitchen.
Ready to tile
June 2008
Removal of walls and then entire kitchen replaced with new kitchen.
June 2008
Removal of walls and then entire kitchen replaced with new kitchen.
wall removed
June 2008
Removal of walls and then entire kitchen replaced with new kitchen.
ceiling propped and wall coming down
June 2008
Removal of walls and then entire kitchen replaced with new kitchen.
floor turned out to be very rotten so replaced and insulate
BEFORE
June 2008
Removal of walls and then entire kitchen replaced with new kitchen.
kitchen wall to be removed
BEFORE
June 2010
Demolish internal wall, replace ceiling, plaster walls and ceilings, fit new doors in loungedining
June 2010
Demolish internal wall, replace ceiling, plaster walls and ceilings, fit new doors in loungedining
work in progress
June 2010
Demolish internal wall, replace ceiling, plaster walls and ceilings, fit new doors in loungedining
work in progress skim walls and ceiling new cove and woodwork
AFTER
June 2010
Demolish internal wall, replace ceiling, plaster walls and ceilings, fit new doors in loungedining
BEFORE
May 2010
Erect a fully insulated porch.
AFTER
May 2010
Erect a fully insulated porch.
April 2010
kitchen
total kitchen refurb
April 2010
kitchen
completed kitchen
April 2010
garage roof
altering the pitch of a large garage roof
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?