Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Woodchip Carpentry
86
photos of recent work
My Profile
My Feedback (285)
My Photos (86)
BEFORE
August 2009
conservatory refit
AFTER
August 2009
conservatory refit
AFTER
August 2009
conservatory rebuild
take out old rotton frame and make new frame, mortice and tenon each joint, fit new window board, fir glass and seal, treat timber.
November 2009
new front door
August 2009
fit new byfold doors
BEFORE
August 2009
stud walling
to build stud wall with door in
AFTER
August 2009
stud walling
August 2009
new wall and french doors
to fit new wall into opening and fit french doors with skirting and arks
August 2009
oak doors
to fit 8 new oak doors
October 2009
Kitchen Refit
rip out old and replace new kitchen doors
October 2009
Kitchen door Refit
BEFORE
October 2009
Built a lobby
October 2011
Fitted cupboard
October 2011
Supplied and fitted 5 Oak veneer internal doors
AFTER
October 2011
Decking
BEFORE
October 2011
Decking
AFTER
September 2011
Fitted new kitchen
AFTER
November 2011
supply and fit kitchen and flooring
AFTER
September 2011
Installation of new kitchen
AFTER
September 2011
Installation of new kitchen
AFTER
August 2011
New garage roof erection of new wood out building
AFTER
August 2011
Replace,emnt of large area of rotten wood
November 2011
supply and fit kitchen
November 2011
supply and fit kitchen
AFTER
June 2011
Fit new stairs hand rails, balustersspindles and base rails
June 2011
Installation of book shelves.
June 2011
Wall to wall cupboards and shelves
AFTER
July 2011
Complete kitchen refit and 8 doors hung and glazed.
supply and fit new kitchen
August 2011
fit small cupboard
April 2011
2 x Velux windows installed.
March 2011
Fitting bifold doors.
AFTER
April 2011
Fitted bedroom wardrobe
make and fit new wardrobe
AFTER
March 2011
Fitted kitchen.
fitted kitchen
AFTER
January 2011
Integrating study and kitchen into one large kitchenbreakfast area
AFTER
January 2011
Integrating study and kitchen into one large kitchenbreakfast area
take out load bearing walls and replace kitchen and flooring
BEFORE
February 2011
Replace a kitchen
supply and fit new kitchen
AFTER
February 2011
Kitchen Refit and Fitting Internal doors and skirting board
kitchen refit and internal doors
December 2010
kitchen fit
supply and fit new kitchen
AFTER
November 2010
Kitchen install sundry carpentry
AFTER
November 2010
Kitchen install sundry carpentry
AFTER
December 2010
to supply and fit new kitchen and flooring
AFTER
December 2010
to supply and fit new kitchen and flooring
December 2010
to make and fit side panils with to split to rooms,
AFTER
November 2010
Build frame and shelves and hang sliding wardrobe
AFTER
November 2010
Oak flooring laid.
AFTER
November 2010
Laid oak wooden floor and hung 4 oak doors downstairs.
AFTER
July 2010
Builtin Wardrobes
DURING
December 2010
built in cupboard
December 2010
Kitchen Fitted
rip out and fit new kitchen
AFTER
December 2010
built in cupboard
December 2010
fascia, sofit and guttering
fitted to new garage roof
December 2010
garage roof
new roof
AFTER
October 2009
Built a lobby
BEFORE
September 2009
Lay Laminate flooring in Lounge and Hallway
AFTER
September 2009
Lay Laminate flooring in Lounge and Hallway
BEFORE
November 2009
Fitting of new front door and door frame
AFTER
November 2009
Fitting of new front door and door frame
BEFORE
November 2009
new wardrobe
to fit new wardrobe into alcove
AFTER
November 2009
new wardrobe
BEFORE
November 2009
new gates
to take out old and make new gates
AFTER
November 2009
new gates
take out old and make new gates
August 2009
fit new byfold doors and frame
to fit new byfold doors and internal doors
BEFORE
November 2009
new roof
AFTER
November 2009
new roof
August 2009
hang new internal doors
hang 8 new 4 panel oak doors
August 2010
Fitted new laminate flooring
August 2010
Refit utility lay new floor new cupboards and work tops. Move radiator and fit new sink.
August 2010
Refit utility lay new floor new cupboards and work tops. Move radiator and fit new sink.
rip out old units and supply and fit new units, worktop and floor
AFTER
August 2010
Repair wood rot in conservatory sills
BEFORE
August 2010
Repair wood rot in conservatory sills
AFTER
August 2010
Under Stair Cupboard
BEFORE
August 2010
Under Stair Cupboard
under stairs cupboard
AFTER
July 2010
build bookshelf
BEFORE
July 2010
build bookself
April 2010
Laying of Laminate flooring
May 2010
Hang External Front Door
July 2010
build wardrobes
July 2010
build wardrobe
July 2010
cut roof
July 2010
cut roof
June 2010
Hand built dining room alcove cupboards.
AFTER
July 2010
fit double doors
BEFORE
July 2010
fit double doors
March 2010
Fitting of External door
April 2010
Replaced garage roof to replace asbestos roof.
April 2010
Replaced garage roof to replace asbestos roof.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?