Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
YDM Property Maintenance
19
work photos
My Profile
Page
My Customer
Feedback
My Photos
AFTER
September 2010
Bathroom refit
Toilet, Vanity unit, Marble Tiles, Soft mood lighting, Under floor Heating, Humidistat Extractor
AFTER
September 2010
Bathroom Refit
Toilet and Basin, Colour changing mood lighting.
AFTER
September 2010
Bathroom refit
Lowered and insulated ceiling, plastered, Sealed unit down lighters, 3 port Diverter Thermostatic Valve, Bath filler and handset, Square shower head, Marble mosaic tiles, Inward opening easy clean shower screen, Cupboard
AFTER
July 2010
Painting exterior if house
With scaffolding prepare all of woodwork, wash down, apply flexible undercoat and gloss.
AFTER
July 2011
Front room Referb
AFTER
July 2011
Front room referb
Take off dado rail, Plaster ceilings and walls, All painting, Fit Laminate Flooring, Update Fittings
AFTER
July 2011
Dining Room Referb
As with front room referb
DURING
June 2009
Bathroom Referb
DURING
June 2009
Bathroom Referb
AFTER
June 2009
Bathroom referb
Total refit. Walls leveled, New plumbing, Electrics, Plastering of ceiling, Painting, Tiling
AFTER
June 2009
Bathroom Referb
Waterproofing and fitting of shower
AFTER
October 2010
Dental Decontamination Room
Strip out old fittings, Lay safety flooring, Fit base units, Fit and plumb 2 sinks and 1 wall hung basin with sensor taps and thermostatic valves, Add more electric sockets
AFTER
October 2010
Dental Decontamination Room
Fitting of wall hung basin, Thermostatic mixer valve, Mono bloc Tap, Hygiene board and boxing, Painting
AFTER
April 2009
Fencing
Take out old fencing, gate and posts. Supply and fit new
AFTER
November 2009
Tiling only for contractor
DURING
March 2009
Fitting Internal Doors, Part of house referb.
Fitting of two Internal doors with locks and roller catches. Part of house referb
DURING
October 2011
Bathroom refit
Fit shower tray and cubical, Bespoke glass brackets, Tiling, Vanity unit and basin, New sealed down lighters, Alterations to bathroom door and bath panel.
DURING
March 2009
Bathroom Referb, Part of house referb
Strip out bathroom, Fit new suite, Tile walls and floor, Paint walls, ceiling and woodwork
DURING
March 2009
Bathroom Referb, Part of house referb
Fitting of shower, bath, shower screen and tiling.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?