0845 408 4866
Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Mark Oliver Plumbing & Heating
120
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
May 2011
Oil Aga
OIl AGA prior to removal
DURING
May 2011
Oil AGA being dismantled
Oil Aga being dismantled
DURING
May 2011
AGA parts being bubble wrapped
Aga parts being bubble wrapped
DURING
May 2011
Oil AGA
Oil Aga being dismantled
DURING
May 2011
Oil AGA removal
AGA during removal
AFTER
May 2011
Aga dismantle completed
Oil Aga dismantle completed
BEFORE
July 2010
Full central heating installation incl pipework, radiators, oil boiler, oil tank, hot water cylinder
Ready to unpack
AFTER
July 2010
Full central heating installation incl pipework, radiators, oil boiler, oil tank, hot water cylinder
Boiler in situ connecting pipework
AFTER
August 2010
Relocation and replacement of oil boiler
Combination boiler oil fired Hot water and central heating
BEFORE
July 2010
Full central heating installation incl pipework, radiators, oil boiler, oil tank, hot water cylinder
Installing the Hot water cylinder and central heating pipework
AFTER
July 2010
Full central heating installation incl pipework, radiators, oil boiler, oil tank, hot water cylinder
Completed installation.
AFTER
July 2010
Full central heating installation incl pipework, radiators, oil boiler, oil tank, hot water cylinder
Completed installation.
BEFORE
June 2011
Rayburn 480K
Repair on a Rayburn 480K
June 2011
Rayburn 480K restoration
Removing seized combustion chamber baffles
DURING
June 2011
Rayburn 480K Damaged combustion chamber due to incorrect servicing
Removal of seized baffles
DURING
June 2011
Restoration of a Rayburn 480K
Repair to combustion chamber
DURING
June 2011
Rayburn 480K Boilercooker
Damaged combustion chamber
BEFORE
June 2011
Internal Combustion chamber on a Rayburn 480K
Damaged combustion chamber
AFTER
June 2011
Rayburn 480K
Replacement combustion chambers
DURING
June 2011
Kt...hard at work
DURING
June 2011
Rayburn 480K repair
Repair on a Rayburn 480K
DURING
June 2011
Rayburn 480K
Restoration in progress
AFTER
July 2010
Full central heating installation incl pipework, radiators, oil boiler, oil tank, hot water cylinder
Commissioning the installation
AFTER
July 2010
Full central heating installation incl pipework, radiators, oil boiler, oil tank, hot water cylinder
Radiator installation
BEFORE
April 2010
Decommissioning Trianco oil boiler
Oil boiler upgrade
AFTER
August 2010
Relocation and replacement of oil boiler
Grant Combination Oil Bolier 26E Exterior model
AFTER
August 2010
Relocation and replacement of oil boiler
Exterior Oil boiler and hi level flue
BEFORE
April 2010
New Boiler
Grant External Condensing oil boiler
AFTER
April 2010
Grant External Condensing Oil Boiler
Replacement Grant Exterior condensing Oil boiler
AFTER
May 2010
Installation of full central heating system in 200yr old cottage
Grant Exterior condensing Oil Boiler
BEFORE
April 2010
Oil Boiler upgrade
Decommissioning a Trianco Oil boiler
AFTER
April 2010
Grant Exterior Oil Boiler
Grant exterior Oil boiler High efficiency Condensing
AFTER
April 2010
Hot water cylinder twin coiled
Hot water cylinder twin coiled and heating controls
AFTER
April 2010
Twin column radiators
Column radiator with thermostatic valve
AFTER
May 2010
Installation of full central heating system in 200yr old cottage
Column Radiators
BEFORE
January 2010
Supply and install unvented hot water cylinder.
Old vented hot water cylinder
BEFORE
January 2010
Supply and install unvented hot water cylinder.
Unpacking the cylinder
AFTER
January 2010
Supply and install unvented hot water cylinder.
Replacement Unvented Hot water cylinder sealed central heating system.
November 2009
Water main installation team at work
Preparation for water main supply pipe
November 2009
Dedicated installation team.
Water main installation
November 2009
Water main installation
Trench prepared for water main installation
November 2009
External water mains supply pipe
Installation team preparing to install a Water main supply pipe
AFTER
June 2009
Grant External Oil boiler Vortex condensing appliance
Grant External oil boiler
AFTER
June 2009
Grant Exterior Oil boiler
Grant exterior Oil boiler
January 2009
Approved Registered Plumber
June 2009
Grant Training
Grant Training Condensing boilers
March 2009
A certificate of Competence for Installing Servcing Unvented cylinders. A Legal Requirement
June 2009
We promote our Business through Checkatrade.com
March 2009
City Guilds NVQ 2 Plumbing Certificate
June 2009
Grant Training Pressure Jet burner course
Pressure Jet Burner course
March 2009
AGA Rayburn Approved service technician
June 2009
Servicing a Esse twin pressure jet range.
Annual service of a Esse Range
June 2008
Exterior Oil boiler
Located in a suitable location, keeping the area tidy
June 2008
Exterior HE Sealed system oil boiler
An exterior oil boiler located at the side of the house.
BEFORE
November 2008
Oil Boiler upgrade Standard oil boiler to Condensing High efficiency
An existing standard efficiency oil boiler 15 years old
AFTER
November 2008
A High efficiency Oil boiler
, High heat output. low on the use of fuel.
June 2009
Mark Oliver Plumbing Heating at your Service
Company Van
BEFORE
January 2010
Installing a Oil condensing boiler
Installation of a condensing oil boiler
AFTER
January 2010
Solent Breezes Holiday Park, Warsash Hampshire
Replacement Condensing Oil boiler
AFTER
January 2010
Solent Breezes Holiday Park Replacement Oil Boiler
Replacement Oil boiler
May 2009
Unvented hot water cylinder
Installation of unvented cylinder
January 2009
Exterior condensing Oil boiler, final checks being made.
January 2009
Planning the job
January 2009
Radiator Installation
January 2009
Planning is crucial to get the job right
January 2009
Central Heating and hot water installation
January 2009
Larger home...bigger boiler, heats the house and the swimming pool.
January 2009
Worchester High Efficiency Oil boiler
January 2009
Installation
January 2009
Completion
January 2009
Replaced the wicks, ready to place back in the appliance
January 2009
Removed the Carbon deposits
January 2009
Cleaning Vapourising burner Rayburn
January 2009
In Need of a service,It is recommended every 12 months
commercial boiler combustion chamber
January 2009
A fire waiting to happen, can you see the fuel tanks by the boiler
January 2009
Boiler servicing
January 2009
Aga Servicing. Recommended every six months
January 2009
KT, our lady apprentice installing a cloakroom basin.
BEFORE
May 2009
Replacement condensing oil boiler
Oil boiler installation
May 2009
Planning the job
May 2009
Unvented hot water
Installing an unvented hot water cylinder
May 2009
Unvented Hot water
Installing a cylinder
May 2009
Installing the cylinder
May 2009
Job completed
AFTER
May 2009
Replacement High efficiency condensing oil boiler unvented hot water cylinder
BEFORE
June 2009
Old Myson Oil appliance with a leaking flue
Old appliance with a leaking flue
June 2009
Grant Vortex Pro Condensing oil boiler
AFTER
June 2009
Grant Vortex Pro 1526 Oil boiler
Completed installation
BEFORE
June 2009
Decommissioning Oil appliance Pre 1970 Parca oil boiler
Decommissioning a Pre 1970 Parca Oil boiler
AFTER
June 2009
Exterior Oil boiler
Fitting the flue on a Grant Exterior Oil boiler
May 2009
Central Heating
Alteration of pipe work
June 2009
Replacement Domestic Hot water cylinder
BEFORE
June 2009
Domestic hot water cylinder
Preparing to fit a twin coiled solar hot water cylinder
AFTER
June 2009
Twin coiled solar Hot water cylinder
Twin coiled hot water clyinder connected to a solar panel
June 2009
Annual Service of an Esse Range
June 2009
Servicing an Esse pressure Jet range
November 2009
An exterior oil Boiler
Exterior oil boiler
November 2009
Servicing of Rayburn 480K
Rayburn 480K service
November 2009
Rayburn service.
Cleaning the Baffles
November 2009
Split Plastic Oil Tank
Split in plastic oil tank.
November 2009
Grant Condensing Oil boiler
Exterior oil boiler
BEFORE
November 2009
out with the old vented cylinder
out with the old vented cylinder
BEFORE
November 2009
adding the pipe work
installing the pipe work
AFTER
November 2009
completed
Hot water On demand and at mains pressure.
November 2009
Water Main installation
Installation preparation to install a water main supply pipe
BEFORE
April 2010
Bathroom upgrade
Low level Toilet and cistern decommissioning
AFTER
April 2010
Replacement Bathroom prior to retiling
Replacement bathroom prior to retiling
AFTER
April 2010
Supply and install bathroom suite.
Tiling completed
BEFORE
April 2010
Bathroom upgrade
exsisting bathroom
AFTER
April 2010
Replacment Bath complete with hand grips.
Replacement bath prior to retiling
AFTER
April 2010
Supply and install bathroom suite.
Tiling completed
BEFORE
April 2010
Blocked fuel filter
Blocked fuel filter due to lack of proper service proceedure
AFTER
April 2010
Clean filter
Clean filter, better operating conditions, less likely to breakdown
AFTER
April 2010
Boiler service
Servicing a Grant Condensing boiler
AFTER
April 2010
Boiler service
Servicing a Grant Condensing oil boiler
AFTER
July 2010
Full central heating installation incl pipework, radiators, oil boiler, oil tank, hot water cylinder
Hot water cylinder heating controls
AFTER
August 2010
Relocation and replacement of oil boiler
Exterior oil boiler with a anti plume flue
AFTER
August 2010
Relocation and replacement of oil boiler
filterfire valve and tiger loop
AFTER
August 2010
Relocation and replacement of oil boiler
Exterior Oil Bolier Grant Vortex Pro
AFTER
August 2010
Relocation and replacement of oil boiler
Grant Combination oil boiler 26E
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?