0845 408 4866
Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
M B Roofing Ltd (Brighton)
210
work photos
My Profile
Page
My Customer
Feedback
My Photos
DURING
December 2011
replace old lead valley
Removing old lead valley, lead not the right width
AFTER
December 2011
New replacment lead valley
New valley fitted and tiling reset
BEFORE
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
old tatty look box b4 mb roofing arrived on site
AFTER
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
what a transformation, By MB ROOFING LTD
BEFORE
December 2011
old asphalt roof,
old asphalt roof, rotten main joist no insulation
DURING
December 2011
Exposed rotten joist
This is what lurks under your unvented cold flat roof,
DURING
December 2011
New timber joist
New treated joist, furrings and sub deck being laid ready for 96mm insulation slab
AFTER
December 2011
completed roof
new insulated deck, flashings, and 3 Layer Anderson high performance felt,
BEFORE
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
old tatty box and pan tile roof b4 mb roofing came on site
AFTER
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
front dormer and roof completed showing windows, fascia and soffit all fitted by MB ROOFING
BEFORE
August 2010
RERoofing July 2010
Replacment of old slate roof Compton Road Brighton
BEFORE
August 2010
RERoof July 2010
New felt battens and flat bay roof
AFTER
October 2011
New flat warm roof, new lead flashing, replacement of rotten roof decking
BEFORE
December 2011
striping up old felt roof.
Roof being striped and prepared for new insulation boards
DURING
December 2011
Warm insulated roof deck
Fitting of warm roof decking.
AFTER
December 2011
completed warm roof
Roof all completed, insulation 96mm, Anderson high performance 3 Layer flat roof
AFTER
August 2010
RERoofing July 2010
Redland 49 interlocking tiles, Compton Road, Brighton
BEFORE
December 2011
remove chimneystack
remove chimneystack woodingdean
AFTER
December 2011
chimney removal
chimney removed, match in new fascia and gutter,
BEFORE
August 2010
Warm flat roof July 2010
Strip old flat roof and fix new warm insulated deck
AFTER
August 2010
Warm flat roof July 2010
warm deck flat roof completed
BEFORE
May 2010
old rotten window removed from dormer
BEFORE
May 2010
dormer restoration, new insulation warm roof, Upvc window and fascia.
this dormer was completly changed by mb roofing, new insulation, new Upvc window fascia soffit and guttering,new lead flashing and window trays,tile cladding and warm insulated flat roof
AFTER
May 2010
Job Complete including extra work fitting new velux window, May 2010
BEFORE
July 2011
old flat roof window
old window b4 replacement of new roof lantern
AFTER
July 2011
New Upvc Flat roof lantern
reroofing of flat roof and fixing of new Roof lantern
May 2010
fitting of seven velux windows including blinds, May 2010
May 2010
New high performance mineral felt bay, May 2010
AFTER
May 2010
Fascia and soffit, May 2010
New Upvc fascia and slotted soffit
May 2010
New lead sokers and fixing of secret GRP gully may 2010
May 2010
New high performance mineral parapet capping on firewalls, new lead valleys, May 2010
AFTER
May 2010
New render and lead flashing May 2010
AFTER
May 2010
compete reroof and rendering of all firewalls May 2010
AFTER
May 2010
reroof, high performance mineral parapet capping fixed to firewall.May 2010
May 2010
New lead valleyrecutting and bedding of tiles, May 2010
BEFORE
April 2009
old roof patcham b4 replacment
solway avenue patcham b4 new roof
AFTER
April 2009
Complete new roof, new fascia, soffits and guttering
new tiled roof solway avenue patcham
BEFORE
February 2009
Old tiled roof Kings drive hassocks b4 replacment
AFTER
February 2009
Kings drive hassocks new roof completed in 3 days
BEFORE
November 2009
existing old roof patcham, brighton
front elevation b4 replacment
BEFORE
November 2009
reroofing patcham
front elevation new felt and battens, new tiles being loaded out
AFTER
November 2009
reroofing patcham
front elevation complete, scaffolding down
BEFORE
August 2009
new flat roof , Hollingdean, Brighton
Strip up old felt, fix new Upvc fascia gutter, 3No. Layer high performance built up felt.
AFTER
August 2009
new garage roof, Hollingdean Brighton
Finishing off,
August 2009
New felt bay roof, Part of reroofing job in brighton
High performance 3No. Layer built up felt roof.
August 2009
Reroof in Brighton July 09
Reroof, Redland 49 tiles, new flashing and mineral prapet capping
August 2009
Reroof in Brighton July 09
reroof redland 49, rear elevation, new velux, valley, Upvc fascia and gutters
BEFORE
January 2009
replacment of 2 flat roofs and removal of chimneystack
AFTER
January 2009
St Lukes Terrace Brighton, Completed Brown mineral.
BEFORE
January 2009
Old lead flashing fixed by cowboy roofers in Shoreham East Sussex
September 2009
The MB ROOFING VANS
AFTER
January 2009
New lead flashing fixed by MB ROOFING, Shoreham
BEFORE
January 2009
Firewall, Roundhill Crescent, Brighton, B4 new flashing and felt capping
AFTER
January 2009
Roundhill Crescent firewall with new flashing and felt capping.
BEFORE
January 2009
Old aspestos roof kingston Lewes, replace all timbers and fix new roof
AFTER
January 2009
Replacment of old aspestos roof KIngston Lewes, including new joist, decking and 3 Layer felt
BEFORE
February 2009
Osbourne Road, Brighton b4 new flashing, render and parapet capping
AFTER
February 2009
Osbourne Road, rear addition new lead, render and parapet capping
BEFORE
January 2009
Flat roof striped ready for new felt, Ditchling Road, Brighton
AFTER
January 2009
Flat roof Ditchling Road completed
BEFORE
May 2009
Old Pan yilr roof hollingdean terace, Brighton
Hollingdean terrace Brighton, removing old roof
AFTER
May 2009
Hollingdean Terrace Brighton new tiled roof and felt roof
Finished, new roof hollingdean Terrace, Brighton
BEFORE
January 2009
Old flat roof B4 replacment Buxton Road Brighton
AFTER
January 2009
Flat roof near completion Buxton Road Brighton
BEFORE
January 2009
Old garage roof b4 replacment of complete structure
BEFORE
January 2009
New joist work to Garage Roof in Brighton
BEFORE
January 2009
garage roof, new timber joist and decking Brighton
AFTER
January 2009
Garage roof Brighton, Completed, New joist,decking, fasca, guuter, 3 Layer felt
AFTER
January 2009
New 50sq Metre flat roof, Shoreham Beach
BEFORE
January 2009
New garage roof Woodingdean, Brighton 2nd Layer o felt
AFTER
January 2009
Garage flat roof woodingdean Completed
BEFORE
January 2009
Repair to rotten area of flat roof. Brighton
AFTER
January 2009
New flat roof, Bennett Road, Brighton
January 2009
Flat roof striped back to deacking, Buxton Road, Brighton
January 2009
removing old render from firewall, Hanover Brighton
January 2009
New flet roof and fixing of Velux flat roof light, Woodingdean
BEFORE
January 2009
flat roofs striped back to decking
BEFORE
January 2009
chimneystack removed between flat roofs
Chimneystack just taken down between flat roofs
AFTER
January 2009
1st flat roof completed, St Lukes Terrace, Brighton
AFTER
January 2009
Flat roofs completed, St Lukes Terrace, Brighton
January 2009
Single ply. Rephnol flat roof, Balfour Road, Brighton
January 2009
Single ply. Rephnol flat roof, Balfour Road, Brighton
January 2009
New Verge and lead flashing, Balfour Road Brighton
January 2009
Flat roof in Henfeild striped up back to old decking.
roof striped back ready for new felting
January 2009
Flat roof b4 replacment in Henfield, West Sussex
old felt roof ready to be striped up
January 2009
1st layer of venting felt Henfield
this is a venting layer of felt
January 2009
2nd layer of felt Henfield
2nd layer of felting bonded onto venting felt
January 2009
Henfield flat roof completed, tiling and ridge tiles to fix back.
top layer of brown mineral capping, detail work
January 2009
Bevendean Brighton, New lead flashing around chimneystack.
January 2009
Bevendean, Brighton New lead back gutter to chimneystack.
January 2009
Bevendean, stainless steel render beads fixed for rendering of chimneystack.
January 2009
Roundhill crescent, firewall new lead flashing and primed ready for felt capping.
January 2009
removal of old chippings and felt from flat roof, Lewes East Sussex
January 2009
2nd Layer of felt and new mineral drips. Lewes
January 2009
Completed flat roof, Lewes just b4 christmas
January 2009
Chester Terrcae, Brighton. Making good to work done by cowboy roofers this is B4
This window was fitted by another company, and the finished tiling was of poor standard and letting water into bathroom, we striped out and complely refelted and cut back tiling as it should have been done first time around.
January 2009
Tiles striped out and flashing kit removed.Chester Terrace, Brighton
January 2009
Removed old felt and battens, fixed new felt underlay and treated battens.chester Terrace
January 2009
Chester Terrcae, Brighton, work completed
January 2009
new tiled porch, fascia and gutter
January 2009
new tiled porch with fascia and gutter
BEFORE
January 2009
Old flat roof canopy roof,B4 new fascia, gutter, felting and lead work
BEFORE
January 2009
2nd Layer of felt and mineral drips, new Upvc fascia, gutter
AFTER
January 2009
old canopy roof, now replace with red mineral finish
January 2009
new garage roof, Surrenden Crescent Brighton
January 2009
New lead valley and box gutter, Blaker Street Brighton
January 2009
Bates Road Brighton, New Slate roof
bedding back ridge tiles on new slate roof
January 2009
New Tiled Roof, Bates Road Brighton
January 2009
Rear Elevation, New Roof Bates Road
January 2009
New Tiled Roof Eldred Avenue, Westdean
January 2009
New Tiled roof and dormer, Patcham
January 2009
New Upvc fascia and vented soffit Brighton
January 2009
New Lead Bay Roof, Vale Avenue Patcham
January 2009
New Upvc Fascia, soffit and guttering, Bolney West Sussex
January 2009
New Bay roof Byron Street Hove
January 2009
New bay decking, Upvc fascia Byron Street Hove
January 2009
Bentham Road, Brighton roof striped
January 2009
Bentham Rd, Brighton, rear bathroom roof new felt battens
January 2009
Bentham Rd, Brighton, New velux, flashings, refixing of tiles
January 2009
New lead valley being fitted Brybon Av Patcham
January 2009
fixing new lead soakers and step flashing, Hove seafront
January 2009
Take down top of defective stack, Chester terrace Brighton
January 2009
Rebuuild top of chimneystack and ensert new pots and cowls, chester terrace , brighton
February 2009
Kings Drive Hassocks, new felt roof
January 2009
New lead flashing and high perofrmance mineral parapet capping, Byron Street Hove
January 2009
Curved Bay roof Patcham Brighton
January 2009
New slate roof Hollingdean Terrace Brighton
February 2009
New lead valley, Lawrance Road Hove
February 2009
KIngs Drive Hassocks. New felt and battens
February 2009
Laying hip tiles, Kings drive hassocks
February 2009
new Tiles being layed kings drive hassocks
February 2009
Kings drive hassocks, bedding new hip tiles
February 2009
Osbourne Road, render and old lead removed
February 2009
Osbourne Road, rear RH firewall new lead and parapet capping
February 2009
Chanctonbury rd Brighton flat roof b4 replacment
February 2009
Chactonbury road new flat roof, mineral finish
February 2009
Flat roof b4 replacment, Addision Road Brighton
February 2009
Addision road, flat roof striped back to decking
February 2009
Addision raod finished just ridges to bed back
February 2009
Chanctonbury road new flat roof completed
March 2009
Firewall, Bear Road Brighton B4 new lead and parapet capping.
March 2009
Firewall Bear Road, Brighton, after new Lead and parapet capping.
February 2009
felting around chimneystacks chanctonbury road
March 2009
Flat roof done by Cowboys roofer 1Year ago Solway Avenue, patcham
March 2009
same flat roof solway Avenue, Patcham striped back to decking.
March 2009
Flat roof redone by real roofers, Solway Avenue, Patcham
March 2009
Part of roof reslated with new hips and ridges, Caple Avenue, PHaven
March 2009
Rerender of chimneystack, Geat collage street, Brighton
October 2008
Supply and fit 100 metres of metal gutter and replace old aspestos roof
Kingston lewes new joist and decking
April 2009
Complete new roof, new fascia, soffits and guttering solway avenue patcham
This roof was was completley striped. new tiles felt and battens and Upvc fascia, soffit and gutters
April 2009
Complete new roof, new fascia, soffits and guttering, solway Avenue Patcham
Rear elevation view of completed roof
April 2009
Fixing of new lead flashing Terminus street Brighton
Cutting out old tiles, ready for new felt, battens, tiles, lead and felt drip and capping
April 2009
Termnius Street Brighton
Old tiles, felt and batten removed
April 2009
Terminus Street
New felt and battens fixed
April 2009
Terminus Street
New tiling, lead flashing and felt drips and capping.
April 2009
Terminus street
new flashing
November 2008
60 Square metre flat room replacement rebed 50 ridge tiles.
top layer of mineral capping and new ridge tiles
May 2009
roof being marked out for tiling
AFTER
April 2009
Complete new roof, new fascia, soffits and guttering solway Avenue Patcham
Front elevation view of completed roof
July 2009
One of our two new vans
BEFORE
September 2009
New Tiled roof Ridgeway, woodingdean, Brighton
New build house
BEFORE
September 2009
Ridgeway Brighton
New felt and batten
AFTER
September 2009
Ridgeway Brighton
Roof completed, 7000 Tiles, Marley Dark Red
BEFORE
September 2009
Old asphalt roof Coldean Brighton
old asphalt and rotten decking
BEFORE
September 2009
striping up old roof and decking coldean, Brighton
removing old asphalt and chip board decking
BEFORE
September 2009
Flat roof coldean
ne wdecking and boxing in of pipe work around parapet
AFTER
September 2009
Flat roof coldean
Finished roof with boxed in parapet
BEFORE
September 2009
Old roof b4 replacment Peel Road, Brighton
Old tiled roof,
BEFORE
September 2009
Peel Road, Brighton Reroof
removing old feather edge boarding
BEFORE
September 2009
Peel Road, Brighton Reroof
New felt and battens
AFTER
September 2009
Peel Road, Brighton Reroof
Roof completed, Upvc fascia, gutter, rain pipes, removal of chimney, completed in 3 days
BEFORE
September 2009
complete dormer overhaul Pelham Square, Brighton
New lead flashing, new Upvc fascia and gutter, new high performance felt roof and cheeks
AFTER
September 2009
complete dormer overhaul Pelham Square, Brighton
finished job
BEFORE
November 2009
old flat roof b4 replacment franklin Rd, Brighton
replace roof fix new dome
BEFORE
November 2009
flat roof replacment fanklin Rd Brighton
Old rotten decking found when roof was striped
BEFORE
November 2009
flat roof replacment franklin Rd Brighton
roo striped, new decking and boxing in of pipe work
AFTER
November 2009
flat roof replacment fanklin Rd Brighton
roof completed with new cox dome
BEFORE
November 2009
existing old roof patcham, brighton
rear elevation of old roof
BEFORE
November 2009
existing old roof patcham, brighton
roof being striped
BEFORE
November 2009
existing old roof patcham, brighton
front elevation striped
BEFORE
November 2009
reroofing patcham
insulation being fixd rear eleavtion
BEFORE
November 2009
reroofing patcham
insulation being fixed front elevatio
BEFORE
November 2009
reroofing patcham
New felt and battens fixed
BEFORE
November 2009
reroofing patcham
rear elevation new tiles being loaded onto roof
AFTER
November 2009
reroofing patcham
MP leadwork finishing off lead detail around chimneys
AFTER
November 2009
reroofing patcham
front elevation finishing off lead detail
AFTER
November 2009
reroofing patcham
rear eleavtion
AFTER
November 2009
reroofing patcham
Rear elevation view of completed roof
BEFORE
October 2009
Flat roof replacement and rebedding of hip tiles
fitting of a warm insulated roof
BEFORE
October 2009
Flat roof replacement and rebedding of hip tiles
preparing for insulation boards
BEFORE
October 2009
Flat roof replacement and rebedding of hip tiles
new 96mm insulation boards fitted,
AFTER
October 2009
Flat roof replacement and rebedding of hip tiles
finished job now fully insulated to builing regulation
BEFORE
November 2009
Replace flat roof
flat roof lifted by high winds
BEFORE
November 2009
Replace flat roof
2nd layer of felt fixed between showers
BEFORE
November 2009
Replace flat roof
sealing around pipe
AFTER
November 2009
Replace flat roof
The finished job
BEFORE
November 2009
Replace valleys Verge and ridge tiles.
old valleys b4 replament
BEFORE
November 2009
Replace valleys Verge and ridge tiles.
tiles striped out, new felt and battens
BEFORE
November 2009
Replace valleys Verge and ridge tiles.
valley being recut and bedded onto a new valley troth
BEFORE
November 2009
Replace valleys Verge and ridge tiles.
Valley and verge tiles being bedded in new mortar
AFTER
November 2009
Replace valleys Verge and ridge tiles.
job finished
BEFORE
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
new insulation and boarding of roof and dormers to building regs, and fitting of new windows
BEFORE
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
finishing off instalation of warm roof decking on dormer roofs to building regs
AFTER
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
new warm deck roof completed with a 3Layer high performance felt roof
BEFORE
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
new felt, batten insulation and breathable underlay, all lead details and valley troths
BEFORE
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
Bedding verge tiles onto a tile undercloak,
AFTER
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
Finished roof showing, flat roof, front dormer, new fascia, soffit and gutters
AFTER
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
transformation of the front dormer nearly complete
AFTER
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
transformation of roof by mb roofing,
AFTER
October 2010
Complete ReRoofing Warm flat roof insulation of main roofs up to Building regs
competion of roof and dormer,
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?