Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
MJA Electrical
38
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
July 2009
Garage conversion.
This will become two single bedrooms and a shower room with WC
BEFORE
July 2009
Garage conversion.
BEFORE
July 2009
Garage conversion.
Thats the front bricked up then. Work is progressing slowly.
BEFORE
July 2009
Garage conversion.
The side view before alterations are made.
BEFORE
July 2009
Garage conversion.
View from the inside. I should be stood in the bedroom here in a couple of weeks time.
BEFORE
July 2009
Garage Conversion
This is where the shower room will be.
AFTER
July 2009
Garage Conversion
The new overhead supply on a catenary line
AFTER
July 2009
Garage Conversion
The other end of the armoured overhead cable
BEFORE
June 2009
Rainwater Harvesting The future
Waiting for the tank and pipework to be installed so we can run the cabling for the pump and level sensors.
BEFORE
June 2009
Rainwater Harvesting The future
Ok the tanks in. Just the pipework and ducting in next picture.
AFTER
June 2009
Rainwater Harvesting The future
The indoor unit with newly installed spur and trunking to the right. Not quite finished yet.
BEFORE
March 2007
The old fuseboard in a large restaurant. What a mess.
Unfortunately no after photo but a nice new 3 phase board was installed.
BEFORE
March 2007
The same restaurant. This is the bottom half of the cupboard
June 2009
A very old boiler. The new one now outside
Wire in a new exterior oil boiler new central heating controls.
BEFORE
June 2009
A New kitchen required
A job in Lymington. Some way to travel but we were highly recommended
AFTER
July 2009
The new oven wired and ready for use.
BEFORE
June 2009
Work underway
Work still in progress
AFTER
July 2009
Hard to imagine it before
Much better
AFTER
July 2009
Our quality accessories fitted as standard
BEFORE
June 2009
The existing kitchen light
A modern replacement needed here we think
AFTER
July 2009
Thats better
BEFORE
June 2009
Could this kitchen sink any lower
Our first fix done. Time for the kitchen fitter to do his bit
AFTER
July 2009
No longer have that sinking feeling
Now there really is a sink
AFTER
July 2009
New cooker hood ready to extract the nasy odours
AFTER
July 2009
17th Edition Consumer unit installed
AFTER
July 2009
Circuits labelled as required by BS7671 2008
AFTER
July 2009
Labelling
Labelled as required
AFTER
July 2009
Mains operated lithium backup smoke detectors fitted
May 2009
Recently installed by an unknown builder.
Customer advised that work did not comply and surprise surprise no certificate was issued.
May 2009
Another bit of bad practice.
A good reason to use an approved contractor such as MJA
May 2009
Cables in loft by Bob the Builder
Our clipped cables at the back vs Bobs thrown in effort in the foreground.
May 2009
Bob the Builders work again Sort of the right idea.
The pots should be over the lights to keep the insulation clear. We use the proper covers.
May 2009
This is how we found it
We didnt remove the cover, it was like this.
May 2008
For those lucky enough to have a swimming pool.
A new boiler installation with a zone for the pool heating.
BEFORE
September 2008
A call out to replace a consumer unit that suffered a small fire.
Forgot to take the after shot again.
BEFORE
July 2008
Another kitchen.
New consumer unit fitted and sockets first fixed. Waiting for the kitchen fitter to do his stuff.
BEFORE
July 2008
Another kitchen.
The other side of the kitchen with new cooker circuit installed to provide temporary power for other trades.
December 2008
A Christmas call out. A fire waiting to happen. The plug has melted to the socket
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?