0845 408 4866
Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Parkinson Restorations Ltd
183
work photos
My Profile
Page
My Customer
Feedback
My Photos
BEFORE
December 2010
Fencing replacement using concrete posts and gravel boards, lapped panels and secure rear gate, new
No single storey rear extension and kitchen
AFTER
December 2010
Fencing replacement using concrete posts and gravel boards, lapped panels and secure rear gate, new
Single storey rear extension project fully completed with new kitchen
AFTER
September 2009
Room overview Oak floor
AFTER
July 2009
Extensive first floor remodelling to create high spec bathroom in 6 weeks, moved new boiler to bathr
BEFORE
June 2009
Garden refurbishment
AFTER
June 2009
Garden refurbishment
BEFORE
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
AFTER
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
BEFORE
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
AFTER
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
BEFORE
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
AFTER
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
AFTER
January 2012
Laying wood floor in new extension area with skirting and thresholds
AFTER
January 2012
Replacement of old gas boiler with 2 loft tanks with new condensing combi gas boiler within new kitc
Arranged pipework to allow for future installation of water softner and reverse osmosis water filter system
AFTER
January 2012
Kitchen wall and floor tiling and kitchen wall and ceiling painting
BEFORE
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
BEFORE
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
BEFORE
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
AFTER
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
AFTER
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
AFTER
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
AFTER
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
AFTER
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
AFTER
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
AFTER
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
AFTER
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
AFTER
December 2011
Design, supply and installation of solid Oak kitchen and granite worktop with central island, fittin
AFTER
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
AFTER
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
AFTER
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
AFTER
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
DURING
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
DURING
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
DURING
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
DURING
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
DURING
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
DURING
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
BEFORE
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
DURING
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
BEFORE
December 2011
Remove existing structure and insert steel supports, create all foundations and slab base and erect
AFTER
December 2011
Remove existing decking and grass, prepare soil for turfing and patio laying, lay patio and step to
AFTER
December 2011
Remove existing decking and grass, prepare soil for turfing and patio laying, lay patio and step to
AFTER
December 2011
Remove existing decking and grass, prepare soil for turfing and patio laying, lay patio and step to
AFTER
December 2011
Remove garage in totality, break up base, provide power and lighting for shed and outdoors, amend sh
BEFORE
December 2011
Remove existing decking and grass, prepare soil for turfing and patio laying, lay patio and step to
BEFORE
December 2011
Remove existing decking and grass, prepare soil for turfing and patio laying, lay patio and step to
DURING
December 2011
Remove garage in totality, break up base, provide power and lighting for shed and outdoors, amend sh
DURING
December 2011
Remove garage in totality, break up base, provide power and lighting for shed and outdoors, amend sh
BEFORE
December 2011
Remove garage in totality, break up base, provide power and lighting for shed and outdoors, amend sh
BEFORE
December 2011
Remove garage, break up base, revise concrete shed, power outdoors, new door, guttering, render.
December 2011
Manufacture of garden brick built barbecue
Diagram and dimensions of trays and grates that the client wished to purchase themselves, relating to the design of the barbeque
December 2011
Manufacture of garden brick built barbecue
December 2011
Manufacture of garden brick built barbecue
December 2011
Manufacture of garden brick built barbecue
AFTER
January 2012
Supply and fitting of a new kitchen sink tap, also fix broken toilet pan base
BEFORE
January 2012
Supply and fitting of a new kitchen sink tap, also fix broken toilet pan base
AFTER
January 2012
Supply and fitting of a new kitchen sink tap, also fix broken toilet pan base
BEFORE
January 2012
Supply and fitting of a new kitchen sink tap, also fix broken toilet pan base
AFTER
December 2011
Cap off chimney ventflue and install fire surround panelling and hearth to offer a decorativestora
AFTER
December 2011
Add decorative metal panelling within MDF cupboard to act as a ducting system to bathroom airing cup
AFTER
December 2011
Remove 3 internal doors and plane to fit correctly.
AFTER
December 2011
Install plastic shower panels instead of tiles and install shower enclosure and seal with silicone
BEFORE
November 2011
Removal of existing bathroom and chimney breast, replanning of bathroom and insertion of bespoke cu
BEFORE
November 2011
Removal of existing bathroom and chimney breast, replanning of bathroom and insertion of bespoke cu
BEFORE
November 2011
Removal of existing bathroom and chimney breast, replanning of bathroom and insertion of bespoke cu
AFTER
December 2011
Removal of existing bathroom and chimney breast, replanning of bathroom and insertion of bespoke cu
AFTER
December 2011
Removal of existing bathroom and chimney breast, replanning of bathroom and insertion of bespoke cu
AFTER
December 2011
Removal of existing bathroom and chimney breast, replanning of bathroom and insertion of bespoke cu
AFTER
December 2011
Removal of existing bathroom and chimney breast, replanning of bathroom and insertion of bespoke cu
Bespoke shower enclosure, door and sealing strips
AFTER
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
AFTER
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
BEFORE
May 2010
Spec out and fit bookcases and shelves, remodel living room
BEFORE
May 2010
Spec out and fit bookcases and shelves, remodel living room
AFTER
May 2010
Spec out and fit bookcases and shelves, remodel living room
BEFORE
May 2010
Spec out and fit bookcases and shelves, remodel living room
AFTER
May 2010
Spec out and fit bookcases and shelves, remodel living room
BEFORE
May 2010
Spec out and fit bookcases and shelves, remodel living room
AFTER
May 2010
Spec out and fit bookcases and shelves, remodel living room
BEFORE
May 2010
Spec out and fit bookcases and shelves, remodel living room
AFTER
May 2010
Spec out and fit bookcases and shelves, remodel living room
BEFORE
April 2010
Drop ceiling in bathroom and insulate. Insulate floors in bathroom and study
AFTER
April 2010
Installation of bath, shower, screen, basin and WC cabinets.
BEFORE
April 2010
Installation of bath, shower, screen, basin and WC cabinets.
AFTER
April 2010
Installation of bath, shower, screen, basin and WC cabinets.
BEFORE
April 2010
Installation of bath, shower, screen, basin and WC cabinets.
AFTER
April 2010
Installation of bath, shower, screen, basin and WC cabinets.
BEFORE
March 2010
Install electric under floor heating in 2 rooms, carbon mat in study, cable in bathroom, 2 separate
AFTER
March 2010
Install electric under floor heating in 2 rooms, carbon mat in study, cable in bathroom, 2 separate
BEFORE
April 2010
Replace vented hot water cylinder with new mains pressure bigger system, changed cold also to mains
AFTER
April 2010
Replace vented hot water cylinder with new mains pressure bigger system, changed cold also to mains
BEFORE
April 2010
Installation of bath, shower, screen, basin and WC cabinets.
AFTER
April 2010
Drop ceiling in bathroom and insulate. Insulate floors in bathroom and study
BEFORE
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
AFTER
June 2011
Extensive sympathetic modernisation and garage conversion to 1960 style town house including numerou
BEFORE
June 2009
Garden refurbishment
AFTER
June 2009
Garden refurbishment
BEFORE
July 2011
Bedroom refurbishment with bespoke high spec floor to ceiling cupboards with spray painted doors, fu
AFTER
July 2011
Bedroom refurbishment with bespoke high spec floor to ceiling cupboards with spray painted doors, fu
AFTER
July 2011
Bedroom refurbishment with bespoke high spec floor to ceiling cupboards with spray painted doors, fu
BEFORE
February 2009
Remove flat door and porch and manufacture Bespoke replacement with double glazing. Paint to all, p
AFTER
February 2009
Remove flat door and porch and manufacture Bespoke replacement with double glazing. Paint to all, p
AFTER
February 2009
Remove flat door and porch and manufacture Bespoke replacement with double glazing. Paint to all, p
BEFORE
November 2010
Build new single storey rear extension, 3 remote control velux roof windows, tiled pitched roof, UPV
AFTER
November 2010
Build new single storey rear extension, 3 remote control velux roof windows, tiled pitched roof, UPV
BEFORE
December 2010
Design and installation of solid oak kitchen with granite worktop, wall and floor tiling and full de
AFTER
December 2010
Design and installation of solid oak kitchen with granite worktop, wall and floor tiling and full de
DURING
November 2010
Build new single storey rear extension, 3 remote control velux roof windows, tiled pitched roof, UPV
DURING
November 2010
Build new single storey rear extension, 3 remote control velux roof windows, tiled pitched roof, UPV
BEFORE
December 2010
Carpentryreplacement of all doors, door frames, skirting, architrave, and floating laminate
BEFORE
December 2010
CarpentryKitchen installation and all appliances with work top and ducting for suspended extractor,
DURING
November 2010
ElectricalPower inside and outside and lighting recabling and system design, as well as data, sa
DURING
November 2010
PlumbingInstallation of warm water under floor heating system and two towel warmer circuits
DURING
December 2010
PlasteringNew ceilings, new period plaster coving, full plastering of whole property
DURING
December 2010
DecorationComplete decoration to whole of property
DURING
September 2010
PlumbingNew boiler and hot water system, new supply and waste pipes throughout property
DURING
September 2010
PlumbingNew boiler and hot water system, new supply and waste pipes throughout property
AFTER
December 2010
Complete refurbishment to Victorian 120sqm 2 bed flat into 3 bed flat, project split into following
AFTER
December 2010
Complete refurbishment to Victorian 120sqm 2 bed flat into 3 bed flat, project split into following
AFTER
December 2010
Complete refurbishment to Victorian 120sqm 2 bed flat into 3 bed flat, project split into following
AFTER
December 2010
Complete refurbishment to Victorian 120sqm 2 bed flat into 3 bed flat, project split into following
AFTER
December 2010
Carpentryreplacement of all doors, door frames, skirting, architrave, and floating laminate
AFTER
November 2010
PlumbingInstallation of warm water under floor heating system and two towel warmer circuits
AFTER
December 2010
CarpentryKitchen installation and all appliances with work top and ducting for suspended extractor,
AFTER
December 2010
CarpentryKitchen installation and all appliances with work top and ducting for suspended extractor,
AFTER
December 2010
CarpentryKitchen installation and all appliances with work top and ducting for suspended extractor,
BEFORE
February 2011
Kitchen replacement with white solid wood units, glass splashback and granite worktop, floor tiling
AFTER
February 2011
Kitchen replacement with white solid wood units, glass splashback and granite worktop, floor tiling
BEFORE
February 2011
Kitchen replacement with white solid wood units, glass splashback and granite worktop, floor tiling
AFTER
February 2011
Kitchen replacement with white solid wood units, glass splashback and granite worktop, floor tiling
AFTER
May 2011
Painting soffit and repairing guttering
AFTER
April 2011
Scaffolding erection to front and rear to inspect and rectify guttering problems. Preparation and p
BEFORE
September 2009
Room overview
AFTER
September 2009
Shelving, Oak floor and TV cabinet
AFTER
September 2009
Bespoke tall cupboard with shaker doors
AFTER
September 2009
Tall cupboard inside
AFTER
September 2009
TV cabinet
AFTER
September 2009
Inside TV cabinet
BEFORE
April 2011
Replaster boarding to lobby and landing ceilings, paint strip stairs back to bare wood
BEFORE
June 2009
Garden refurbishment
AFTER
June 2009
Garden refurbishment
AFTER
July 2009
Extensive first floor remodelling to create high spec bathroom in 6 weeks, moved new boiler to bathr
AFTER
July 2009
Extensive first floor remodelling to create high spec bathroom in 6 weeks, moved new boiler to bathr
AFTER
July 2009
Extensive first floor remodelling to create high spec bathroom in 6 weeks, moved new boiler to bathr
Boiler move
BEFORE
May 2009
Remove rear chimney breast from ground floor to loft. Secure roof structure in loft. Making good t
AFTER
June 2009
Install gas combi boiler, radiators and all pipe work for central heating in each room. Remove old
Change old kitchen into utility room with boiler and seperate showerbasinWC room
BEFORE
June 2009
Install gas combi boiler, radiators and all pipe work for central heating in each room. Remove old
AFTER
May 2009
Remove rear chimney breast from ground floor to loft. Secure roof structure in loft. Making good t
Remove chimney breast and supply fit kitchen
BEFORE
June 2009
Garden refurbishment
AFTER
June 2009
Garden refurbishment
BEFORE
June 2009
Garden refurbishment
AFTER
June 2009
Garden refurbishment
BEFORE
May 2009
Remove rear chimney breast from ground floor to loft. Secure roof structure in loft. Making good t
Rewire, install gas fire
AFTER
June 2009
Install gas combi boiler, radiators and all pipe work for central heating in each room. Remove old
GAs fire replacement and rewire
BEFORE
May 2009
Rewire 3 bed house and install new consumer unit. Add many new power points throughout and new ligh
AFTER
May 2009
Rewire 3 bed house and install new consumer unit. Add many new power points throughout and new ligh
BEFORE
July 2009
Downstairs toilet damp proof repairs and full replacement
AFTER
July 2009
Downstairs toilet damp proof repairs and full replacement
AFTER
July 2009
Downstairs toilet damp proof repairs and full replacement
BEFORE
February 2007
Bathroom and shower remove and refit new. Carpentry, new ceiling and roof strengthening, electrics,
AFTER
February 2007
Bathroom and shower remove and refit new. Carpentry, new ceiling and roof strengthening, electrics,
BEFORE
September 2009
Remove old loft installation, add new and board out fully. Add extra lights to loft. Replace loft
AFTER
November 2009
Remove old loft installation, add new and board out fully. Add extra lights to loft. Replace loft
Finished ceilingloft access hatch
AFTER
November 2009
Remove old loft installation, add new and board out fully. Add extra lights to loft. Replace loft
Loft ladder and access
BEFORE
September 2009
Remove old loft installation, add new and board out fully. Add extra lights to loft. Replace loft
AFTER
November 2009
Remove old loft installation, add new and board out fully. Add extra lights to loft. Replace loft
BEFORE
September 2009
Remove old loft installation, add new and board out fully. Add extra lights to loft. Replace loft
AFTER
November 2009
Remove old loft installation, add new and board out fully. Add extra lights to loft. Replace loft
BEFORE
September 2009
Remove old loft installation, add new and board out fully. Add extra lights to loft. Replace loft
Loft before works
AFTER
November 2009
Remove old loft installation, add new and board out fully. Add extra lights to loft. Replace loft
BEFORE
September 2009
Complete strip out and high specification refit of separate WC and bathroom including cabinets, show
Seperate WC before works
AFTER
November 2009
Complete strip out and high specification refit of separate WC and bathroom including cabinets, show
Completed seperate WC and concealed cistern
BEFORE
September 2009
Complete strip out and high specification refit of separate WC and bathroom including cabinets, show
Bathroom before works
AFTER
November 2009
Complete strip out and high specification refit of separate WC and bathroom including cabinets, show
Bathroom completed
AFTER
November 2009
Complete strip out and high specification refit of separate WC and bathroom including cabinets, show
Vanity unit, mirrored cabinet and radiator
AFTER
November 2009
Complete strip out and high specification refit of separate WC and bathroom including cabinets, show
AFTER
November 2009
Complete strip out and high specification refit of separate WC and bathroom including cabinets, show
Shower completed
BEFORE
September 2009
Complete strip out and high specification refit of separate WC and bathroom including cabinets, show
Bathroom before works
AFTER
November 2009
Complete strip out and high specification refit of separate WC and bathroom including cabinets, show
Bathroom completed
AFTER
May 2007
Remove ceilings and walls in victorian property. Replasterboard and plaster 3 rooms. Install firepla
AFTER
May 2007
Remove ceilings and walls in victorian property. Replasterboard and plaster 3 rooms. Install firepla
AFTER
October 2007
Bathroom refub full strip out refit new shower bath electrics, carpentry, tiling, plumbing, pa
AFTER
December 2011
Remove existing bathroom floor tiles, inc bath panel and WC pan. Retile bathroom floor with flexibl
AFTER
December 2011
Fix inoperable and leaking shower valve and shower tray.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?