Home
For
Consumers
For
Trades
More from
Checkatrade
Checkatrade
Partners
Goodwin & Tucker Decorating Ltd.
30
work photos
My Profile
Page
My Customer
Feedback
My Photos
AFTER
December 2010
Major works repairs and redecorationoutside of block of Victorian flats.
External repairs and decoration to large victorian property Dyke Rd Brighton
BEFORE
August 2011
Complete Refurbishment of Victorian Property St Leonards on Sea
Rip out and refurbish 8 Flats and redecorate and repair external of property
AFTER
October 2011
Complete Refurbishment of Victorian Property St Leonards on Sea
external works Completed
AFTER
December 2011
Basement conversion North Chailey
Rip out and damp proof basement to country house and completely refurbish with Oak staircase and new flooring decoration and electrics
BEFORE
July 2011
Burgess Hill Kitchen refit and refurbish whole house
Remove chimney breast in kitchen and fit new completed kitchen and rewire whole house redecorate and refurbish
AFTER
January 2012
Kitchen Re fit Burgess Hill after chimney breast removed
BEFORE
October 2011
Redecorate Car Showroom and wood repairs
Renew frontage to Cuckfield Motor Company
AFTER
October 2011
Redecorate Car Showroom and wood repairs
Finished Job CMC
BEFORE
March 2009
Art room Southgate school early stages
Base units clasrrom area first fix
AFTER
March 2009
Art room Southgate school
Completed art room
March 2009
Art Room Kitchen Southgate School
Sink areas completed to Art room
September 2009
Install velux windowinsulate ceiling and decorate
Re decorate to the sunroom also install velux and reinsulate ceiling with celotex 60mm and overboard and dry line
July 2009
Major refurbishment of grade 2 listed hall house.
Remove all existing ceilings replace damaged timbers and dry line and plster new ceilings redecorate the whole interior and some of the exterior
October 2009
Entrance hall Montpelier Crescent Hove
Refurbishment of basement flat new plastering decorating rip out and replace shower room and new decking to the rear patio area
May 2009
Decking Mill Rd Burgess Hill
Supply and fit Decking
March 2009
Art room kitchen Southgate School
Completed Kicthen to the art room
March 2009
Art Room refit and decoration southgate School Crawley
Start of works to art room remove existing kitchen and units and rewire electrics and plumbing ready to take new fittings
July 2009
Downs Infant School Brighton
Redecoration of the main hall
October 2009
Flat refurbishment Hove Main bedroom
Decoration to main bed 3 Montpelier crescent
October 2009
Flat refurbishment Montpelier Crescent Hove
New shower room all trades invloved project managed by Goodwin Tucker ltd
June 2009
Cavity Wall trays Hertford Road Brighton
Remove old cavity trays above patio Doors and install new ones repebbledash and paint as existing
October 2009
Front Porch Cleveland Road Surbiton
Constuction of Porch to match existing brickwork and peroid victorian Terrace Surbiton Surrey
October 2009
Loft conversion Reynolds Road Hove
large loft conversion Reynolds Road Hove Winter 09
December 2006
Basement, Seven Dials, Brighton
New basement area including WC
May 2007
Keymer Rd Burgess Hill West Sx
Complete exterior decoration
September 2007
Park Court Garages, Burgess Hill
Exterior redecoration to garages and front balconies.
June 2008
New Conservatory Burgess Hill
Complete installation of new conservatory including groundworks, brickwork, interior plastering, electrics, flooring and decoration, UPVC installed Sussex Trade Windows.
May 2008
Brickwork Completed for Conservatory
July 2008
Kitchen ReFit, Warleigh Road, Brighton
Rip out, rewire, replaster, new plumbing, decoration and refit new Howdens Kitchen and tile floor
AFTER
July 2008
Finished kitchen at Warleigh Road, Brighton.
Checkatrade cannot authenticate any photographs displayed by members
Do you have any questions that I can help you with?